Wales · National park authority

Eryri National Park
Planning applications.

Explore collected planning applications and decisions for Eryri National Park. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
1,022Searchable applications
0Recorded as pending
90%Approval rate · 706 approved or refused records
71Refused applications

635 approved · 71 refused · 53 withdrawn. Received dates in our records: 27 Dec 2023 to 29 Sept 2026. Most recent record check: 4 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas14 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. All consultations completeNP4/13/265A

    Single storey extension to side of existing dwelling, installation of replacement gate, flag-stone pathway and extension of existing patio

    1 Rhos Cottages, Pont Gyfyng, Capel Curig. LL24 0DY

    Received 27 Feb 2025
  2. All consultations completeNP5/69/304B

    Construction of a two storey extension and detached garage

    Y Berth, Llwyngwril. LL37 2JJ

    Received 20 Mar 2024
  3. Extension of Time AgreedNP5/69/431A

    Outline Application for a single dwelling with all matters except access and layout reserved

    Dolgoed, Llwyngwril. LL37 2JE

    Received 2 Jul 2026
  4. All consultations completeNP5/73/LB74T

    Discharge Conditions 3, (Method statement relating to the protection of surfaces, features and the fabric of the building both internally and externally), 4 (Method statement relating to all the proposed works, including making good works), 5 (Stone samples), 9 (Details of the mortar to be used for repointing - including lime mortar mix, colour, texture and pointing finish) 10 (Details of the lime plaster mix, colour and texture) 15 (Programme of archaeological work), 16 (Report on the archaeological work), and 21 (Ecological mitigation) attached to Listed Building Consent NP5/73/LB74S dated 06/09/2023

    Plas Dol-y-Moch, Maentwrog. LL41 3YT

    Received 5 Mar 2024
  5. All consultations completeNP5/58/132A

    Erection of single storey side extension

    Broomfield, Talybont. LL43 2BZ

    Received 24 Jun 2025
  6. All consultations completeNP4/16/78K

    Change of use and extension of an outbuilding for use as an ancillary annex to the primary dwellinghouse (Tanaeldroch) including an attached bat roost building.

    Tanaeldroch, Dolwyddelan. LL25 0LZ

    Received 16 Feb 2024
  7. The selected application for <b>Railway Station, Beddgelert. LL55 4YW </B>has an onknown stageNP2/11/634K

    Construction of railway station building to include ticket office, café, indoor and outdoor seating, toilets, office and covered waiting area, and other associated infrastructure (Re-submission)

    Railway Station, Beddgelert. LL55 4YW

    Received 14 May 2024
  8. All consultations completeNP5/61/466A

    Non-Material Amendment to Planning Permission NP5/61/PIAW466 dated 19/01/2007 to increase height of garage to incorporate additional bedroom above

    Plot 5, Cae Main, Hwyfa'r Nant, Harlech. LL46 2UE

    Received 22 Dec 2025
  9. All consultations completeNP5/50/LUL432C

    Certificate of Lawfulness of Proposed Use or Development for the conversion of the property from a dwellinghouse (Use Class C3) and short-term let (Use Class C6) to a single dwellinghouse only (Use Class C3)

    The Old Vicarage, Balkan Hill, Aberdyfi. LL35 0NH

    Received 29 May 2025
  10. Decision Category -NP5/77/277C

    Erection of Single storey extension, enlarged parking area, access bridge, dormer window, additional rooflights, alterations to perimeter walls, windows and external doors.

    3 Caerffynnon, Talsarnau. LL47 6TA

    Received 10 Jul 2026
  11. All consultations completeNP5/65/379

    Removal of existing rear conservatory and erection of new single storey extension

    Nant Y Garreg, Tai Cynhaeaf, Dolgellau, LL40 2TU

    Received 12 Jun 2024
  12. All consultations completeNP5/53/8M

    Installation of a new refrigeration unit

    Co-op Store, 78-86, High Street, Bala. LL23 7AD

    Received 26 Jul 2024
  13. All consultations completeNP5/54/C486

    G.D.O. - Forest Road

    Cae'r Defaid Forestry, Rhydymain.

    Received 9 Jul 2026
  14. Extension of Time AgreedNP5/65/125E

    Replacement of existing static saravan with new shepherd's hut and erection of outside decking

    Tyddyn Du, Bontddu. LL40 2UA

    Received 23 Apr 2026
  15. The selected application for <b>Cae Haidd, Ffordd Caernarfon, Beddgelert, LL55 4UU </B>has an onknown stageNP2/11/293F

    Change of use of agricultural outbuilding for use as short-term, self-catering holiday accommodation falling within Use Class C6.

    Cae Haidd, Ffordd Caernarfon, Beddgelert, LL55 4UU

    Received 7 Feb 2024
  16. All consultations completeNP5/57/LB86D

    Listed Building Consent for the replacement of the existing gas boiler, external flue and internal radiators including associated alterations to pipework

    Sulis, Eldon Square, Dolgellau. LL40 1RD

    Received 1 Jul 2024
  17. All consultations completeNP4/29/LU143B

    Certificate of Lawful Use (Existing Use) for use as dwellinghouse (Use Class C3) and workshop

    Cae Fedwen, Penmachno. LL24 0YP

    Received 14 Mar 2024
  18. Decision Category -NP5/61/LUL293A

    Certificate of Lawful Use (Existing) to use property falling under Use Class C5 (Dwellinghouses, used otherwise than as sole or main residences)

    Llys Ioan, 5 Porkington Terrace, Harlech. LL46 2SH

    Received 4 Sept 2026
  19. All consultations completeNP5/64/182C

    Retrospective application for erection of agricultural shed

    Bryn Eglwys, Llanegryn. LL36 9SB

    Received 23 May 2025
  20. All consultations completeNP5/71/476C

    Vary Condition No.2 (amended plans) of Planning Consent NP5/71/476B dated 06/07/2023

    Lloches Don, Llanuwchllyn. LL23 7UE

    Received 7 Jun 2024
  21. All consultations completeNP5/57/226D

    Erection of gazebo for use in connection with children’s nursery

    Canolfan Deulu Dolgellau, Drill Hall, Dolgellau. LL40 1DE

    Received 18 Mar 2024
  22. All consultations completeNP5/59/811

    Installation of external air source heating pumps (50kw)

    Ysgol Bro Cynfal, Ffestiniog. LL41 4NF

    Received 12 Jun 2024
  23. All consultations completeNP5/75/68F

    Discharge Condition 4 (Details of Archaeological works) attached to Planning Permission NP5/75/68B dated 21/12/2023

    Land opposite Maesteg, Pennal. SY20 9DL

    Received 29 Apr 2026
  24. All consultations completeNP2/11/LB164C

    Listed Building Consent for the installation of secondary glazing, air source heat pump to rear to replace oil tank, and for the retention of repointing of chimney and replacement capping

    Ty Popty, Smith Street, Beddgelert. LL55 4LT

    Received 19 Feb 2024

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Eryri National Park

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Eryri National Park, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage