The development hereby permitted shall be commenced before the expiration of FIVE years from the date of this decision.
Rhaid dechrau'r datblygiad a ganiateir yma cyn pen PUM mlynedd o ddyddiad y penderfyniad hwn.
The development hereby permitted shall be carried out in accordance with the following approved plans: • Drawing No – 02-2025-01 - Location Plan & Block Plan • Drawing No- 02-2025-06 Revision No.-PA Issue 01 – Received on 13/08/2025 – Proposed Site Plan • Drawing No- 02-2025-04 – Proposed Ground Floor Plan • Drawing No- 02-2025-05 – Proposed Elevations • Green Infrastructure Statement - Received 13/08/2025
Mae'n rhaid cyflawni'r datblygiad a ganiateir yma yn unol â'r cynlluniau a gymeradwywyd isod: • Drawing No – 02-2025-01 - Location Plan & Block Plan • Drawing No- 02-2025-06 Revision No.-PA Issue 01 – Derbynwyd 13/08/2025 – Proposed Site Plan • Drawing No- 02-2025-04 – Proposed Ground Floor Plan • Drawing No- 02-2025-05 – Proposed Elevations • Green Infrastructure Statement - Derbynwyd 13/08/2025
The biodiversity enhancement measures detailed in the submitted Green Infrastructure Statement dated 13/08/2025 shall be implemented within 3 months following the substantial completion of the development hereby permitted and retained thereafter
Rhaid gweithredu'r mesurau gwella bioamrywiaeth a nodir yn y 'Green Infrastructure Statement' dyddiedig 13/08/2025 o fewn 3 mis yn dilyn cwblhau sylweddol y datblygiad a ganiateir drwy hyn a'u cadw wedi hynny
The bird boxes shall of woodstone/woodcrete construction and shall be installed within 3 months following the substantial completion of the development hereby permitted and retained thereafter
Rhaid i'r blychau adar fod o adeiladwaith carreg bren/concrit pren a rhaid eu gosod o fewn 3 mis ar ôl cwblhau'r datblygiad a ganiateir drwy hyn yn sylweddol a'u cadw wedi hynny
No surface water from any increase in the roof area of the building /or impermeable surfaces within its curtilage shall be allowed to drain directly or indirectly to the public sewerage system
Ni chaniateir i unrhyw dd"{r wyneb o unrhyw gynnydd yn arwynebedd to'r adeilad / neu arwynebau anhydraidd o fewn ei gwrtil ddraenio'n uniongyrchol nac yn anuniongyrchol i'r system garthffosiaeth gyhoeddus
To Comply with Section 91 (as amended) of the Town and Country Planning Act 1990.
I gydymffurfio a Rhan 91 (fel y diwygiwyd) o'r Ddeddf Gynllunio Gwlad a Thref 1990.
To define the permission and for the avoidance of doubt.
Er mwyn diffinio’r caniatâd ac i osgoi amheuaeth.
To secure biodiversity enhancement in accordance with Strategic Policy D of the adopted Eryri Local Development Plan and paragraph 6.4.5 of Planning Policy Wales
Er mwyn sicrhau gwelliant bioamrywiaeth yn unol â Pholisi Strategol D o Gynllun Datblygu Lleol Eryri a fabwysiadwyd a pharagraff 6.4.5 o Bolisi Cynllunio Cymru
To ensure a satisfactory standard of development and to minimise the risk of unacceptable harm or disturbance to protected species in accordance with Eryri Local Development Plan Policies and in particular Policy D
Er mwyn sicrhau safon foddhaol o ddatblygiad a lleihau'r risg o niwed neu aflonyddwch annerbyniol i rywogaethau gwarchodedig yn unol â Pholisïau Cynllun Datblygu Lleol Eryri ac yn benodol Polisi D
To prevent hydraulic overloading of the public sewerage system, to protect the health and safety of existing residents and ensure no pollution of or detriment to the environment
Er mwyn atal gorlwytho hydrolig y system garthffosiaeth gyhoeddus, er mwyn amddiffyn iechyd a diogelwch trigolion presennol a sicrhau nad oes unrhyw lygredd na niwed i'r amgylchedd
Related records
No related records were published in this section.
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.