Wales · National park authority

Eryri National Park
Planning applications.

Explore collected planning applications and decisions for Eryri National Park. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
1,022Searchable applications
0Recorded as pending
90%Approval rate · 706 approved or refused records
71Refused applications

635 approved · 71 refused · 53 withdrawn. Received dates in our records: 27 Dec 2023 to 29 Sept 2026. Most recent record check: 4 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas14 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Welsh Government / DataMapWales. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. All consultations completeNP5/58/427D

    Erection of first floor balcony and replacement of first floor window with french door

    2 Tyn Llidiart, High Street, Dyffryn Ardudwy. LL44 2EF

    Received 3 May 2024
  2. All consultations completeNP4/26/97L

    Retrospective application for the amended location of pods, provision of hardstanding area and hot tub surrounding the pods, siting of a washroom cubicle on site, provision of lighting scheme and provision/ implementation of amended landscaping scheme to that previously approved by application ref NP4/26/97J dated 04/03/2020

    Maes Madog, Capel Garmon. LL26 0RG

    Received 3 Sept 2024
  3. All consultations completeNP5/68/100H

    Non-material amendment to Planning Permission NP5/68/100C dated 09/02/2018 to change the material of the supporting roof columns from telegraph poles to rendered masonry on the bat roost space building

    Creua, Llanfrothen. LL48 6SH

    Received 10 Dec 2024
  4. All consultations completeNP5/77/336L

    Amendments to approved plans attached to Planning Permission NP5/77/336B dated 24/09/2021 including changes to the slope direction of the central section of the Tunnel Head House (THH) building roof, minor amendments to equipment within the THH/Sealing End Compound (SEC). Gradient of access road modified to a more gradual incline along the length to avoid a steep rise to the compound area. Inclusion of emergency generator and fuel storage tank and associated changes to drainage

    Land at Cilfor, Llandecwyn.

    Received 22 May 2026
  5. Extension of Time AgreedNP2/11/679H

    Enhancement to tourist accommodation and facilities through creation of additional touring/camping pitches, erection of new toilet blocks, and improvements to landscaping and biodiversity enhancement together with associated works

    Cae Du Camping Site, Beddgelert. LL55 4NE

    Received 30 Sept 2025
  6. All consultations completeNP4/11/398C

    Discharge Condition No.6 (Pedestrian crossing points) attached to Planning Consent NP4/11/398 dated 04/07/2023

    Land to rear of Medical Surgery, Betws-y-Coed. LL24 0BP

    Received 16 Aug 2024
  7. Extension of Time AgreedNP5/53/T154N

    Change of use of the ground floor from A3 (food and drnink) to A1 (retail) use and conversion of existing residential flat on upper floors to create 3 additional flats (4 in total)

    National Westminster Bank Buildings, 44-46 High Street, Bala. LL23 7NE

    Received 17 Jun 2024
  8. All consultations completeNP4/29/524A

    Removal of Condition Nos. 4 (Submission and approval of a Construction Environmental Management Plan) & 5 (Submission and approval of a scheme of Biodiversity Enhancement) attached to Planning Consent NP4/29/524 dated 04/40/2024

    Land at Iwerddon, Penmachno. LL24 0PS

    Received 25 Sept 2024
  9. All consultations completeNP5/50/AD95E

    Advertisement Consent for illuminated fascia and vinyl signage

    4-5 Sea View Terrace, Aberdyfi. LL35 0EE

    Received 13 Jul 2026
  10. All consultations completeNP5/57/LB284C

    Discharge Conditions 5 (External Plumbing and Vents) & 8 (Archaeological Recording) attached to Planning Permission NP5/57/LB284B dated 13/11/2024

    Plas-yn-Brithdir, Dolgellau. LL40 2PW

    Received 20 Dec 2024
  11. All consultations completeNP5/78/591

    Installation of solar panels

    Chalet 55, Trawsfynydd Holiday Village, Bronaber. LL41 4YB

    Received 22 Oct 2024
  12. All consultations completeNP5/57/LB103P

    Listed Building Consent for re-roofing building including replacement of damaged timber, leadwork to chimneys and valleys and replace the rainwater goods

    Cerrig Camu, Dolgellau. LL40 2SP

    Received 13 Nov 2024
  13. All consultations completeNP5/53/AD130G

    Advertisement Consent for installation of one A2 information board

    Llyn Tegid Foreshore, Bala. LL23 7SR

    Received 29 Apr 2025
  14. All consultations completeNP5/69/354F

    Retrospective application for the installation of a flue on an outbuilding

    Maes-y-Crynwyr, Llwyngwril. LL37 2JQ

    Received 27 Sept 2024
  15. All consultations completeNP5/53/576C

    Discharge Conditions 17 (Archaeological work) & 22 (Arboritcultural Method Statement) attached to Planning Permission NP5/53/576B dated 03/09/2025

    Land at Bala.

    Received 29 Sept 2025
  16. All consultations completeNP5/58/263C

    Removal of plastic cladding to South gable and installation of mineral slates cladding

    Arosfa, Ffordd Capel, Dyffryn Ardudwy. LL44 2DN

    Received 23 Jun 2024
  17. All consultations completeNP4/29/C482A

    Upgrading of forest tracks

    Land at Moel Llechwedd Hafod, Cwm Penmachno.

    Received 28 Jul 2026
  18. All consultations completeNP2/11/LB28H

    Listed Building Consent to replace sections of scalloped slates on roof with Welsh mineral slates and to replace uPVC rainwater goods with cast iron.

    Dolfriog Hall, Llanfrothen. LL48 6SN

    Received 26 Sept 2024
  19. All consultations completeNP4/12/214D

    Discharge Conditions 6 (Habitat Conservation Plan) & 7 (Construction Method Statement) attached to Planning Permission NP4/12/214C dated 15/02/2024

    Llyn Dulyn Reservoir, Tal-y-Bont.

    Received 7 Jan 2025
  20. All consultations completeNP5/50/647D

    Formation of a footpath (Active Travel Route) (Phase 1 only) (Re-submission)

    Land forming part of existing highway verge adjoining A943 between Aberdyfi & Tywyn.

    Received 8 May 2025
  21. All consultations completeNP2/16/LB194H

    Discharge Conditions No. 3 (Programme of archaeological recording) and No.4 (Detailed report on archaeological work) attached to Planning Consent NP2/16/LB194G dated 13/02/2024

    Erw Suran, Cwm Ystradllyn, Garndolbenmaen. LL51 9BQ

    Received 4 Sept 2024
  22. Decision Category -NP4/11/76X

    Retrospective application for erection of stretch tent for temporary 2 year period and timber clad sauna

    Glan Aber Hotel, Betws y Coed. LL24 0AB

    Received 18 Aug 2026
  23. All consultations completeNP5/54/476

    External alterations to existing hall to relocated entrance and form accessible ramp access

    Village Hall, Llanfachreth. LL40 2DY

    Received 9 Sept 2024
  24. All consultations completeNP5/57/T599A

    Retrospective application for the demolition and reconstruction of the rear extension

    Llety, 7 Idris Terrace, Dolgellau. LL40 1RT

    Received 20 Feb 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Eryri National Park

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Wales differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Eryri National Park, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage