Northern Ireland · Regional authority

Department for Infrastructure
Planning applications.

Explore collected planning applications and decisions for Department for Infrastructure. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
291Searchable applications
8Recorded as pending
91%Approval rate · 156 approved or refused records
14Refused applications

142 approved · 14 refused · 7 withdrawn. Received dates in our records: 27 Oct 2016 to 12 Aug 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasBoundary dataset not connected
Article 4 direction areasBoundary dataset not connected

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Department for Infrastructure conservation area guides. Contact the council for current designations.

More application records

  1. DeterminedSPD/2024/0038/DC

    Partial Discharge of Condition 3 (Planting and Woodland Management and Maintenance Plan in respect of the 400kV overhead line and associated 102 towers only) of Planning Permission Ref: O/2009/0792/F for the Erection of a single circuit 400kV overhead line (North South Interconnector)

    Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

    Received 11 Mar 2024
  2. DeterminedLA11/2018/0395/DC

    Discharge of Conditions 12 & 18 of Planning Application A/2012/0335/O

    Former army base (Fort George) Strand Road Derry

    Received 25 Apr 2018
  3. DeterminedLA11/2021/0677/PAN

    Decommissioning of the 9 turbines operational at Owenreagh I Wind Farm and repowering of the same with fewer, larger turbines (up to 2 no. turbines of up to 180m tip height and rotor diameter of up to 136m); modification of the planning permission for the granted Craignagapple Wind Farm to increase the tip height from 111m to up to 180m (rotor diameter of up to 136m) and increase the number of turbines from 6 up to 13, by extending the current site to the north, east and west; and associated ancillary infrastructure, including but not limited to substation compound including control building and other electrical infrastructure, new and upgraded access tracks including turning heads, crane hardstands, permanent anemometer mast, borrow pits, construction compound(s) and cable trenches.

    Existing operational Owenreagh Wind Farm (I&II) located on the eastern edge of the Sperrin Mountains on Owenreagh Hill approximately 6 km south east of Artigarvan village Co. Tyrone.

    Received 18 Jun 2021
  4. WithdrawnSPD/2025/0006/TBA

    Proposed 3no. free range poultry houses with internal egg stores (to contain in total 32,000 birds per house giving an overall site capacity of 96,000 birds) with 6no. heat exchangers, 6no. feed bins, 3no. underground wash tanks, concrete hardstanding and turning areas, access and associated site works

    Lands circa 1.3km East of Clabby approx. 625m South East of 115 Aghintain Road approx. 270m North East of 99 Clabby Road and approx. 410m North of 87 Clabby Road townlands of Mullaghsiloga…

    Received 13 Mar 2025
  5. DeterminedSPD/2025/0028/DC

    Partial Discharge of Condition 7 (Construction Phase Sustainable Travel Plan with revised scope of works) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub

    Lands: East Of Westlink (A12); South Of (Nos.127-9) an including Grosvenor Rd; At Intersection Of Grosvenor Rd/Stanley St; At Intersection Of Durham St/Grosvenor Rd; Intersection Of Fisherwick Pl/Howard St; Grt Victoria St(btw Nos. 1-3 to 27-45); Glengall St (btw Nos. 3-21); At Junction Of Hope St Bruce St And Grt Victoria St; At Junction Of Durham St Linfield Rd Sandy Rw And Hope St; At Sandy Rw From 2 Hurst Pk To 85-87 Sandy Rw; To N Of Former Whitehall Tobacco Works Linfield Rd Weavers Ct Business Pk/ Linfield Industrial Est Blythefield Primary School And Charter Youth Club; Weavers Ct Business Park And Railway Track Lands Surrounding Arellian Nursery Bounded By Utility St/Bentham Dr/Egmot Gds/ Felt St (to North); Prince Andrew Pk And Abingdon Drive (to South); Beit St Roosevelt Rse Roosevelt Sq

    Received 29 Sept 2025
  6. DeterminedLA09/2021/1513/DC

    Partial Discharge of Condition 2 (Planting and Woodland Management and Maintenance Plan in respect of the substation site only) on Planning Permission Ref: O/2013/0214/F for the Carrying out of associated works required for the erection of a single circuit 400kV overhead line (North South Interconnector)

    Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

    Received 14 Oct 2021
  7. DeterminedLA04/2017/0474/F

    Re-development of Casement Park to provide a new Stadium (Capacity of 34578). Development comprises: demolition of the existing facilities; construction of new pitch, boundary wall and stands, incorporating bar/restaurant & ancillary kitchen areas, conference, training, community and cultural heritage and education facilities, ancillary offices, player accommodation and welfare facilities, press/media & broadcast facilities, replacement floodlighting, stadium/event management suite, ground support facilities including new arrangements for vehicles and pedestrians, electronic display installations, storage, surface and undercroft car parking, hard and soft landscaping, new landscaped pedestrian access from Mooreland Park to Stockman's Lane. Use of the stadium for up to three outdoor music concerts in any calendar year.

    Lands at 88 - 104 Andersonstown Road and between 36 - 42 Mooreland Park and 202 - 206 Stockman's Lane

    Received 28 Feb 2017
  8. DeterminedSPD/2023/0003/DC

    Discharge of Condition 24 (Construction Method Statement (CMS)( Badgers) of Planning Permission Ref: O/2009/0792/F for the Erection of a single circuit 400kV overhead line (North South Interconnector)

    Land to the rear of 152 Trewmount Road in the townland of Turleenan, Moy, Dungannon, Co Tyrone and overhead electrical transmission line from Trewmount Road, Moy to the townlands of Crossreagh and Crossbane, Co Armagh.

    Received 18 Dec 2023
  9. DeterminedSPD/2024/0065/DC

    Discharge of Condition 31 (Landscape Layout and Planting Schedule) of Planning permission LA04/2017/1388/F for the Belfast Transport Hub

    Lands: To The East Of The Westlink (A12); South Of (Nos.127-9) And Including Grosvenor Road; At Intersection Of Grosvenor Road And Stanley Street; At The Intersection Of Durham Street And Grosvenor Road; At The Intersection Of Fisherwick Place And Howard Street; At Great Victoria Street (between Nos. 1-3 To 27-45); At Glengall Street (between Nos. 3-21); At The Junction Of Hope Street, Bruce Street And Great Victoria Street; At The Junction Of Durham Street, Linfield Road, Sandy Row And Hope Street; At Sandy Row From 2 Hurst Park To 85-87 Sandy Row, Gilpins Site; To North Of Former Whitehall Tobacco Works At Linfield Road, Weavers Court Business Park/ Linfield Industrial Estate, Blythefield Primary School And Charter Youth Club; At Weavers Court Business Park And Railway Track Lands Surrounding Arellian Nursery And Bounded By Utility Street/Bentham Drive/Egmot Gardens/ Felt Street (to North); Prince Andrew Park And Abingdon Drive (to South); Beit Street, Roosevelt Rise,Roosevelt Square

    Received 9 Sept 2024
  10. Consultation OpenLA10/2019/0177/TBA

    Drumlins Park Windfarm, consisting of 8 turbines up to 180m in height, ancillary development and grid connection. SCOPING REQUEST.

    West of Co Monaghan approximately 2km south west of the village of Newbliss c. 5km south of Clones and c. 7km north west of Cootehill Co. Cavan.

    Received 1 Feb 2019
  11. Consultation OpenLA11/2022/0151/TBA

    Proposed Windfarm development to include the construction of: 15 No. wind turbines (Tip height in the range of 162m to 173m, hub height in the range of 96m to 107m and rotor diameter in the range of 132m to 140m); 1 no. 100Kv electrical substation, control building and associated ancillary structures and works; 110kV connection from the proposed substation to the national electricity grid, via underground cabling within permanent cable ducts in the townlands of Meenyanly, Carnamoyle, Sorne, Owenkillew and Barnahone, Meenakeeragh Tullydush Upper, Annaslee and Ballynahone to the existing Trillick 110kV substation in the townland of Ballynahone; 1no. Meterological Mast of 104m in height; upgrade of existing infrastructure, new site access and access roads; 1 no. borrow pit; 1 permanent no. peat and spoil repository area; Permanent placement of peat and spoil along sections of site access roads as part of the peat and spoil management plan for the site; 2 no. temporary construction compounds; new recreational & amenity infrastructure; new link road associated with the construction works, temporary road works to facilitate the transport of materials for the development; Site Drainage; Site Signage; Ancillary Forestry Felling to facilitate construction and operation of the proposed development; and all associated ancillary site works.(FOR FULL PROPOSAL DESCRIPTION DETAILS -Please refer to the papers on the portal under the additional documentation section)

    In the townlands of Glenard Carrowmore or Glentogher Meenyanly Illies Sorne Carnamoyle Owenkillew and Barnahone Meenakeeragh Tullydush Upper Annaslee and Ballynahone Co. Donegal.

    Received 4 Feb 2022
  12. DeterminedLA08/2018/1422/DC

    Discharge of condition 5 (works affecting the A5 preferred route) of planning permission LA08/2016/1328/F

    High Pressure (HP) gas transmission pipeline (approx. 78km in length) between the proposed Above Ground Installation (AGI) opp. 64 Derryhale Rd Derryhale Portadown and 300m NW 371 Belfast Rd Tullykenneye Fivemiletown. Intermediate Pressure (IP) gas pipelines approximately 107 km in length from HP line to serve Cookstown Magherafelt Coalisland and Omagh Enniskillen and Derrylin. AGI sites: (i) opp. 64 Derryhale Rd Derryhale; (ii) 150m N of 39 Moss Rd Derrycoose; (iii) 50m W of 27 Old Moy Road Donnydeade; (iv) opp 10 Culnagrew Rd Culnagrew (v) 150m S of 59 Dergenagh Road Dergenagh (vi) 200m N of 23 Ballymagowan Road Tullybroom; (vii) 300m NW 371 Belfast Rd Tullykenneye.

    Received 9 Oct 2018
  13. Consultation OpenSPD/2023/0960/DC

    Discharge of Conditions 10, 11 & 12 – Monitoring of active nest or bird breeding during the bird breeding season

    Golandun Dolan, Killeter, Castlederg

    Received 4 May 2023
  14. Consultation OpenSPD/2025/0039/DC

    Full Discharge of Condition 23 (Sumbmission of Annual Site Monitoring Reports on the anniversary of the commencement of remediation operations until such time that it has been demonsrated to the satisfaction of the Department that the risks have been effectively managed) of Planning permission X/2009/0858/O for a mixed use development involving residential, retail, nursing home, sheltered accommodation, creche, business park and extension to salt marsh.

    Lands SouthEast of Comber By-pass.

    Received 8 Dec 2025
  15. DeterminedSPD/2026/0010/PAN

    The Repower of the existing Altahullion Phase I & II wind farm (s) comprising the following main components; (i) Decommissioning of the existing 29 No. turbines (ii) Removal and restoration of the existing substation building and compound (iii) Removal and restoration of the other redundant infrastructure (iv) erection of 8 No. wind turbines with an output of approximately 48MW (v) Construction of new of access tracks; (vi) Upgrade of existing access tracks; (vii) Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and external transformers and/or switchgears; (viii) temporary construction compound/laydown area; (ix) Turning heads and passing places incorporated within the site access infrastructure; (x) control building and substation compound; (xi) During construction and commissioning there would be a number of temporary works including a construction compound with car parking; temporary parts of crane hardstandings; welfare facilities.

    Existing Altahullion I & II Wind Farm (s), located in the townlands of Drum & Glenconway, Limavady, Co Derry/Londonderry which is located 3km north of Foreglen in Derry/Londonderry.

    Received 28 May 2026
  16. DeterminedLA01/2017/1289/LBC

    Regularisation of existing structures built 2006. Works involved demolition of entire rear of old premises with site excavation to rock. Newbuild concrete flat roofed structure to rear including 8 person lift. Whole project creates twenty eight en-suite four star guest rooms.

    The Adelphi 67-71 Main Street Portrush.

    Received 29 Sept 2017
  17. DeterminedSPD/2023/0011/DC

    Discharge of planning condition 9 (Construction Environmental Management Plan (CEMP) in relation to the substation site only) on Planning application O/2013/0214/F for the Carrying out of associated works required for the erection of a single circuit 400kV overhead line (North South Interconnector).

    Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

    Received 18 Dec 2023
  18. DeterminedLA06/2018/0997/RM

    Residential development comprising 167 housing units, open space, access roads, pumping station and other associated works.

    Lands South East of the Copelands Link Roundabout at the Comber Bypass

    Received 7 Sept 2018
  19. DeterminedLA08/2018/1467/DC

    Discharge of Condition 29 (Construction Method Statement) of Planning Permission LA08/2016/1328/F

    High Pressure (HP) gas transmission pipeline (approx. 78km in length) between the proposed Above Ground Installation (AGI) opp. 64 Derryhale Rd Derryhale Portadown and 300m NW 371 Belfast Rd Tullykenneye Fivemiletown. Intermediate Pressure (IP) gas pipelines approximately 107 km in length from HP line to serve Cookstown Magherafelt Coalisland and Omagh Enniskillen and Derrylin. AGI sites: (i) opp. 64 Derryhale Rd Derryhale; (ii) 150m N of 39 Moss Rd Derrycoose; (iii) 50m W of 27 Old Moy Road Donnydeade; (iv) opp 10 Culnagrew Rd Culnagrew (v) 150m S of 59 Dergenagh Road Dergenagh (vi) 200m N of 23 Ballymagowan Road Tullybroom; (vii) 300m NW 371 Belfast Rd Tullykenneye.

    Received 16 Oct 2018
  20. Consultation OpenSPD/2026/0004/DC

    The full Discharge of Condition 4 (the requirement to undertake survey of black guillemots) of planning permission Ref: LA04/2016/0421/F for the Construction of a new multi-purpose facility at D3 for the berthing of cruise ships, and for lay-by and transient storage of project cargo, breakbulk and dry bulk during cruise ship off season

    Land at D3 adjacent to the RSPB Reserve Airport Road West Belfast BT3 9DY

    Received 16 Feb 2026
  21. DeterminedLA08/2017/1126/DC

    Discharge of Condition 2 (programme of archaeological work) of planning approval LA08/2016/1328/F.

    High Pressure (HP) gas transmission pipeline (approx. 78km in length) between the proposed Above Ground Installation (AGI) opp. 64 Derryhale Rd Derryhale Portadown and 300m NW 371 Belfast Rd Tullykenneye Fivemiletown. Intermediate Pressure (IP) gas pipelines approximately 107 km in length from HP line to serve Cookstown Magherafelt Coalisland and Omagh Enniskillen and Derrylin. AGI sites: (i) opp. 64 Derryhale Rd Derryhale; (ii) 150m N of 39 Moss Rd Derrycoose; (iii) 50m W of 27 Old Moy Road Donnydeade; (iv) opp 10 Culnagrew Rd Culnagrew (v) 150m S of 59 Dergenagh Road Dergenagh (vi) 200m N of 23 Ballymagowan Road Tullybroom; (vii) 300m NW 371 Belfast Rd Tullykenneye.

    Received 14 Aug 2017
  22. DeterminedLA06/2017/0901/DC

    Discharge of Conditions 15 (storm drainage plan) and 29 (archaeological POW) of planning permission X/2009/0858/O.

    Lands SouthEast of Comber By-pass.

    Received 21 Jul 2017
  23. DeterminedLA04/2017/0189/DC

    Variation of construction hours previously agreed within the CEMP relating to planning permission LA04/2015/0301/F

    7 Airport Road Belfast BT3 9DY

    Received 12 Dec 2016
  24. DeterminedSPD/2025/0015/DC

    Partial Discharge of Condition 3 (Planting and Woodland Management and Maintenance Plan in respect of the 400kV overhead line and associated 102 towers only) of Planning Permission Ref: O/2009/0792/F for the Erection of a single circuit 400kV overhead line (North South Interconnector)

    Lands Between The Proposed New NIE Substation At The Rear Of 152 Trewmount Road Moy Co Tyrone In The Townland Of Turleenan To The Townlands Of Doohat Or Crossreagh And Crossbane Co Armagh On The Border With The Republic Of Ireland.

    Received 3 Jun 2025

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Department for Infrastructure

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Northern Ireland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Department for Infrastructure, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage