Council planning record

Proposed Windfarm development to include the construction of: 15 No. wind turbines (Tip height in the range of 162m to 173m, hub height in the range of 96m to 107m and rotor diameter in the range of 132m to 140m); 1 no. 100Kv electrical substation, control building and associated ancillary structures and works; 110kV connection from the proposed substation to the national electricity grid, via underground cabling within permanent cable ducts in the townlands of Meenyanly, Carnamoyle, Sorne, Owenkillew and Barnahone, Meenakeeragh Tullydush Upper, Annaslee and Ballynahone to the existing Trillick 110kV substation in the townland of Ballynahone; 1no. Meterological Mast of 104m in height; upgrade of existing infrastructure, new site access and access roads; 1 no. borrow pit; 1 permanent no. peat and spoil repository area; Permanent placement of peat and spoil along sections of site access roads as part of the peat and spoil management plan for the site; 2 no. temporary construction compounds; new recreational & amenity infrastructure; new link road associated with the construction works, temporary road works to facilitate the transport of materials for the development; Site Drainage; Site Signage; Ancillary Forestry Felling to facilitate construction and operation of the proposed development; and all associated ancillary site works.(FOR FULL PROPOSAL DESCRIPTION DETAILS -Please refer to the papers on the portal under the additional documentation section)

In the townlands of Glenard Carrowmore or Glentogher Meenyanly Illies Sorne Carnamoyle Owenkillew and Barnahone Meenakeeragh Tullydush Upper Annaslee and Ballynahone Co. Donegal.

Consultation OpenReference: LA11/2022/0151/TBADepartment for Infrastructure

Last published check: 4 Oct 2026, 12:40. Check the council record for more recent changes.

Application location

In the townlands of Glenard Carrowmore or Glentogher Meenyanly Illies Sorne Carnamoyle Owenkillew and Barnahone Meenakeeragh Tullydush Upper Annaslee and Ballynahone Co. Donegal.

This record has no verified map location.

Application summary

Status
Consultation Open
Application type
Transboundary Application
Received
4 Feb 2022
Validated
4 Feb 2022
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

Proposed Windfarm development to include the construction of: 15 No. wind turbines (Tip height in the range of 162m to 173m, hub height in the range of 96m to 107m and rotor diameter in the range of 132m to 140m); 1 no. 100Kv electrical substation, control building and associated ancillary structures and works; 110kV connection from the proposed substation to the national electricity grid, via underground cabling within permanent cable ducts in the townlands of Meenyanly, Carnamoyle, Sorne, Owenkillew and Barnahone, Meenakeeragh Tullydush Upper, Annaslee and Ballynahone to the existing Trillick 110kV substation in the townland of Ballynahone; 1no. Meterological Mast of 104m in height; upgrade of existing infrastructure, new site access and access roads; 1 no. borrow pit; 1 permanent no. peat and spoil repository area; Permanent placement of peat and spoil along sections of site access roads as part of the peat and spoil management plan for the site; 2 no. temporary construction compounds; new recreational & amenity infrastructure; new link road associated with the construction works, temporary road works to facilitate the transport of materials for the development; Site Drainage; Site Signage; Ancillary Forestry Felling to facilitate construction and operation of the proposed development; and all associated ancillary site works.(FOR FULL PROPOSAL DESCRIPTION DETAILS -Please refer to the papers on the portal under the additional documentation section)

Proposal details

Reference
LA11/2022/0151/TBA
Alternative references
PAO960631
Ward
Culmore

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 280 of 280

DocumentPublishedAction
PAO960631_AV-City of Derry Airport_Consultation Response_2142022153647.pdfConsultation Responses26 Nov 2022View
PAO960631_RA-Rivers Agency Headquarters_Consultation Response_74202216943.pdfConsultation Responses26 Nov 2022View
PAO960631_NIEA_Consultation Response_165202275458.PDFConsultation Responses26 Nov 2022View
PAO960631_NI Water - Strategic Applications_Consultation Response_287202211235.pdfConsultation Responses26 Nov 2022View
PAO960631_IN-Roads Service Londonderry_Consultation Response_852022134533.DOCXConsultation Responses26 Nov 2022View
PAO960631_Historic Environment Division (HED)_Consultation Response_2052022135533.PDFConsultation Responses26 Nov 2022View
PAO960631_Foyle Carlingford Irish Lights Commiss_Consultation Response_159202218528.pdfConsultation Responses26 Nov 2022View
PAO960631_Environmental Health Derry City and Stra_Consultation Response_1752022171656.docxConsultation Responses26 Nov 2022View
PAO960631_Chief Exec Derry City and Strabane_Consultation Response_2762022154728.docxConsultation Responses26 Nov 2022View
PAO960631_BW-Royal Society for the Protection of B_Consultation Response_2972022141549.pdfConsultation Responses26 Nov 2022View
NIEA responseConsultation Responses2 Feb 2024View
Foyle Carlingford & Irish Lights Commission responseConsultation Responses2 Feb 2024View
Royal Society for the Protection of Birds - Headqu responseConsultation Responses2 Feb 2024View
DFI Roads - Derry City & Strabane Office responseConsultation Responses2 Feb 2024View
Env Health Derry City And Strabane District Counci responseConsultation Responses2 Feb 2024View
DfI Rivers responseConsultation Responses2 Feb 2024View
Chief Exec Derry City And Strabane responseConsultation Responses2 Feb 2024View
NI Water - Windfarms responseConsultation Responses22 Apr 2024View
NI Water - Strategic Applications responseConsultation Responses22 Apr 2024View
Derry City & Strabane District Council Chief Ex Consultation Response Rec 17.04.2024Consultation Responses22 Apr 2024View
PAO960631_Site Layout or Block Plan_015Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_014Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_013Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_012Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_011Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_010Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_009Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_014Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_014Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_013Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_018Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_017Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_016Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_007Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Sign Elevations_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_015Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_015Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Road Access Plan_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_031Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_030Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_029Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_021Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_020Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_019Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_013Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_012Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_012Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_025Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_024Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_023Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_022Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_028Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_027Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_026Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_012Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_011Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_010Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_009Plans, Maps and Drawings26 Nov 2022View
PAO960631_Levels and Cross Sections_008Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_009Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_008Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_009Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_009Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_008Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_008Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_007Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_007Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_002Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_007Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Layout or Block Plan_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_008Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_007Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Site Location Plan_004Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_006Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_005Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_011Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_011Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_010Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_010Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Floor Plans_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Proposed Elevations_003Plans, Maps and Drawings26 Nov 2022View
PAO960631_Existing Floor Plans_001Plans, Maps and Drawings26 Nov 2022View
PAO960631_Car Parking Plan_001Plans, Maps and Drawings26 Nov 2022View
Appendix 12-2 Landscape Character AssessmentOther Supporting Information26 Nov 2022View
Appendix 14-2 Traffic Management PlanOther Supporting Information26 Nov 2022View
Appendix 14-1 Autotrack AssessmentOther Supporting Information26 Nov 2022View
Appendix 12-3 Viewpoint AssessmentOther Supporting Information26 Nov 2022View
Appendix 12-1 Landscape and Visual Impact Assessment MethodologyOther Supporting Information26 Nov 2022View
Appendix 11-9 Highest Predicted Wind Turbine Noise Levels-DirectionalOther Supporting Information26 Nov 2022View
Appendix 11-7 Highest Predicted Wind Turbine Noise Levels - OmnidirectionalOther Supporting Information26 Nov 2022View
Appendix 11-6 Predicted Wind Turbine Noise Levels for Various Hub Heights - OmnidirectionalOther Supporting Information26 Nov 2022View
Appendix 11-5 Sound Power Levels of Other Wind FarmsOther Supporting Information26 Nov 2022View
Appendix 11-4 Sound Power LevelsOther Supporting Information26 Nov 2022View
Appendix 11-3 Calculation Parameters and Settings for Noise ModelOther Supporting Information26 Nov 2022View
Appendix 11-1 Glossary of Acoustic TermsOther Supporting Information26 Nov 2022View
Appendix 10-1 - Carbon Loss CalculationOther Supporting Information26 Nov 2022View
Appendix 9-4 Drainage Controls IllustrationOther Supporting Information26 Nov 2022View
Appendix 7-8 Bird Monitoring ProgrammeOther Supporting Information26 Nov 2022View
Appendix 7-7 Collision Risk AssessmentOther Supporting Information26 Nov 2022View
Appendix 7-6 Supplementary Survey DataOther Supporting Information26 Nov 2022View
Appendix 7-3 Bird Survey Summary TablesOther Supporting Information26 Nov 2022View
Appendix 7-2 Bird Survey EffortOther Supporting Information26 Nov 2022View
Appendix 7-1 Bird Species ListOther Supporting Information26 Nov 2022View
Appendix 6-3 Kick sample - Macro-invertebrate surveysOther Supporting Information26 Nov 2022View
Appendix 6-1 Botanical Survey ResultsOther Supporting Information26 Nov 2022View
Appendix 5-3 Shadow Flicker Assessment - Comparison of ResultsOther Supporting Information26 Nov 2022View
Appendix 5-2 House Prices Study CXC Scotland 2016Other Supporting Information26 Nov 2022View
Appendix 4-6 Decommissioning PlanOther Supporting Information26 Nov 2022View
Appendix 4-2 Peat and Spoil Management PlanOther Supporting Information26 Nov 2022View
Appendix 4-1 - Site Layout DrawingsOther Supporting Information26 Nov 2022View
Appendix 2-6 Consideration of AfforestationOther Supporting Information26 Nov 2022View
Appendix 2-2 Glenard Wind Farm Community ReportOther Supporting Information26 Nov 2022View
PAO960631_Technical Specification_007Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_007Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_006Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_006Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_006Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_005Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_005Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_005Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_005Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_004Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_004Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_004Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_004Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_003Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_003Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_003Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_003Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_002Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_002Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_002Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_002Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_001Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_001Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_001Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_001Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_001Other Supporting Information26 Nov 2022View
Response To Observations 10.05.2023Other Supporting Information13 Sept 2023View
2023.05.10 Response To Observations F 190114 Part 1Other Supporting Information29 Sept 2023View
PAO960631_Technical Specification_033Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_032Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_031Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_030Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_030Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_029Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_029Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_028Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_028Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_027Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_027Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_026Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_026Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_025Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_025Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_024Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_024Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_023Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_023Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_022Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_022Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_021Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_021Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_020Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_020Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_019Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_019Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_018Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_018Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_017Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_017Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_016Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_016Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_015Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_015Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_014Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_014Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_013Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_013Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_013Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_012Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_012Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_012Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_011Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_011Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_011Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_010Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_010Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_010Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_009Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_009Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_009Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_008Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_008Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_008Other Supporting Information26 Nov 2022View
PAO960631_Technical Specification_007Other Supporting Information26 Nov 2022View
PAO960631_Miscellaneous_025Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_024Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_023Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_022Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_021Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_020Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_019Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_018Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_017Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_016Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_015Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_014Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_013Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_012Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_011Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_010Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_009Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_008Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_007Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_006Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_005Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_004Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_003Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_003Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_002Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_002Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_001Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_001Miscellaneous26 Nov 2022View
PAO960631_Miscellaneous_001Miscellaneous26 Nov 2022View
EIA Consultation Letter - R95UK1SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S79SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S78SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S77SVD003Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S77SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S76SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S75SVD003Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S75SVD000Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S74SVD002Consultation Requests26 Nov 2022View
EIA Consultation Letter - R95S73SVD000Consultation Requests26 Nov 2022View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Consultation expiry date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

Not Available
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.