  1. DeterminedLA06/2022/0045/DC

    Discharge of conditions 2 and 3 of LA06/2017/0778/RM Land immediately adjacent to and south east of Copelands Link Roundabout at the Comber Bypass.

    Land immediately adjacent to and south east of Copelands Link Roundabout at the Comber Bypass.

    Department for Infrastructure · Received 2 Dec 2021
  2. DeterminedLA03/2020/0881/RM

    Reserved matters application for major urban extension to include residential (699 no. units amounting to 8no. apartments, 92no. terrace, 440no. semi-detached and 159no. detached), northern section of Ballyclare Relief Road, public open spaces and associated development following outline permission granted under U/2009/0405/O

    Lands adjacent to the North-West of Ballyclare extending from Rashee Road close to its junction with Cogry Road continuing across to the North of Ross Avenue/Clare Heights and North and West of Ballyclare Rugby Club to the North of Doagh Road

    Department for Infrastructure · Received 16 Dec 2020
  3. DeterminedLA03/2018/0601/O

    Application to vary condition 3 (Phasing Plan), condition 10 (occupation of dwellings), condition 19 (Travel Card), condition 21 (cycle infrastructure), condition 31 (Environmental Management Plan), condition 42 (landscaping details), condition 44 (Landscape Masterplan), and non-compliance with condition 4 (Phasing Plan), condition 9 (access arrangements), condition 11 (road drainage), condition 16 (TAS approval), condition 17 (geotechnical approval) and condition 18 (road safety audit) of planning permission U/2006/0377/O for major urban extension to include: residential neighbourhood, southern section of Ballyclare Relief Road, local centre, riverside park and other open spaces, children's play areas and associated works.

    Lands extending from north of Doagh Road (opposite No.0141 Doagh Road) to the Templepatrick Road Ballyclare Immediately West of the cemetery Huntingdale and Dennisons Industrial Estate.

    Department for Infrastructure · Received 22 Jun 2018
  4. DeterminedLA08/2018/0155/DC

    Discharge of Condition No. 27 (Construction Method Statement) of Planning Permission LA08/2016/1328/F - Gas to the West (IP Crossing of the Seskinore River, Corkhill Road)

    High Pressure (HP) gas transmission pipeline (approx. 78km in length) between the proposed Above Ground Installation (AGI) opp. 64 Derryhale Rd Derryhale Portadown and 300m NW 371 Belfast Rd Tullykenneye Fivemiletown. Intermediate Pressure (IP) gas pipelines approximately 107 km in length from HP line to serve Cookstown Magherafelt Coalisland and Omagh Enniskillen and Derrylin. AGI sites: (i) opp. 64 Derryhale Rd Derryhale; (ii) 150m N of 39 Moss Rd Derrycoose; (iii) 50m W of 27 Old Moy Road Donnydeade; (iv) opp 10 Culnagrew Rd Culnagrew (v) 150m S of 59 Dergenagh Road Dergenagh (vi) 200m N of 23 Ballymagowan Road Tullybroom; (vii) 300m NW 371 Belfast Rd Tullykenneye.

    Department for Infrastructure · Received 1 Feb 2018
  5. ValidLA07/2017/1436/DC

    Discharge of Condition No.12 of Planning Approval R/2013/0544/RM

    Lands to the north of Saul Road and adjacent to Ardenlee Gardens Downpatrick

    Department for Infrastructure · Received 16 Aug 2017
  6. WithdrawnLA01/2017/0251/F

    Proposed works involve an additional three storey extension to the existing flat roof in order to accommodate 6 no. additional guest rooms per floor (Amended and additional drawings received)

    Adelphi Hotel 67-71 Main Street Portrush Co Antrim BT56

    Department for Infrastructure · Received 10 Feb 2017
  7. DeterminedSPD/2023/0974/DC

    Discharge of Condition 13 (Construction Environmental Management Plan in respect of the 400kV overhead line and associated 102 towers only) of Planning Permission Ref: O/2009/0792/F for the Erection of a single circuit 400kV overhead line (North South Interconnector).

    Land to the rear of 152 Trewmount Road in the townland of Turleenan, Moy, Dungannon, Co Tyrone and overhead electrical transmission line from Trewmount Road, Moy to the townlands of Crossreagh and Crossbane, Co Armagh.

    Department for Infrastructure · Received 17 Jul 2023
  8. DeterminedSPD/2024/0045/DC

    Partial Discharge of Condition 7 (Construction Environmental Management Plan) of planning permission Ref: LA04/2016/0421/F for the Construction of a new multi-purpose facility at D3 for berthing of cruise ships, and for lay-by and transient storage of project cargo, breakbulk and dry bulk during cruise ship off season, in respect of works comprising site establishment, demolition works, removal of the existing rock revetment, and reclamation works/platform construction (including band drain installation).

    Land at D3 adjacent to the RSPB Reserve Airport Road West Belfast BT3 9DY

    Department for Infrastructure · Received 8 May 2024
  9. DeterminedLA11/2019/0264/DC

    Discharge of Condition s for J/2007/0667/F. Condition 2 - Programme of Archaeological Works, Condition 24 - Remediation of TV Interference, Condition 25 - Shadow Flicker Remediation

    Golandun Dolan Killeter Castlederg

    Department for Infrastructure · Received 29 Mar 2019
  10. Consultation OpenLA11/2021/1211/TBA

    Proposed Riverine Pedestrian and Cycle Bridge at Station Road, Lifford, County Donegal - 11m in length between Lifford Co. Donegal and Strabane, County Tyrone.

    Between Station Road Lifford County Donegal and Strabane County Tyrone.

    Department for Infrastructure · Received 22 Nov 2021
  11. DeterminedSPD/2024/0072/DC

    Partial Discharge of Condition 15 (Construction Vibration Monitoring Methodology) of Planning Permission Ref: O/2009/0792/F for the Erection of a single circuit 400kV overhead line (North South Interconnector)

    Land to the rear of 152 Trewmount Road in the townland of Turleenan, Moy, Dungannon, Co Tyrone and overhead electrical transmission line from Trewmount Road, Moy to the townlands of Crossreagh and Crossbane, Co Armagh.

    Department for Infrastructure · Received 26 Sept 2024
  12. DeterminedSPD/2024/0077/DC

    Partial Discharge of Condition 17 (Construction Noise and Vibration Management Plan) for Phases 4-6 of Planning permission LA04/2017/1388/F for the Belfast Transport Hub.

    To The East Of The Westlink (A12); South Of (Nos.127-9) And Including Grosvenor Road; At Intersection Of Grosvenor Road And Stanley Street; At The Intersection Of Durham Street And Grosvenor Road; At The Intersection Of Fisherwick Place And Howard Street; At Great Victoria Street (between Nos. 1-3 To 27-45); At Glengall Street (between Nos. 3-21); At The Junction Of Hope Street, Bruce Street And Great Victoria Street; At The Junction Of Durham Street, Linfield Road, Sandy Row And Hope Street; At Sandy Row From 2 Hurst Park To 85-87 Sandy Row, Gilpins Site; To North Of Former Whitehall Tobacco Works At Linfield Road, Weavers Court Business Park/ Linfield Industrial Estate, Blythefield Primary School And Charter Youth Club; At Weavers Court Business Park And Railway Track Lands Surrounding Arellian Nursery And Bounded By Utility Street/Bentham Drive/Egmot Gardens/ Felt Street (to North); Prince Andrew Park And Abingdon Drive (to South); Beit Street, Roosevelt Rise,Roosevelt Square

    Department for Infrastructure · Received 2 Oct 2024
  13. DeterminedLA04/2017/1869/DC

    Discharge of Conditions 17 and 26 for Phase 1 of Planning Permission LA04/2016/2327/F - Royal Exchange, Belfast.

    Lands bounded by Nos. 31-101 Royal Avenue Church Street William Street Writers Square Nos. 40 to 16 Donegall Street No. 2 Waring Street 1-21 Bridge Street Nos. 2-18 High Street Nos. 1-27 Lombard Street Nos. 33 to 55 Rosemary Street North Street and Nos. 2-14 Lower Garfield Street Belfast

    Department for Infrastructure · Received 14 Aug 2017
  14. Consultation OpenLA11/2018/0166/TBA

    Extension to consented Derrykillew Wind Farm consisting of up to 8 no. wind turbines with a tip height of up to 150 metres, access roads, 1 no. onsite electrical substation, borrow pit, underground electrical and communications cabling connecting the turbines to the proposed onsite substation, 1 no. temporary construction compound and a permanent anemometry mast. It is proposed that existing forestry tracks through the site will be upgraded and used for the construction and operation of the proposed development. New access routes may also be required; the siting of which will have regard to the constraints identified onsite. All windfarm cabling will be laid underground.

    Approximately 4km northeast of Ballyshannon in the townlands of Behy and Cashelard Co Donegal

    Department for Infrastructure · Received 23 Feb 2018
  15. DeterminedLA11/2022/0360/DC

    Discharge of Condition 2 of J/2007/0667/F (Archaeological Evaluation Report)

    Gronan Windfarm Killeter Co. Tyrone.

    Department for Infrastructure · Received 23 Mar 2022
  16. DeterminedSPD/2024/0025/DC

    Discharge of Condition 2 (Details of Ecological Clerk of Works, roles and responsibilities) of planning permission Ref: LA04/2016/0421/F for the Construction of a new multi-purpose facility at D3 for the berthing of cruise ships, and for lay-by and transient storage of project cargo, breakbulk and dry bulk during cruise ship off season

    Land at D3 adjacent to the RSPB Reserve, Airport Road West, Belfast, BT3 9DY

    Department for Infrastructure · Received 9 Feb 2024
  17. DeterminedLA04/2017/1103/DC

    Discharge of Condition 16 of Z/2010/1006/O which states - The development hereby permitted shall not commence until a piling risk assessment has been completed and submitted in writing to the Department for its agreement. This assessment should take account of the site data generated from the above conditions and should refer to the guidance provided in the Environment Agency (2001) document, "Piling and Penetrative Ground Improvement Methods on Land Affected by Contamination: Guidance on Pollution Prevention", reference NC/99/73.

    Lands bounded by the River Lagan to the east Corporation Street to the west Dock Street and Corry Link to the north and the elevated M3 Cross Harbour Bridge/Motorway to the south City Quays Clarendon Dock Belfast BT1 3AL

    Department for Infrastructure · Received 16 May 2017
  18. DeterminedLA04/2020/0334/DC

    Discharge of Condition 23 (Construction Environmental Management Plan) on Planning Permission Ref: LA04/2017/1388/F for the Belfast Transport Hub

    Lands: To The East Of The Westlink (A12)

    Department for Infrastructure · Received 31 Jan 2020
  19. DeterminedLA08/2018/0146/DC

    Discharge of Condition 21 (Habitat Management Plan) of Planning Permission LA08/2016/1328/F - Gas to the West (Traditional Orchard locations)

    High Pressure (HP) gas transmission pipeline (approx. 78km in length) between the proposed Above Ground Installation (AGI) opp. 64 Derryhale Rd Derryhale Portadown and 300m NW 371 Belfast Rd Tullykenneye Fivemiletown. Intermediate Pressure (IP) gas pipelines approximately 107 km in length from HP line to serve Cookstown Magherafelt Coalisland and Omagh Enniskillen and Derrylin. AGI sites: (i) opp. 64 Derryhale Rd Derryhale; (ii) 150m N of 39 Moss Rd Derrycoose; (iii) 50m W of 27 Old Moy Road Donnydeade; (iv) opp 10 Culnagrew Rd Culnagrew (v) 150m S of 59 Dergenagh Road Dergenagh (vi) 200m N of 23 Ballymagowan Road Tullybroom; (vii) 300m NW 371 Belfast Rd Tullykenneye.

    Department for Infrastructure · Received 30 Jan 2018
  20. DeterminedLA06/2019/1265/RM

    Play area and attenuation basin.

    Lands south of the Copelands Link roundabout at the Comber Bypass

    Department for Infrastructure · Received 18 Dec 2019