Council planning record

The Repower of the existing Altahullion Phase I & II wind farm (s) comprising the following main components; (i) Decommissioning of the existing 29 No. turbines (ii) Removal and restoration of the existing substation building and compound (iii) Removal and restoration of the other redundant infrastructure (iv) erection of 8 No. wind turbines with an output of approximately 48MW (v) Construction of new of access tracks; (vi) Upgrade of existing access tracks; (vii) Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and external transformers and/or switchgears; (viii) temporary construction compound/laydown area; (ix) Turning heads and passing places incorporated within the site access infrastructure; (x) control building and substation compound; (xi) During construction and commissioning there would be a number of temporary works including a construction compound with car parking; temporary parts of crane hardstandings; welfare facilities.

Existing Altahullion I & II Wind Farm (s), located in the townlands of Drum & Glenconway, Limavady, Co Derry/Londonderry which is located 3km north of Foreglen in Derry/Londonderry.

DeterminedReference: SPD/2026/0010/PANDepartment for Infrastructure

Application location

Existing Altahullion I & II Wind Farm (s), located in the townlands of Drum & Glenconway, Limavady, Co Derry/Londonderry which is located 3km north of Foreglen in Derry/Londonderry.

This record has no verified map location.

Application summary

Status
Determined
Application type
Proposal of Application Notice
Received
28 May 2026
Validated
28 May 2026
Determination deadline
Not published
Local authority
Department for Infrastructure

Application overview

The Repower of the existing Altahullion Phase I & II wind farm (s) comprising the following main components; (i) Decommissioning of the existing 29 No. turbines (ii) Removal and restoration of the existing substation building and compound (iii) Removal and restoration of the other redundant infrastructure (iv) erection of 8 No. wind turbines with an output of approximately 48MW (v) Construction of new of access tracks; (vi) Upgrade of existing access tracks; (vii) Construction of temporary and permanent hardstanding areas for each turbine to accommodate turbine component laydown areas, crane hardstanding areas and external transformers and/or switchgears; (viii) temporary construction compound/laydown area; (ix) Turning heads and passing places incorporated within the site access infrastructure; (x) control building and substation compound; (xi) During construction and commissioning there would be a number of temporary works including a construction compound with car parking; temporary parts of crane hardstandings; welfare facilities.

Proposal details

Reference
SPD/2026/0010/PAN
Alternative references
PP-14955012
Ward
Altahullion
Agent
Renewable Energy Systems Ltd

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 4 of 4

DocumentPublishedAction
PAN Application FormApplication Form20 Jul 2026View
PAN ResponseCorrespondence with Applicant/Agent/Solicitor20 Jul 2026View
DfI Letter To CouncilCorrespondence with council20 Jul 2026View
Site Location Map A3Site Location Plan20 Jul 2026View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Received date

    Published milestoneCouncil source
  2. Validated date

    Published milestoneCouncil source
  3. Decision date

    Published milestoneCouncil source

Decision & conditions

Acceptable
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Related records could not be loaded.

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.