Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,069 approved · 124 refused · 271 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Lerwick Distillery 32 Market Street Lerwick Shetland ZE1 0JP
Received 7 Dec 2023Tananger Gott Tingwall Shetland ZE2 9SE
Received 12 Dec 2023Plot2 Greenfield Road Cullister Sandwick Shetland
Received 12 Dec 2023Block 2 Montfield Lane Lerwick Shetland ZE1 0LF
Received 13 Dec 2023Hallstatt Muness Unst Shetland ZE2 9DL
Received 13 Dec 2023Plot Lower Voe Voe Shetland
Received 15 Dec 2023Pier Road Walls Shetland ZE2 9PG
Received 15 Dec 2023Plot Bordal Sandwick Shetland
Received 18 Dec 2023Pukanui Cottage Upper Setter Gulberwick Shetland ZE2 9JX
Received 18 Dec 2023RS Henderson Warehouse Cullivoe Pier YELL Shetland Isles
Received 19 Dec 2023Indianara Laxfirth Tingwall Shetland ZE2 9SG
Received 20 Dec 2023Easterdale Industrial Estate Burra Shetland ZE2 9LB
Received 21 Dec 2023North Voe Whalsay Shetland
Received 19 Dec 2023Former G B Building Centre Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Received 22 Dec 2023Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 22 Dec 2023Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 22 Dec 2023Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 22 Dec 2023Boatsroom Voe, Lunna, Shetland
Received 19 Dec 2023East Of Cole Ness, Gonfirth, Shetland
Received 19 Dec 2023Snarraness Voe, West Burrafirth, Shetland
Received 19 Dec 2023Mangaster Voe, Northmavine, Shetland
Received 19 Dec 2023Hamar Sound, Hamar Voe, Shetland
Received 19 Dec 2023Walls Show Field Walls Shetland ZE2 9PF
Received 8 Jan 20242 Camp Brae Shetland ZE2 9BJ
Received 10 Jan 2024Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage