Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,069 approved · 124 refused · 274 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Mosshouse Effirth Bixter Shetland ZE2 9NG
Received 10 Jan 20246 Kirkpark Scalloway Shetland ZE1 0XJ
Received 11 Jan 2024Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.
Received 8 Dec 202512 South Lochside Lerwick Shetland ZE1 0RA
Received 23 Jan 2024Arquiva Site Fetlar
Received 11 Jan 2024Shetland MOT & Repair Garage Gott Tingwall Shetland ZE2 9SH
Received 11 Jan 2024North Voe Whalsay Shetland
Received 15 Jan 2024Shetland Rural Centre, Staneyhill Lerwick
Received 16 Jan 2024The Steamer Skeld Shetland
Received 18 Jan 20247 Bank Lane Lerwick Shetland ZE1 0DT
Received 19 Jan 2024Hololoan Gunnista Bressay Shetland ZE2 9EL
Received 23 Jan 2024Duke Street Hamnavoe Burra Shetland Isles
Received 25 Jan 2024Midfield South Whiteness Whiteness Shetland ZE2 9LL
Received 25 Jan 2024Gilbert Bain Hospital South Road Lerwick Shetland ZE1 0TB
Received 25 Jan 2024Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 29 Jan 20246B Wethersta Industrial Estate Wethersta Brae Shetland ZE2 9QL
Received 30 Jan 2024Q A FISH LTD Blacksness Scalloway Shetland ZE1 0TQ
Received 30 Jan 2024Shetland Rural Centre Staneyhill Lerwick
Received 30 Jan 2024Harbison Park Gardentown Symbister Whalsay Shetland ZE2 9AB
Received 31 Jan 2024Fish Holm Fish Farm, Yell Sound, Shetland
Received 1 Feb 2024Plot Gunnista Bressay Shetland
Received 1 Feb 2024Laxfirth Voe, Tingwall, Shetland
Received 1 Feb 2024Congregational Church Skeld Shetland ZE2 9NJ
Received 2 Feb 2024Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage