Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,069 approved · 125 refused · 275 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Congregational Church Skeld Shetland ZE2 9NJ
Received 5 Feb 202417 Burgh Road Lerwick Shetland ZE1 0LA
Received 5 Feb 2024Holms Geo, Clift Sound, Shetland
Received 5 Feb 2024North Haven Care Centre Brae Shetland ZE2 9TY
Received 6 Feb 2024Beaw Field Wind Farm Burravoe, Yell ZE2 9BA
Received 7 Feb 202481 Commercial Street Lerwick Shetland ZE1 0AD
Received 7 Feb 202481 Commercial Street Lerwick Shetland ZE1 0AD
Received 7 Feb 2024Springwal Muckle Roe Shetland ZE2 9QW
Received 7 Feb 2024Land At Northdale, Haroldswick, Unst
Received 8 Feb 2024Sorbyen Ayres Aith Shetland ZE2 9ND
Received 12 Feb 2024Field located to North east of Norbrek, Voe
Received 12 Feb 2024Adjacent Aith Junior High School Aith Shetland ZE2 9NB
Received 12 Feb 2024West Of Olligarth Bridge, Stromness Voe, Shetland
Received 8 Feb 2024Off The A970 Northing: 1142616 Easting: 442965
Received 13 Feb 2024Off The A970 Northing: 1142819 Easting: 443034
Received 14 Feb 2024Ground Floor Flat Leagarth 3 Clairmont Place Lerwick Shetland ZE1 0BR
Received 14 Feb 2024Park Hall Bixter ZE2 9LY
Received 15 Feb 2024Near Isleshaven Care Centre Mid Yell Yell Shetland ZE2 9BT
Received 16 Feb 2024Gott Farm Tingwall
Received 19 Feb 2024Gilbert Bain Hospital South Road Lerwick Shetland ZE1 0TB
Received 19 Feb 2024North Haven Fair Isle Shetland ZE2 9JU
Received 19 Feb 2024Norvag Symbister Whalsay Shetland ZE2 9AF
Received 20 Feb 202437 Kalliness Weisdale Shetland ZE2 9LR
Received 21 Feb 2024Mucklegrind Foula
Received 22 Feb 2024Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage