Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,380Searchable applications
136Recorded as pending
98%Approval rate · 8,197 approved or refused records
125Refused applications

8,072 approved · 125 refused · 275 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2024/050/PPF

    New dwelling house with timber decking and ASHP

    Plot Newpark Brough Whalsay ZE2 9AL

    Received 22 Feb 2024
  2. Decided2024/051/PPF

    Change of use of land from agricultural to glamping site. Proposal seeks to erect 3no. glamping pods, with associated services + drainage, parking provision and site access.

    Site At North Ustaness South Whiteness Shetland ZE2 9LL

    Received 23 Feb 2024
  3. Decided2024/052/ADV

    Installation of 2 x individual Lectern style Information panels

    Map Ref E: 453019 N: 1186643 Aywick Mid Yell Shetland

    Received 23 Feb 2024
  4. Decided2024/053/PPF

    Demolish existing porch, erect new single storey porch

    Roesound Muckle Roe Shetland ZE2 9QW

    Received 26 Feb 2024
  5. Decided2024/054/LBC

    After a period of high winds the part of the North (rear) elevation vestry walls have collapsed. For safety reasons the north-east corner of the wall comprising the approximate 2 metre length of the remaining north wall and part of the east wall (6m approx.) is to be demolished. The sections of the vestry elevations to be demolished is highlighted on drawing number 005 - Proposed.

    Voe Old Cemetery Voe Shetland

    Received 26 Feb 2024
  6. Decided2024/055/PPF

    Extension to existing house and create parking and turning area from existing access

    Braefield Cottage Stove Sandwick Shetland ZE2 9HH

    Received 26 Feb 2024
  7. Unknown2024/005/MPN

    Application for prior notification under classes 21A, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 12 x 90m-circumference cages with 10 x 100m-circumference cages, to change top net system to pole-supported top nets and to change moorings

    Cole Deep, Swarbacks Minn, Shetland

    Received 27 Feb 2024
  8. Decided2021/005/DCON5

    Application for consent, agreement or approval required by planning Condition 22 (Visitor and Spectator Management Plan) of Planning Application Ref 2021/005/PPF

    Land At Lamba Ness, Unst, Shetland

    Received 27 Feb 2024
  9. Decided2024/056/PPF

    Proposed new dwellinghouse with new access road, with the inclusion of a change of use from agricultural land into private garden (new domestic curtilage) within the site

    Plot Hillhead Isbister Whalsay Shetland

    Received 28 Feb 2024
  10. Decided2024/057/PPF

    Installation of external metal handrails and grab rails at front and rear entrance doors for disabled occupant

    38 St Olaf Street Lerwick Shetland ZE1 0DA

    Received 29 Feb 2024
  11. Decided2024/058/PPF

    Install bilateral external metal handrails at 2 sets of steps

    26 King Harald Street Lerwick Shetland ZE1 0DJ

    Received 29 Feb 2024
  12. Decided2024/059/PPF

    Install timber ramped access with concrete plat to side entrance door of property.

    South Califf Gott Tingwall Shetland ZE2 9SF

    Received 29 Feb 2024
  13. Decided2024/060/PPF

    New 4 bedroom house with air source heat pump

    Banks Vidlin Shetland ZE2 9QB

    Received 29 Feb 2024
  14. Decided2014/175/DCON

    Application for consent, agreement or approval required by planning condition 3 (Time Limit)

    Scatsta Airport Scatsta Brae Shetland ZE2 9QP

    Received 1 Mar 2024
  15. Decided2024/063/PPF

    Construction of timber access ramp with concrete plat to rear entrance door of property

    Hardanger Gonfirth Voe Shetland ZE2 9PX

    Received 5 Mar 2024
  16. Decided2023/194/DCON1

    Application for consent, agreement or approval required by planning condition 12 (Otter Survey) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 6 Mar 2024
  17. Decided2024/065/PPF

    Change of use of land from agricultural to glamping site. Proposal seeks to erect 3no. glamping pods + static caravan with associated services + drainage and site parking

    South Gluss Gluss Ollaberry Shetland ZE2 9RU

    Received 7 Mar 2024
  18. Decided2024/066/PPF

    Demolition of existing outbuildings, erection of 1.5 storey extension, erection of polycrub and associated works to parking and drainage upgrades.

    South Gluss Gluss Ollaberry Shetland ZE2 9RU

    Received 7 Mar 2024
  19. Decided2020/111/DCON1

    Application for consent, agreement or approval required by planning conditions 5 (Window Spec) and condition 6 (Rooflight spec)

    Leog House 2 Leog Lane Lerwick Shetland ZE1 0AH

    Received 7 Mar 2024
  20. Decided2020/135/DCON1

    Application for consent, agreement or approval required by planning conditions 2 (Window Spec) and condition 3 (Rooflight spec)

    Leog House 2 Leog Lane Lerwick Shetland ZE1 0AH

    Received 7 Mar 2024
  21. Decided2023/194/DCON2

    Application for consent, agreement or approval required by planning condition 14 (Written Scheme of Investigation) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 8 Mar 2024
  22. Unknown2024/067/PN

    Prior Notification for Farm-related Building Works (Non-residential).

    Uradale Farm East Voe Scalloway Shetland ZE1 0US

    Received 11 Mar 2024
  23. Decided2023/232/DCON1

    Application for consent, agreement or approval required by planning condition 10 (Biodiversity)

    Mail Ayre South Voxter Cunningsburgh Shetland ZE2 9HF

    Received 7 Mar 2024
  24. Decided2023/011/MDCON

    To discharge condition no. 3 of Planning Permission 2023/011/MAR

    Slyde/ East Burrafirth, Aith Voe

    Received 11 Mar 2024

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage