Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,380Searchable applications
136Recorded as pending
98%Approval rate · 8,197 approved or refused records
125Refused applications

8,072 approved · 125 refused · 275 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2024/068/PN

    Prior Notification for Farm-related Building Works (Non-residential) - General Purpose Agricultural Shed 18 x 12

    Haa Croft, Gossabrough, East Yell, Shetland, ZE2 9AU

    Received 11 Mar 2024
  2. Decided2024/069/PPF

    Proposed housing development comprising three private dwellings, social housing comprising six 2-bedroom units and six 1-bedroom units and associated infrastructure

    The Moorfield Hotel Site Brae Shetland ZE2 9UX

    Received 13 Mar 2024
  3. Decided2024/070/PPF

    Construction of three houses with air source heat pumps and road access.

    Plots Wormadale Whiteness Shetland

    Received 14 Mar 2024
  4. Decided2023/194/DCON3

    Application for consent, agreement or approval required by planning condition 11 (Access Route Provisions) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 14 Mar 2024
  5. Decided2024/071/PPF

    New dwelling house with ASHP

    Plot Westhouse Skaw Whalsay Shetland

    Received 18 Mar 2024
  6. Unknown2024/005/PAM

    Application for prior approval under classes 21A, 21C and 21G of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): To modify an existing fish farm by replacing 12 x 90m-circumference cages with 10 x 100m-circumference cages, to install pole-supported top nets and to change moorings

    Cole Deep, Swarbacks Minn, Shetland

    Received 18 Mar 2024
  7. Decided2024/072/PPF

    To upgrade an existing agricultural access track

    Clavil Rerwick Bigton Shetland ZE2 9JF

    Received 19 Mar 2024
  8. Decided2024/073/PPF

    Erect sunroom extension to the south elevation of the existing dwellinghouse.

    North Scarvister Scarvister Wester Skeld Shetland ZE2 9NL

    Received 19 Mar 2024
  9. Decided2023/295/DCON1

    Application for consent, agreement or approval required by planning condition 4 (Otter Survey)

    Store Pier Road Walls Shetland ZE2 9PG

    Received 19 Mar 2024
  10. Decided2023/295/DCON2

    Application for consent, agreement or approval required by planning condition 5 (Biodiversity)

    Store Pier Road Walls Shetland ZE2 9PG

    Received 19 Mar 2024
  11. Decided2022/149/DCON3

    Application for consent, agreement or approval required by planning Condition 1 (Pipeline Route), of application ref 2022/149/PPF

    Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY

    Received 20 Mar 2024
  12. Decided2023/194/DCON4

    Application for consent, agreement or approval required by planning condition 5 (Reinstatement Plan and Sections) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 21 Mar 2024
  13. Decided2024/075/PPF

    Demolish existing extension, porch and section of boundary wall and construct replacement porch and extension to side and rear. Replace existing roof slates with natural slate and construct an area of decking to the rear of the proposed extension.

    37 Burgh Road Lerwick Shetland ZE1 0LA

    Received 22 Mar 2024
  14. Decided2024/076/PPF

    Siting of a mobile home for residential purposes including creation of base slab, utilities and drainage

    Grindins Wester Skeld Shetland ZE2 9NL

    Received 25 Mar 2024
  15. Decided2023/194/DCON5

    Application for consent, agreement or approval required by planning condition 6 (Overburden Stockpile Management Plan) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 25 Mar 2024
  16. Decided2024/077/PPF

    Retrospective application for the extraction of material from Staney Hill Quarry outside approved 2013/222/PPF boundary, plus subsequent reinstatement of the same area.

    Staney Hill Quarry Ladies Drive Lerwick Shetland ZE1 0QW

    Received 25 Mar 2024
  17. Decided2023/194/DCON6

    Application for consent, agreement or approval required by planning condition 8 (Vehicle Talc Dust Mitigation) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 26 Mar 2024
  18. Decided2023/194/DCON7

    Application for consent, agreement or approval required by planning condition 10 (Settlement Ponds) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 26 Mar 2024
  19. Decided2024/078/PPF

    Replacement water treatment works

    Land to the south of the existing Eela Water Treatment Works, Shetland

    Received 26 Mar 2024
  20. Decided2024/080/PPF

    Erect new storage shed facility with associated office. Install air-air heat pump to heat offices.

    Workshop Wethersta Brae Shetland ZE2 9QL

    Received 27 Mar 2024
  21. Decided2023/194/DCON8

    Application for consent, agreement or approval required by planning condition 7 (Financial Bond) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 20 Mar 2024
  22. Decided2023/194/DCON9

    Application for consent, agreement or approval required by planning condition 9 (Roads Agreement) of Planning Application 2023/194/MIN

    Cross Geo Haroldswick Unst Shetland ZE2 9EF

    Received 21 Mar 2024
  23. Decided2024/081/LBC

    This proposal is to refurbish a listed building including roof finishes, windows, doors and conservatory. There will also be internal refurbishment and insulation upgrade. Upgrade to the heating system will include an ASHP located externally.

    Bonhoga Gallery Brig Weisdale Shetland ZE2 9LW

    Received 27 Mar 2024
  24. Decided2024/082/PPF

    Installation of replacement accessible toilet with septic tank and extension to existing hardstanding area

    Grutness Pier Virkie Shetland ZE3 9JN

    Received 28 Mar 2024

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage