Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,047 approved · 122 refused · 268 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Cross Geo Haroldswick Unst Shetland ZE2 9EF
Received 7 Mar 2023Land By Lower Blackhill Industrial Estate, Gremista, Lerwick ZE1 0PX
Received 7 Mar 2023Land By Lower Blackhill Industrial Estate, Gremista, Lerwick ZE1 0PX
Received 7 Mar 2023Land By Lower Blackhill Industrial Estate, Gremista, Lerwick ZE1 0PX
Received 7 Mar 2023Land By Lower Blackhill Industrial Estate, Gremista, Lerwick ZE1 0PX
Received 7 Mar 2023135-143 Sandveien Lerwick Shetland ZE1 0RX
Received 10 Mar 2023135-143 Sandveien Lerwick Shetland ZE1 0RX
Received 10 Mar 2023Plot - Glamping Pods Scousburgh Dunrossness Shetland
Received 10 Mar 2023Foula Landing Strip Foula Shetland ZE2 9PN
Received 13 Mar 202329 Bruce Crescent Lerwick Shetland ZE1 0PB
Received 15 Mar 20239 Ockragarth Brae Shetland ZE2 9SW
Received 15 Mar 2023Heatherlea Hillside Road Scalloway Shetland ZE1 0XB
Received 16 Mar 2023Plot Newpark Brough Whalsay Shetland
Received 17 Mar 2023Mousewall Gott Tingwall Shetland ZE2 9SF
Received 17 Mar 2023Glenburn Maywick Bigton Shetland ZE2 9JF
Received 20 Mar 2023Plots Gary Couper Road Moorfield Brae Shetland
Received 22 Mar 202352 Kalliness Weisdale Shetland ZE2 9LR
Received 22 Mar 2023Grutness Pier Virkie Shetland ZE3 9JN
Received 22 Mar 2023The Grid Reference Is The Approximate Centre Of The Site For Mossy Hill Wind Farm. The Centre Of The Site Is Located Approximately 2.4km From Outskirts Of Lerwick And Approximately 4.2km From Lerwick Harbour.
Received 22 Mar 2023Henderson Longfield Dunrossness Shetland ZE2 9JH
Received 24 Mar 2023Makira Gulberwick Shetland ZE2 9JX
Received 27 Mar 2023Site Compound Ladies Drive Lerwick Shetland
Received 28 Mar 2023Adjacent Symbister Ferry Terminal Symbister Whalsay Shetland ZE2 9AL
Received 23 Mar 2023Springburn Gott Tingwall Shetland ZE2 9SF
Received 28 Mar 2023Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage