Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,740Searchable applications
125Recorded as pending
98%Approval rate · 7,143 approved or refused records
113Refused applications

7,030 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2013/300/PPF

    To demolish existing redundant building and erect 3 no. dwellinghouses and upgrade access road

    Lower Site Wormadale Whiteness Shetland ZE2 9LJ

    Received 28 Aug 2013
  2. Decided2013/301/PPF

    Install access ramp

    Midgard Cott Weisdale Shetland ZE2 9LN

    Received 28 Aug 2013
  3. Decided2013/302/ADV

    Erect window signs (Retrospective Application)

    28 North Road Lerwick Shetland ZE1 0NT

    Received 29 Aug 2013
  4. Decided2013/303/PPF

    Erect dwellinghouse and integral garage

    Scord East Voe Scalloway Shetland ZE1 0UR

    Received 29 Aug 2013
  5. Decided2013/304/PPP

    Erect single dwellinghouse and create new access road (Planning Permission in Principle)

    Catfirth South Nesting Shetland ZE2 9PP

    Received 30 Aug 2013
  6. Decided2013/305/SCR

    Request for Screening Opinion

    Sumburgh Airport Scatness Virkie Shetland ZE3 9JP

    Received 30 Aug 2013
  7. Decided2013/307/PPF

    Replace existing corrugated asbestos roof with corrugated aluminium of the same profile

    Old Haa Burravoe Yell Shetland ZE2 9AY

    Received 2 Sept 2013
  8. Decided2013/308/LBC

    Replace existing corrugated asbestos roof with corrugated aluminium of the same profile

    Old Haa Burravoe Yell Shetland ZE2 9AY

    Received 2 Sept 2013
  9. Decided2013/309/PPF

    Extend existing car parking area

    Bixter Surgery Bixter Shetland ZE2 9NA

    Received 3 Sept 2013
  10. Decided2013/310/PPF

    Erect workshop/boatshed and erect flagpole

    Springbank Hoswick Sandwick Shetland ZE2 9HL

    Received 4 Sept 2013
  11. Decided2013/311/PPF

    Erect dwellinghouse

    Adjacent To 19 Ackrigarth Lerwick Shetland ZE1 0RQ

    Received 4 Sept 2013
  12. Decided2013/312/PPF

    Erect dwellinghouse and construct new access

    Adjacent To Uphouse Ayres Aith Shetland ZE2 9ND

    Received 4 Sept 2013
  13. Decided2013/313/PPF

    Erect dwellinghouse and improve existing access

    Freester Skellister South Nesting Shetland ZE2 9PP

    Received 4 Sept 2013
  14. Decided2013/314/PPF

    Erect 1 3/4 dwellinghouse and garage, install septic tank, infiltration system and SUDs soakaway and construct new access

    Cumliewick Road Sandwick Shetland ZE2 9HH

    Received 5 Sept 2013
  15. Decided2013/315/PPF

    Erect shed and install sewage treatment system

    Baillister Tingwall Shetland ZE2 9SB

    Received 6 Sept 2013
  16. Decided2013/316/PPP

    Erect 1 and a half storey dwellinghouse and integral garage (Planning Permission in Principle)

    Lower Aithsetter Cunningsburgh Shetland ZE2 9HG

    Received 9 Sept 2013
  17. Decided2013/317/PPF

    To site temporary accommodation (retrospecitve application)

    Adjacent To Seafarers Mission Garths Voe Mossbank Shetland ZE2 9QR

    Received 9 Sept 2013
  18. Decided2013/318/PPF

    To site two portable changing rooms

    Harbison Park Symbister Whalsay Shetland ZE2 9AQ

    Received 9 Sept 2013
  19. Unknown2013/319/SCO

    Installation of Gas Sweetening plant and ancillary infrastructure including associated flares, two seawater piplines (inlet and outlet) and caisson

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 9 Sept 2013
  20. Decided2013/321/PPP

    Erect dwellinghouse (Planning Permission in Principle)

    Eswick South Nesting Shetland ZE2 9PS

    Received 11 Sept 2013
  21. Unknown2013/322/VCON

    To vary condition 1 of planning permission 2009/268/PCD to erect temporary flue for woodburning stove on workshop (retrospective)

    Hillside Lodge Hillside Road Sandwick Shetland ZE2 9HW

    Received 12 Sept 2013
  22. Unknown2013/032/MAR

    To modify an existing salmon farm by relocating/reorientating site and by deploying an alternative feed barge (retrospective)

    Spoose Holm, Scalloway Islands

    Received 9 Sept 2013
  23. Decided2013/323/PPF

    Erect dwellinghouse and integral garage and detached shed

    Busta Brae Shetland ZE2 9QN

    Received 13 Sept 2013
  24. Decided2013/324/PPF

    Erect dwellinghouse

    Olivette Duke Street Hamnavoe Burra Shetland ZE2 9LA

    Received 16 Sept 2013

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage