Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,747Searchable applications
125Recorded as pending
98%Approval rate · 7,147 approved or refused records
113Refused applications

7,034 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Awaiting decision2013/325/PPF

    To site mobile retail van to sell hot food

    Sella Ness Mossbank Shetland ZE2 9QR

    Received 13 Sept 2013
  2. Decided2013/326/PPF

    Erect sun porch to west elevation

    3 Runafirth Brae Shetland ZE2 9ST

    Received 16 Sept 2013
  3. Decided2013/327/PPF

    Change of use from existing primary school to health centre; alterations to existing road access, parking and playground to accommodate parking

    Scalloway Junior High School New Road Scalloway Shetland ZE1 0TN

    Received 16 Sept 2013
  4. Decided2013/328/PPF

    To erect extension to West elevation

    Gartmore Sandwick Shetland ZE2 9HP

    Received 17 Sept 2013
  5. Decided2013/329/PPF

    Erect dwellinghouse and attached garage

    Plot 3 Sands Of Sound Lerwick Shetland ZE1 0SZ

    Received 17 Sept 2013
  6. Decided2013/330/ADV

    Erect sign cabinet

    Town Hall Hillhead Lerwick Shetland ZE1 0HB

    Received 17 Sept 2013
  7. Decided2013/331/PPF

    Erect dwellinghouse and attached garage

    Adjacent To Sandlea Sandwick Shetland ZE2 9HW

    Received 19 Sept 2013
  8. Pending Consideration2013/332/PPF

    Erect and install two 5kw wind turbines on 15m high towers on 3M square bases

    Rackwick Ollaberry Shetland ZE2 9RU

    Received 19 Sept 2013
  9. Decided2013/334/CAC

    Demolish former youth centre

    Westshore Boat Yard Main Street Scalloway Shetland ZE1 0XJ

    Received 20 Sept 2013
  10. Unknown2013/335/PAN

    Proposal of application notice; extension of existing quarry

    Scatsta Quarry Scatsta Brae Shetland ZE2 9QP

    Received 23 Sept 2013
  11. Decided2013/336/PPF

    Erect dwellinghouse

    Plot 2 Camp Brae Shetland ZE2 9QJ

    Received 24 Sept 2013
  12. Decided2013/337/AMSC

    To erect dwellinghouse

    Herra Vidlin Shetland ZE2 9QB

    Received 23 Sept 2013
  13. Decided2013/033/MAR

    To vary condition no. 2 of planning permission 2010/019/NS to extend the time period for commencement of development by two years

    Brandy Ayre Vaila Sound

    Received 19 Sept 2013
  14. Decided2013/034/MAR

    To vary condition no. 2 of planning permission 2010/045/NS to extend the time period for commencement of development by two years

    Gruna Vementry

    Received 19 Sept 2013
  15. Decided2013/035/FRA

    To install six 40m-circumference cages and a pontoon for the purpose of rearing salmon smolts (retrospective)

    Loch Of Snarravoe, Unst

    Received 20 Sept 2013
  16. Decided2013/036/FRA

    To install two 40m-circumference cages and a pontoon for the purpose of rearing salmon smolts for potential broodstock (retrospective)

    Loch Of Belmont, Unst

    Received 20 Sept 2013
  17. Decided2013/338/PPF

    To erect garage extension

    9 Roebrek Brae Shetland ZE2 9QY

    Received 25 Sept 2013
  18. Decided2013/339/ECUCON

    Section 36 Application for a Lerwick Power Station

    Rova Head Lerwick Shetland ZE1 0PU

    Received 13 Sept 2013
  19. Decided2013/037/MAR

    To vary conditions no.'s 1 and 2 of planning permission 2011/033/MAR relating to the approved plans and the approved site location co-ordinates of an existing finfish farm

    North Of Papa Scalloway Islands

    Received 25 Sept 2013
  20. Decided2013/340/PPP

    Erect dwellinghouse (Planning Permission in Principle)

    Sea Gaet Sandwick Shetland ZE2 9HP

    Received 26 Sept 2013
  21. Decided2013/341/PPF

    Erect 1 no. 6kw wind turbine on a 11.6m tower and excavate works to run electricity cable

    Muckle Burgh View Burrastow Crookataing Walls Shetland ZE2 9PD

    Received 27 Sept 2013
  22. Decided2013/342/PPF

    Erect dwellinghouse, integral garage and septic tank

    New House Unifirth West Burrafirth Shetland ZE2 9NT

    Received 27 Sept 2013
  23. Decided2013/343/PPF

    Install external access ramp

    38 Norstane Lerwick Shetland ZE1 0QG

    Received 27 Sept 2013
  24. Decided2013/344/APN

    Erect byre with underground slurry tank

    Grunnins Ollaberry Shetland ZE2 9RX

    Received 27 Sept 2013

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage