Council planning record

Section 36 Application for a Lerwick Power Station

Rova Head Lerwick Shetland ZE1 0PU

DecidedReference: 2013/339/ECUCONShetland Islands

Last published check: 3 Oct 2026, 13:23. Check the council record for more recent changes.

Application location

Rova Head Lerwick Shetland ZE1 0PU

This record has no verified map location.

View council map

Application summary

Status
Decided
Application type
Energy Consents Unit
Received
13 Sept 2013
Validated
13 Sept 2013
Determination deadline
12 Nov 2013
Local authority
Shetland Islands

Application overview

Section 36 Application for a Lerwick Power Station

Proposal details

Reference
2013/339/ECUCON

Sign in to view all collected council fields and recorded changes.

Sign in to view collected details

Documents 148 of 148

DocumentPublishedAction
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF14 Mar 2017View
CORRESPONDENCECorrespondence · PDF7 Mar 2017View
LETTER TO SIC ENC CERTIFIED COPY ASSIGNATIONCorrespondence · PDF7 Mar 2017View
ASSIGNATION OF S36 CONSENTCorrespondence · PDF7 Mar 2017View
SCHEDULE TO ASSIGNATIONCorrespondence · PDF7 Mar 2017View
CORRESPONDENCECorrespondence · PDF22 Feb 2017View
CORRESPONDENCEDischarge of Condition(s) · PDF17 Feb 2017View
CORRESPONDENCECorrespondence · PDF25 Jan 2017View
CORRESPONDENCECorrespondence · PDF25 Jan 2017View
DECISION LETTERDecision · PDF21 Aug 2014View
SUPERSEDED DECISION LETTER FROM SCOTTISH GOVERNMENTDecision · PDF20 Aug 2014View
PRESS RELEASEAdvert · PDF20 Aug 2014View
EMAIL TO SCOTTISH GOVERNEMENT RE: SHETLAND ISLANDS COUNCIL RESPONSECorrespondence · PDF26 Feb 2014View
LETTER TO SCOTTISH GOVERNEMENT RE: SHETLAND ISLANDS COUNCIL RESPONSECorrespondence · PDF26 Feb 2014View
PLANNING COMMITTEE REPORT: APPENDIX 1A SITE PLANReport · PDF26 Feb 2014View
PLANNING COMMITTEE REPORT: APPENDIX 2Report · PDF25 Feb 2014View
PLANNING COMMITTEE REPORT: APPENDIX 3Report · PDF25 Feb 2014View
PLANNING COMMITTEE REPORTReport · PDF25 Feb 2014View
PLANNING COMMITTEE REPORT: APPENDIX 1 LOCATION PLANReport · PDF25 Feb 2014View
HSE COMMENTSCorrespondence · PDF19 Feb 2014View
ROAD CROSS SECTIONDrawing · PDF23 Jan 2014View
APPENDIX A1 - AM PEAK BASEReport · PDF23 Jan 2014View
APPENDIX A2 - AM PEAK BASEReport · PDF23 Jan 2014View
APPENDIX A3 - AM PEAK REVISED TURNS - BASE + CONSTRUTIONReport · PDF23 Jan 2014View
APPENDIX A4 - PM PEAK REVISED TURNS - BASE + CONSTRUCTIONReport · PDF23 Jan 2014View
APPENDIX A6 - OFF PEAK REVISED TURNS BASE + CONSTRUCTIONReport · PDF23 Jan 2014View
APPNDIX A5 - OFF PEAK REVISED TURNS BASEReport · PDF23 Jan 2014View
LPS TRANSPORT ADDITIONAL TECHNICAL NOTE 2Report23 Jan 2014View
ROADS TRAFFIC COMMENTSCorrespondence · PDF13 Jan 2014View
SEPA COMMENTSCorrespondence · PDF9 Jan 2014View
ROADS DRAINAGE COMMENTSCorrespondence · PDF8 Jan 2014View
AMENDED STANEY HILL QUARRY PLANDrawing · PDF11 Dec 2013View
SUPERSEDED STANEY HILL QUARRY PLANDrawing · PDF10 Dec 2013View
APPENDIX E3 AIR TECHNICAL ASSESSMENT AND SENSITIVITY ANALYSIS WITH ISOPLETHSReport · PDF10 Dec 2013View
SUPPLEMENTARY TECHNICAL NOTE 1 ?Report · PDF10 Dec 2013View
SEPA LETTER RE: STANEY HILL LANDFILLCorrespondence · PDF10 Dec 2013View
SHETLAND POWER STATION DRAINAGE IMPACT ASSESSMENTReport · PDF10 Dec 2013View
EMAIL CORRESPONDENCE WITH APPLICANT RE: COOLING OPTIONSCorrespondence · PDF28 Nov 2013View
EMAIL CORRESPONDENCE WITH APPLICANT RE: ROADS SERVICE COMMENTSCorrespondence · PDF19 Nov 2013View
EMAIL CORRESPONDENCE WITH APPLICANT RE: ROADS SERVICE COMMENTSCorrespondence · PDF15 Nov 2013View
ROADS TRAFFIC COMMENTSCorrespondence · PDF14 Nov 2013View
NATURAL HERITAGE OFFICER COMMENTSCorrespondence · PDF13 Nov 2013View
SNH COMMENTSCorrespondence · PDF13 Nov 2013View
MARINE PLANNING COMMENTSCorrespondence · PDF13 Nov 2013View
COMMUNITY COUNCIL COMMENTSCorrespondence · PDF12 Nov 2013View
ENVIRONMENTAL HEALTH COMMENTSCorrespondence · PDF5 Nov 2013View
EMAIL CORRESPONDENCE WITH SCOTTISH GOVERNMENT RE EXTENSIONCorrespondence · PDF4 Nov 2013View
SEPA COMMENTSCorrespondence · PDF4 Nov 2013View
EMAIL CORRESPONDENCE WITH SCOTTISH GOVERNMENT RE EXTENSIONCorrespondence · PDF1 Nov 2013View
SCOTTISH WATER COMMENTSCorrespondence · PDF30 Oct 2013View
ARCHAEOLOGIST COMMENTSCorrespondence · PDF25 Oct 2013View
HISTORIC SCOTLAND COMMENTSCorrespondence · PDF24 Oct 2013View
ROADS DRAINAGE COMMENTSCorrespondence · PDF18 Oct 2013View
OUTDOOR ACCESS OFFICER COMMENTSCorrespondence · PDF17 Oct 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX K2 - FRAMEWORK TRAVEL PLANOther · PDF16 Oct 2013View
EMAIL TO AGENT RE: REDACTIONCorrespondence · PDF16 Oct 2013View
ENVIROMENTAL STATEMENT VOL 2 - SEAL OBSERVATIONSDrawing · PDF15 Oct 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT BREIWICKDrawing15 Oct 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT3Drawing15 Oct 2013View
ENVIROMENTAL STATEMENT VOL 2 - APPENDIX D - CHP REPORTOther · PDF15 Oct 2013View
EMAIL CORRESPONDENCE WITH SCOTTISH GOVERNMENT RE: PAYMENTCorrespondence · PDF3 Oct 2013View
EMAIL CORRESPONDENCE WITH SCOTTISH GOVERNMENT RE: PAYMENTCorrespondence · PDF2 Oct 2013View
EMAIL CORRESPONDENCE WITH SCOTTISH GOVERNMENT RE: EIA ASSESSMENTCorrespondence · PDF2 Oct 2013View
LETTER FROM MINISTRY OF DEFENCE RE: SITE OUTSIDE SAFEGUARDING AREACorrespondence · PDF1 Oct 2013View
APPLICATION CHECKLISTOther · PDF25 Sept 2013View
APPLICATION COVER LETTEROther · PDF25 Sept 2013View
APPLICATION DESIGN & ACCESS STATEMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 1-INTRODUCTIONOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 2-ASSESSMENT METHODOLOGYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 3 - SESSMENT OF ALTERNATIVESOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 4 - PROPOSED DEVELOPMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 5-CONSTRUCTION PROGRAMMEOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 6-PLANNING POLICYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 7 - AIR QUALITYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 9 - CULTURAL HERITAGEOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 10 - WATER RESOURCESOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 11-GROUND CONDITIONSOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 12-COASTAL PROCESSESOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 13-LANDSCAPE VISUALOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 14-TRAFFIC AND ACCESSOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 15-NOISE ASSESSMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 16-SOCIOECONOMICSOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 17-WASTEOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 18-OTHER ISSUESOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 19-RESIDUAL EFFECTSOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 1 -CHAPTER 20-GLOSSARYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - DESIGNATED SITE & FEATURESDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - CUMULATIVE SCHEMESDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - PROPOSED DEVELOPMENT ALL OPTIONSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - INDICATIVE LAYOUT SEAWATER COOLEDDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - INDICATIVE LAYOUT AIR COOLEDDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - CROSS SECTIONSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - ROAD DIVERSIONDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 -LOCATION OF AIR QUALITY RECEPTORSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 -LOCATION OF AIR QUALITY RECEPTORSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 -PHASE 1 HABS SURVEYDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 -NVC HABITATSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - LITTORAL BIOTOPESDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SUBLITTORAL BIOTOPESDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - DESIGNATED NATURE CONSERVATION SITESDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - CONSULTATION DATA BIRDSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SCHEDULED MONUMENTSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - LISTED BUILDING & CONSERVATION AREA 1Drawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - LISTED BUILDING & CONSERVATION AREA 2Drawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - HERDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - WATER RESOURCES & SURFACE WATER CATCHEMENTDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SUPERFICIAL DEPOSITSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SOLID GEOLOGYDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - LANDSCAPE DESIGNATIONSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - LANDSCAPE CHARACTER TYPES & AREASDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - ZONE OF THEORETICAL VISIBILITYDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT2Drawing25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT4Drawing25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT5Drawing25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT6Drawing25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SUPPLIMENTARY PHOTOMONTAGE 7Drawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - NOISE MONITORING LOCATIONSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - NOISE SENSITIVE RECEPTORSDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - NOISE CONTOUR PLOT OPTION 1Drawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - NOISE CONTOUR PLOT OPTION 2Drawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX A1 - SCOPING REQUEST & OPINIONOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX A2 - SUMMARY OF SCOPING RESPONSEOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX B - SITE OPTIONS APPRAISALOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX C - CONSULTATION STATEMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX E1 - CLIMATE IMPACT ASSESSMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX E2 - DISPERSION MODELLING METHODOLOGYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX E3 - AIR QUALITY TECHNICAL APPENDIXOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX F1 SITE DRAINAGE STRATEGYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX F2 THERMAL PLUME MODELLING REPORTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX F3 INITIAL DILUTION STUDYOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX G - OUTLINE CEMPOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX H - GAZETTEER OF CULTURAL HERITAGE ASSETOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX I2 - PEAT MANAGEMENT PLANOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX J1 - HD CALIBRATION REPORTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX J2 - WAVE MODELLING REPORTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX K1 - TRAFFIC & ACCIDENT DATAOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX L - NOISE TECHNICAL APPENDIXOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOLUME 3 - APPENDIX M - SCHEDULE OF MITIGATIONOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - VIEWPOINT LOCATIONSDrawing25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX D - CHP REPORTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 3 - APPENDIX I1 - PEAT STABILITY RISK ASSESSMENTOther · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SITE & LOCATION PLANDrawing · PDF25 Sept 2013View
ENVIROMENTAL STATEMENT VOL 2 - SITE ELEVATIONSDrawing · PDF5 Sept 2013View

Documents open on the council website. Browse council documents if a link has changed.

Application timeline

Council milestones and published deadlines. A deadline passing does not confirm a decision.

  1. Application Received Date

    Published milestoneCouncil source
  2. Application Validated Date

    Published milestoneCouncil source
  3. Determination Deadline

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  4. Latest Consultation Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source
  5. Decision Made Date

    Published milestoneCouncil source
  6. Decision Issued Date

    Published milestoneCouncil source
  7. Permission Expiry Date

    Past published deadline

    A published target or deadline. It does not confirm an outcome.

    Council source

Decision & conditions

No objections with proviso
DECISION LETTER SUPERSEDED DECISION LETTER FROM SCOTTISH GOVERNMENT
Planning conditions

Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.

Related records

Understand this planning record

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning application statuses explained

    Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.