Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,672Searchable applications
125Recorded as pending
98%Approval rate · 7,104 approved or refused records
113Refused applications

6,991 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2013/093/PPF

    To construct gas condensate pipeline (1630m) running from Shetland Gas Plant to Sullom Voe Terminal, and ancillary infrastructure including temporary and permanent access roads, pig receiver, emergency shut down value, access platforms and fibre optic cable

    Sullom Voe Terminal Mossbank Shetland ZE2 9TU

    Received 20 Mar 2013
  2. Decided2013/094/PPF

    To construct hardstanding area

    Behind The Decca Apartments Ladies Drive Lerwick Shetland ZE1 0NA

    Received 21 Mar 2013
  3. Decided2013/010/WL

    To construct a jetty

    Linga Isle Walls

    Received 18 Mar 2013
  4. Decided2013/095/PPP

    Erect dwellinghouse and improve exisiting access (planning permission in principle)

    Adacent To Bonheoga Glenburn Road Hamnavoe Burra Shetland ZE2 9JZ

    Received 25 Mar 2013
  5. Decided2013/097/PPF

    Installation of vehicle electic charging point (Retrospective Application)

    Viking Bus Station Commercial Road Lerwick Shetland ZE1 0LX

    Received 26 Mar 2013
  6. Decided2013/098/PPF

    Installation of vehicle electric charging pod point (Retrospective Application)

    Infrastructure Services Grantfield Lerwick Shetland ZE1 0NT

    Received 26 Mar 2013
  7. Decided2013/099/PPF

    Installation of vehicle electric charging pod point (Retrospective Application)

    North Ness Business Park Lerwick Shetland ZE1 0LX

    Received 26 Mar 2013
  8. Decided2013/100/PPF

    Installation of vehicle electric charging pod point (Retrospective Application)

    Clickimin Leisure Centre North Lochside Lerwick Shetland ZE1 0PJ

    Received 26 Mar 2013
  9. Decided2013/101/PPF

    Installation of vehicle electric charging pod point

    Lerwick Health Centre South Road Lerwick Shetland ZE1 0RB

    Received 26 Mar 2013
  10. Decided2013/103/SCR

    Environmental Impact Assessment (Scotland) Regulations 2011 Screening opinion regarding upgrade section of B9075 public road

    Sandwater Weisdale Shetland ZE2 9LP

    Received 28 Mar 2013
  11. Decided2013/104/AMSC

    To erect new house and garage

    Plot 11 Camp Brae Shetland ZE2 9QJ

    Received 28 Mar 2013
  12. Decided2013/105/PPF

    Erect dwellinghouse

    Adjacent To 1 Sandwick Symbister Whalsay Shetland ZE2 9AG

    Received 28 Mar 2013
  13. Decided2013/106/PPF

    To erect new single storey dwellinghouse with detached garage

    Mail Cunningsburgh Shetland ZE2 9HF

    Received 29 Mar 2013
  14. Decided2013/007/WL

    To deploy a pontoon

    Boatsroom Lunnaness

    Received 29 Mar 2013
  15. Decided2013/107/LBC

    Renew, replace and repaint external cladding; repair and replace windows including dormer windows and replace rotten timber and structural components (Part Retrospective Application)

    St Magnus Bay Hotel Hillswick Shetland ZE2 9RW

    Received 13 May 2011
  16. Decided2013/008/WL

    To modify an existing seaweed farm by moving and increasing longline length

    Hamnavoe, Lunnaness

    Received 29 Mar 2013
  17. Decided2013/108/PPF

    Extend workshop

    Staney Hill Industrial Estate Lerwick Shetland ZE1 0QY

    Received 29 Mar 2013
  18. Decided2013/109/PPF

    To form new access road including burn crossing and protective measures to sides of burn, erection of new house and wind turbine, foul drainage connection to existing public sewer

    Wirliegert Aith Shetland ZE2 9NW

    Received 1 Apr 2013
  19. Decided2013/110/PPF

    Erect 12m high, 6kw wind turbine & lay associated cables

    Fjell Westing Unst Shetland ZE2 9DW

    Received 29 Mar 2013
  20. Decided2013/111/PPF

    Re roof existing shed and change opening

    North House Hoswick Sandwick Shetland ZE2 9HL

    Received 2 Apr 2013
  21. Decided2013/011/MAR

    To develop a new mussel farm

    Bunya Sand, Mid Yell Voe, Yell

    Received 29 Mar 2013
  22. Decided2013/112/PPF

    To erect dwellinghouse

    Houlland Exnaboe Virkie Shetland ZE3 9JS

    Received 2 Apr 2013
  23. Decided2013/113/PPP

    To erect dwellinghouse with attached domestic garage

    Fladdabister Cunningsburgh Shetland ZE2 9HA

    Received 3 Apr 2013
  24. Decided2013/114/PPP

    Erection of dwellinghouse

    Vaster Tingwall Shetland ZE2 9SG

    Received 3 Apr 2013

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage