Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
6,991 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
West Dykes Staneydale Bridge Of Walls Shetland ZE2 9NS
Received 3 Apr 2013Themaro Tresta Bixter Shetland ZE2 9LT
Received 3 Apr 201311 Law Lane Lerwick Shetland ZE1 0EA
Received 4 Apr 2013Midway Playing Field Brae Shetland ZE2 9QJ
Received 4 Apr 2013Langsound Burra
Received 3 Apr 2013Holmlea Bressay Shetland ZE2 9EL
Received 4 Apr 2013North House Melby Sandness Shetland ZE2 9PL
Received 5 Apr 2013Unifirth West Burrafirth Shetland ZE2 9NT
Received 5 Apr 2013Inner Colla Firth Delting
Received 2 Apr 2013Seli Voe Sand
Received 2 Apr 2013West Of Langa Scalloway Islands
Received 2 Apr 2013Moo Ness Papa Little The Rona Aithness
Received 2 Apr 2013Parkgate Olnafirth
Received 5 Apr 2013Bight Of Cliffs Olnafirth
Received 5 Apr 201311 Mounthooly Street Lerwick Shetland ZE1 0BJ
Received 8 Apr 2013Clumlie Dunrossness Shetland ZE2 9JQ
Received 10 Apr 2013Fetlar Interpretive Centre Fetlar Shetland ZE2 9DJ
Received 10 Apr 2013Sumburgh Lighthouse Sumburgh Virkie Shetland ZE3 9JN
Received 11 Apr 2013East Pier, Blacksness, Scalloway Harbour
Received 5 Apr 2013Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
Received 10 Apr 2013Lower Scord East Voe Scalloway Shetland ZE1 0UQ
Received 17 Apr 2013Rovik Brae Shetland ZE2 9QJ
Received 17 Apr 2013Rovik Brae Shetland ZE2 9QJ
Received 17 Apr 201322-24 North Road Lerwick Shetland ZE1 0NQ
Received 18 Apr 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage