Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
8,674Searchable applications
125Recorded as pending
98%Approval rate · 7,104 approved or refused records
113Refused applications

6,991 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2013/115/PPF

    Construction of ramp

    West Dykes Staneydale Bridge Of Walls Shetland ZE2 9NS

    Received 3 Apr 2013
  2. Decided2013/116/PPF

    To install external access ramp to dwellinghouse

    Themaro Tresta Bixter Shetland ZE2 9LT

    Received 3 Apr 2013
  3. Decided2013/117/PPF

    Erect dwellinghouse

    11 Law Lane Lerwick Shetland ZE1 0EA

    Received 4 Apr 2013
  4. Decided2013/118/PPF

    To erect small storage building for sports equipment together with installation of 4 no. proprietary pitch-side dugout shelters for coaches, players and spectators

    Midway Playing Field Brae Shetland ZE2 9QJ

    Received 4 Apr 2013
  5. Decided2013/012/MAR

    To modify an existing mussel farm by moving/removing longlines, increasing longline length and deploying a pontoon

    Langsound Burra

    Received 3 Apr 2013
  6. Decided2013/119/PPF

    Coastal protection works

    Holmlea Bressay Shetland ZE2 9EL

    Received 4 Apr 2013
  7. Decided2013/120/PPF

    Sub division of house into two dwellings

    North House Melby Sandness Shetland ZE2 9PL

    Received 5 Apr 2013
  8. Decided2013/121/APN

    Erect general purpose agricultural shed

    Unifirth West Burrafirth Shetland ZE2 9NT

    Received 5 Apr 2013
  9. Decided2013/014/MAR

    To deploy a single 220m twin-headline mussel longline

    Inner Colla Firth Delting

    Received 2 Apr 2013
  10. Decided2013/013/MAR

    To deploy a single 220m twin-headline mussel longline

    Seli Voe Sand

    Received 2 Apr 2013
  11. Decided2013/015/MAR

    To deploy a single 220m twin-headed mussel longline

    West Of Langa Scalloway Islands

    Received 2 Apr 2013
  12. Unknown2013/016/MAR

    To deploy a single 220m twin-headline mussel longline

    Moo Ness Papa Little The Rona Aithness

    Received 2 Apr 2013
  13. Unknown2013/017/MAR

    To modify an exisiting mussel farm by relocating site and by changing growing equipment from twelve 110m twin-headline longlines to seven 220m twin headline longlines

    Parkgate Olnafirth

    Received 5 Apr 2013
  14. Decided2013/018/MAR

    To modify an exisiting mussel farm by relocating site and by changing growing equipment from sixteen 110m twin headline longlines to seven 220m twin headline longlines

    Bight Of Cliffs Olnafirth

    Received 5 Apr 2013
  15. Decided2013/122/ADV

    Erect signboards

    11 Mounthooly Street Lerwick Shetland ZE1 0BJ

    Received 8 Apr 2013
  16. Decided2013/123/PPF

    To erect single story dwellinghouse

    Clumlie Dunrossness Shetland ZE2 9JQ

    Received 10 Apr 2013
  17. Decided2013/124/PPF

    Install one dual outlet electric vehicle charging point

    Fetlar Interpretive Centre Fetlar Shetland ZE2 9DJ

    Received 10 Apr 2013
  18. Decided2013/125/PPF

    Temporary installation of two antennae 6.4m high and 9.5m high connected by cables to control equipment located in existing building

    Sumburgh Lighthouse Sumburgh Virkie Shetland ZE3 9JN

    Received 11 Apr 2013
  19. Decided2013/019/WL

    To moor a 'Coastel' (floating accommodation facility) for a period of up to two years

    East Pier, Blacksness, Scalloway Harbour

    Received 5 Apr 2013
  20. Decided2013/126/HAZ

    Variation of Hazardous Substances Consent (Ref: 2012/116/HAZ)

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 10 Apr 2013
  21. Decided2013/127/PPF

    To form hardstanding

    Lower Scord East Voe Scalloway Shetland ZE1 0UQ

    Received 17 Apr 2013
  22. Decided2013/128/PPP

    Erect dwellinghouse (Planning Permission in Principle)

    Rovik Brae Shetland ZE2 9QJ

    Received 17 Apr 2013
  23. Decided2013/129/PPP

    Erect dwellinghouse (Planning Permission in Principle)

    Rovik Brae Shetland ZE2 9QJ

    Received 17 Apr 2013
  24. Decided2013/130/ADV

    Erect signboards

    22-24 North Road Lerwick Shetland ZE1 0NQ

    Received 18 Apr 2013

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage