England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeCC/BTE/50/11/LB

    Continuation of repairs to Short Bridge, with works comprising repair & repointing of spandrel wall on east & west using new brickwork & lime mortar; rebuilding of retaining wall on west with new bricks & repairing & repainting of parapet on east & west using painted steel without compliance with condition 2 (Approved Details) to allow amendments to the design of the fencing above the south west retaining wall

    Short Bridge,Bridge Street,Coggeshall,Colchester

    Received 15 Jul 2011
  2. Decision MadeESS/34/11/MAL/41/1

    Continuation of the winning and working and subsequent restoration of the site permitted by ESS/12/98/MAL without compliance with Condition 6 (Removal of plant, machinery, foundations, roadways and buildings by 31 December 2011 and upon their removal the land shall be restored in accordance with agreed restoration scheme) to allow removal by 16 February 2014 and Condition 8 (Hours of operation) to allow night water pumping.

    Royal Oak Quarry,Chelmsford Rd,Danbury,Chelmsford,CM9 6TJ

    Received 2 Jul 2012
  3. Decision MadeESS/104/21/UTT

    Continuation of use without compliance with condition 2 (time limit), 3 (restoration) and 13 (aftercare) of planning permission ESS/09/17/UTT, to retain site offices, storage container, welfare facilities and car park for an additional temporary period.

    Ugley Landfill Site, Cambridge Road, Ugley, CM22 6HT

    Received 1 Dec 2021
  4. Decision MadeCC/COL/34/12/7/1

    Construction of a new 300 place primary school with external hard and soft play areas, canopy and 20 space car park

    Vacant Land, Circular Road East, Colchester

    Received 17 Jun 2013
  5. Decision MadeCC/UTT/151/07

    The continued use of a relocatable classroom unit until 31 October 2009 without complying with condition 1 (time limit) attached to planning permission CC/UTT/162/02

    Wimbish County Primary School,Maple Lane,Tye Green,Wimbish,Saffron Walden,CB10 2XE

    Received 25 Oct 2007
  6. Decision MadeCC/EPF/99/08

    The retention of a relocatable classroom unit until 31 August 2013 without complying with condition 2 (time limit) attached to planning permission CC/EPF/126/05

    Chigwell Primary School,50 High Road,Chigwell,IG7 6DW

    Received 3 Sept 2008
  7. Decision MadeESS/17/18/TEN/30/1

    Details pursuant to Condition 30 – Wheel Cleaning Facilities – ESS/17/18/TEN: Extraction of 3.8 million tonnes of sand and gravel as an easterly extension to the existing Wivenhoe Quarry, erection of sand and gravel processing plant and ancillary facilities, new vehicular access onto the B1027 Brightlingsea Road, and restoration to agriculture and low-level water-based nature conservation habitats, lowland meadow, woodland planting and hedgerow enhancement using approximately 1.2 million cubic metres of imported inert waste material

    Land to the south of Colchester Main Road, Alresford, Nr Colchester, C07 8DB

    Received 4 Oct 2022
  8. Decision MadeESS/10/18/BTE/SO

    Continuation of use of land for mineral extraction and ancillary use without compliance with Conditions 2 (Approved Details); 6 (Plant Site Layout) and 47 (Soil Storage Arrangements) of planning permission ESS/39/14/BTE granted for " Extraction of an estimated 2.5 million tonnes of sand and gravel together with the provision of an new access from Little Braxted Lane; and the installation/construction and operation of primary processing and ancillary facilities comprising washing and bagging plant, silt lagoons, weighbridge, site management office, mess room and maintenance workshop; with restoration to agriculture and water based nature conservation habitats” to enable the re-phasing of the working and restoration of the site, changes in soils bunds configuration and to provide car parking for visitors in the ancillary plant site area

    Land at Coleman’s Farm Quarry, Witham, Essex, CM8 3EX

    Received 4 May 2018
  9. Decision MadeESS/42/18/UTT/25/1

    Details pursuant to Condition 25 – Groundwater and surface water monitoring scheme (during operation) for planning application ref: ESS/42/18/UTT (Importation of inert material, installation and use of recycling plant to produce secondary aggregate and the final disposal of inert residues to facilitate restoration of the site)

    Newport Chalk Quarry, Chalk Farm Lane, Newport, Saffron Walden, Essex

    Received 14 Sept 2020
  10. Decision MadeESS/55/07/UTT/SO

    Screening Opinion: Cont. of mineral extraction & restoration of resulting void by landfilling with mixed waste, including both source separated and untreated waste. Reprofiling. Facilities for sorting recyclables from waste, in-vessel composting of domestic, commercial & ind. waste, followed by windrow composting prior to landfilling. In addition windrow composting of green waste. Restoration of the site either to agriculture, amenity or nature conservation afteruse

    Crumps Farm,Stortford Rd,Little Canfield,Great Dunmow,CM6 1SR

    Received 12 Nov 2007
  11. Decision MadeESS/42/23/BTE

    This application is the for proposed relocation of plant site, ready mixed concrete plant, bagging plant and associated ancillary facilities, including for establishment and use of a field conveyor network with bridge over Braxted Road; along with enhancement and use of existing points of access off Braxted Road, together with restoration to agricultural land and nature conservation habitats, in advance of the A12 road widening and improvement national infrastructure project on land at Colemans Farm Quarry.

    Appleford Farm CM8 3EZ (Colemans Farm Quarry Processing Plant Site Relocation)

    Received 28 Apr 2023
  12. Decision MadeESS/28/14/CHL/9/1

    Use of previously imported materials for the construction and expansion of a screening bund to the existing recycling facility and to achieve revised restoration of former silt lagoons to biodiversity areas. In addition approval under condition 42 of Planning Permission CHL/1890/87 to allow importation of 12,000m3 of clean soils and clays for restoration purpose

    Bulls Lodge Quarry, Generals Lane, Boreham, Chelmsford, CM3 3HR

    Received 10 Jul 2015
  13. Decision MadeESS/37/03/UTT

    Construction of GRP kiosk to house electrical control gear

    Great Chesterford WwTW,Mill Lane,Great Chesterford,Saffron Waldon

    Received 9 Jun 2003
  14. Decision MadeESS/13/15/BAS/22/1

    Details pursuant to condition 22 (Noise monitoring scheme) of ESS/13/15/BAS for Change of use and erection of buildings, hardstandings, roadways, parking and storage areas to enable the use of the site as a waste recycling and materials recovery facility (part retrospective)

    Land to the south of Terminus Drive, Pitsea Hall Lane, Pitsea, SS16 4UH

    Received 26 Aug 2016
  15. Decision MadeCC/BTE/140/08

    Continuation of development of a Recycling Centre for Household Waste without compliance with cond 2 (accordance with approved details) attached to planning permission CC/BTE/114/04 to allow the reduction in site area from 2.63ha to 2.515ha the subsequent realignment and change in level of the access road and decrease in parking area, together with the addition of 1 site office, 3 stores, 1 soil improver store

    Recycling Centre for Household Waste,Springwood Drive,Braintree,CM7 2YN

    Received 28 Nov 2008
  16. Decision MadeESS/12/17/ROC/4/1

    Details pursuant to Condition 4 – Car park landscape scheme - ESS/12/17/ROC: The erection of buildings comprising one Reception Hide and one Viewing Hide for use by the general public; the development of a staff compound comprising one Office Building and one Meeting Room Building, Staff Parking Area; the erection of one Workshop and development of a new Hardstanding; and associated works.

    Wallasea Island Wild Coast Project, Creeksea Ferry Road, Wallasea Island, SS4 2HD

    Received 21 Nov 2019
  17. Decision MadeP7/EPF/845/96/MIN/RE

    Reorganisastion of existing premises incl. entrance improvements, demolition of

    Barnfield - Epping Road - Roydon,Barnfield,Tylers Cross,Roydon,Harlow,CM19 5DP

    Received 26 Jun 1998
  18. Decision MadeCC/CHL/36/03

    Change of use of ground floor to create addtitional office space in connection with the school.

    Caretakers House, Moulsham Junior School, Princes Road, Chelmsford,Moulsham High, Junior & Infant School,Brian Close,Chelmsford,CM2 9ES

    Received 15 Apr 2003
  19. Decision MadeESS/26/23/COL

    Change of use of existing commercial building and yard to a waste transfer station and construction of retaining bays.

    Oyster Haven Business Park, Haven Road, Colchester, Essex, CO2 8HT

    Received 15 Mar 2023
  20. Decision MadeESS/47/07/UTT

    The windrow composting of green waste and waste wood, together with the importation and blending of soils and sands

    Crumps Farm,Stortford Rd,Little Canfield,Great Dunmow,CM6 1SR

    Received 12 Sept 2007
  21. Decision MadeESS/42/16/CHL/SO

    Erection of an Anaerobic Digestion plant, for the annual processing of 25,000 tonnes of agricultural slurry, crop and crop residues and 25,000 tonnes of food waste; together with weighbridge; combined heat and power unit; gas network entry facility; concrete apron; technical building, silage clamps, landscaping; provision of earth bunds and re-profiling of ground level; installation of lagoons and attenuation pond and associated infrastructure.

    Land at Bolton Farm, Boreham, Chelmsford, Essex, CM2 5AE

    Received 16 Sept 2016
  22. Application WithdrawnCC/UTT/10/06

    Proposed single storey reception extension to provide disabled access

    Newport Free Grammar School,Burywater Lane,Saffron Walden,CB11 3TR

    Received 12 Jan 2006
  23. Decision MadeESS/09/14/ROC

    Continuation of the importation of waste to develop a coastal nature reserve without compliance with conditions 2 (compliance with submitted details); 39 (cessation of operations and restoration by 31 December 2019); and 40 (removal of construction infrastructure) attached to planning permission ref ESS/54/08/ROC to allow the importation of suitable natural material and to require cessation of site operations and restoration by 31 December 2025, together with the inclusion of previously agreed non-material amendments to permission ref ESS/54/08/ROC.

    Land at Wallasea Island, Rochford, SS4 2HD

    Received 17 Jan 2014
  24. Decision MadeESS/47/10/ROC/29/1

    Visual impact mitigation scheme

    Cory Environmental, Mucking Hall Road, Barling Magna, Southend-on-sea, SS3 0NR

    Received 12 Oct 2011

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage