Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,915Searchable applications
140Recorded as pending
98%Approval rate · 8,501 approved or refused records
143Refused applications

8,358 approved · 143 refused · 310 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 18 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2008/352/PCO

    To erect dwellinghouse (in outline)

    Dalesbrek Dunrossness ZE2 9JJ

    Received 31 Oct 2008
  2. Unknown2007/352/PCD

    To create new cycle track

    Urafirth Hillswick ZE2 9RH

    Received 29 Aug 2007
  3. Unknown2004/352/PCD

    Erect anemometer mast (temporary to 31 March 2005)

    Da Heights Foula ZE2 9PN

    Received 26 Aug 2004
  4. Unknown2003/352/PCD

    Form vehicle access

    Scatsta BT Exchange Sullom ZE2 9RD

    Received 23 Sept 2003
  5. Unknown2009/351/PCD

    Erect 6kW turbine on 15 metre mast

    Cluness Cottage Burravoe Yell ZE2 9AY

    Received 30 Nov 2009
  6. Unknown2008/351/PCD

    To erect boat shed

    Virda East Voe Scalloway ZE1 0US

    Received 29 Oct 2008
  7. Unknown2007/351/PCO

    Erect dwellinghouse

    Longhill Bigton ZE2 9JF

    Received 21 Aug 2007
  8. Unknown2005/351/PCD

    Demolish existing garden shed and replace with new shed

    Kazan 2 Hayfield Court Lerwick ZE1 0AN

    Received 18 Oct 2005
  9. Unknown2004/351/PCD

    Erect anemometer mast (temporary to 31 March 2005)

    North of Baxter Chapel Foula ZE2 9PN

    Received 26 Aug 2004
  10. Unknown2009/342/PCD

    To erect a single 15kw wind turbine

    Parkhead Clousta Bixter ZE2 9LX

    Received 17 Nov 2009
  11. Unknown2008/342/PNA

    To erect agricultural building for storage of machinery and farm equipment

    Kirkhouse Twatt Bixter ZE2 9LX

    Received 22 Oct 2008
  12. Unknown2010/340/PCD

    Erect 20kw wind turbine (hub height 20m, blade height 26m) to serve dwellinghouse, local fire station and agricultural buildings

    Kirkhouse Twatt Bixter ZE2 9LX

    Received 2 Sept 2010
  13. Unknown2009/340/PCD

    To provide allotments for local community

    Brough Burravoe Yell ZE2 9AY

    Received 16 Nov 2009
  14. Unknown2008/340/PCD

    To construct caravan and camp site

    Westerhouse Sellafirth Yell ZE2 9DG

    Received 17 Oct 2008
  15. Unknown2002/340/PCD

    Extend dwellinghouse

    3 Baila Croft Lerwick ZE1 0EY

    Received 10 Sept 2002
  16. Unknown2010/339/PNA

    Erect polytunnel

    Cruegreen Ollaberry ZE2 9RT

    Received 2 Sept 2010
  17. Unknown2009/339/PCD

    To extend existing dwellinghouse

    Wynroyd Scousburgh Dunrossness ZE2 9JE

    Received 16 Nov 2009
  18. Unknown2006/339/PCD

    Erect 6kw wind turbine to serve Sandness Public Hall

    Sandness Public Hall Sandness ZE2 9PL

    Received 12 Sept 2006
  19. Unknown2004/339/PCD

    Erect garden summerhouse

    Shalders Stoneybrake Levenwick ZE2 9HX

    Received 16 Aug 2004
  20. Unknown2003/339/PCD

    Erect a storey and a half extension

    Mousaness South Whiteness ZE2 9LL

    Received 12 Sept 2003
  21. Unknown2002/339/PCD

    Erect dwellinghouse

    South Town Muckle Roe ZE2 9QJ

    Received 9 Sept 2002
  22. Unknown2010/338/PCD

    Erect 5kw domestic wind turbine on 18m mono-pole mast

    Greenmeadow Vidlin ZE2 9QB

    Received 2 Sept 2010
  23. Unknown2009/338/PCD

    To erect boundary fence (retrospective)

    3 Roebrek Brae ZE2 9QY

    Received 16 Nov 2009
  24. Unknown2008/338/PCD

    To extend and widen existing mast to 27.1m in height, 10.5m in width, 6 legged rectangular lattice mast, erect equipment cabin, meter cabinet, ancillary equipment and 4 transmission dishes

    Radio Station Scousburgh Dunrossness ZE2 9JE

    Received 15 Oct 2008

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage