Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,922Searchable applications
140Recorded as pending
98%Approval rate · 8,504 approved or refused records
143Refused applications

8,361 approved · 143 refused · 310 withdrawn. Received dates in our records: 10 Oct 2001 to 14 Oct 2026. Most recent record check: 18 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2006/338/PCD

    Erection of 9 metre high 6kw wind turbine

    Nort-hus Lunnister Sullom ZE2 9RD

    Received 12 Sept 2006
  2. Unknown2005/338/PCD

    To make temporary consent for boat shed permanent

    Loch of Spiggie Scousburgh Dunrossness ZE2 9JE

    Received 11 Oct 2005
  3. Unknown2003/338/PCD

    Change colour of house roof from grey to red

    Gordon Cottage Gord Levenwick ZE2 9HX

    Received 11 Sept 2003
  4. Unknown2004/360/PCR

    Erect dwellinghouse (reserved matters)

    Adjacent To Leagarth South Hoswick Sandwick ZE2 9HL

    Received 31 Aug 2004
  5. Unknown2003/360/PCD

    Construct clay pigeon shooting range, clubhouse and car park

    Shetland Clay Target Club Tingwall ZE2 9XJ

    Received 29 Sept 2003
  6. Unknown2002/360/PCD

    Erect double garage

    17 Nikkavord Lea Baltasound Unst ZE2 9XL

    Received 24 Sept 2002
  7. Unknown2009/359/PCD

    Temporarily site caravan for occassional use for the improvement & social wellbeing of croft and for use during the renovation of the existing croft house

    Croft Sound Weisdale ZE2 9LN

    Received 4 Dec 2009
  8. Unknown2007/359/PCD

    Erect dwellinghouse

    Sodom Symbister Whalsay ZE2 9AQ

    Received 30 Aug 2007
  9. Unknown2005/359/PCD

    Erect two, seven metre flag poles

    The Dykes Upper Sound Lerwick ZE1 0SR

    Received 25 Oct 2005
  10. Unknown2004/359/PCD

    Erect dwellinghouse

    Adjacent To Haagarth Taingarth Whiteness ZE2 9GJ

    Received 31 Aug 2004
  11. Unknown2003/359/PCD

    Site 2 storage containers

    Setter Hamnavoe Burra ZE2 9LB

    Received 29 Sept 2003
  12. Decided2002/359/NID

    Erect metal container for storage (street cleaning)

    Rear of public toilets Burn Beach Scalloway ZE1 0TP

    Received 24 Sept 2002
  13. Unknown2010/358/PCD

    Proposed temporary change of use of land for crushing and screening operations for a twelve (12) month period

    Hoofields Lerwick ZE1 0NU

    Received 21 Sept 2010
  14. Unknown2009/358/PCD

    Erect temporary 70m high metereological mast

    Runn Hill Nesting ZE2 9PP

    Received 2 Dec 2009
  15. Pending Consideration2008/358/PCD

    To realign road to facilitate road improvement works

    adjacent to Primary School Papa Stour ZE2 9PW

    Received 14 Nov 2008
  16. Unknown2002/348/PCD

    Alter and change use of former Shetland Times Office to form a place of religious worship

    44 Prince Alfred Street Lerwick Shetland ZE1 0EP

    Received 16 Sept 2002
  17. Unknown2008/337/PCD

    To erect dwellinghouse

    Roadside Da Sloagies Reawick ZE2 9NJ

    Received 15 Oct 2008
  18. Unknown2006/337/PNA

    Erect general purpose agricultural building

    North Hoga Voe ZE2 9PX

    Received 12 Sept 2006
  19. Unknown2005/337/PCD

    Erect 1 1/2 storey dwellinghouse and garage, and construct septic tank and sea-outfall

    Burravoe North Roe Shetland ZE2 9RY

    Received 7 Oct 2005
  20. Unknown2003/337/PCD

    Re-clad roof, re-new roof light and raise pitch of roof

    Catwell Eshaness ZE2 9RS

    Received 11 Sept 2003
  21. Unknown2002/337/PCD

    Erect extension for extra storage/working area

    P & T Coaches Hagdale Industrial Estate Baltasound Unst ZE2 9DS

    Received 9 Sept 2002
  22. Unknown2005/335/PCD

    Erect store

    Brae House Brae ZE2 9QG

    Received 7 Oct 2005
  23. Unknown2003/335/PCO

    Erect 3 dwellinghouses (in outline)

    Bankfield Ness of Sound Lerwick ZE1 0RN

    Received 9 Sept 2003
  24. Unknown2002/335/PCD

    Erect new entrance and lobby

    The Lerwick Hotel 15 South Road Lerwick ZE1 0RB

    Received 3 Sept 2002

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage