Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,482Searchable applications
136Recorded as pending
98%Approval rate · 8,260 approved or refused records
137Refused applications

8,123 approved · 137 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2025/299/TCA

    To remove DEAD branches 60 feet long from a tree which is in a dangerous condition

    Westshore Cottage WESTSHORE Scalloway Shetland ZE1 0XG

    Received 1 Dec 2025
  2. Decided2025/022/MAR

    To develop a new mussel farm comprising of 6 x 300m twin-headline longlines

    Spoose Holm Scalloway Islands Shetland

    Received 2 Dec 2025
  3. Decided2025/023/MAR

    To develop a new mussel farm comprising of 6 x 220m twin-headline longlines

    East Of Hildasay Scalloway Islands Shetland

    Received 2 Dec 2025
  4. Decided2025/300/PPP

    To build a new 2 bedroom residential property with integral garage and separate shed for a workshop.

    Site Swinister Sandwick Shetland

    Received 2 Dec 2025
  5. Unknown2025/301/ECUCON

    PROPOSED NESHION ENERGY PARK - Gatecheck 1

    Land To East Of Sullom Voe Oil Terminal Mossbank Shetland

    Received 2 Dec 2025
  6. Decided2023/275/DCON3

    Application for consent, agreement or approval required by planning Condition: 6 (MOD) and 12 (Aviation Lighting) of planning application 2023/275/PPF.

    North Hoo Fields Gremista Lerwick

    Received 3 Dec 2025
  7. Decided2025/302/PPP

    New dwellinghouse

    Plot Hillcrest Lerwick Shetland

    Received 4 Dec 2025
  8. Decided2025/303/PPF

    Garden storage shed 4.8m x 2.4m x 3.0m

    The Old Church Hall Mid Yell Yell Shetland ZE2 9BT

    Received 4 Dec 2025
  9. Decided2024/006/DCON1

    Application for consent, agreement or approval required by planning condition: 12 (Ecological Clerk of Works) of planning application 2024/006/PPF

    Luggies Knowe Hill Of Gremista, Reference HU 46191 45162.

    Received 8 Dec 2025
  10. Decided2025/306/PPF

    Demolition of existing entrance porch; erection of new garage and vestibule; erection of new external balcony from dining room; conversion of former ground floor garage and store to granny flat.

    4 Hillcrest Lerwick Shetland ZE1 0ST

    Received 10 Dec 2025
  11. Decided2025/001/MDCON01

    To discharge condition no. 6 of Works Licence 2025/001/WL.

    Mossbank,Yell, Shetland

    Received 11 Dec 2025
  12. Decided2023/275/DCON4

    Application for consent, agreement or approval required by planning Condition: 4 (surface drainage) and Condition 9 (Biodiversity) of planning application 2023/275/PPF.

    North Hoo Fields Gremista Lerwick

    Received 28 Nov 2025
  13. Pending Consideration2025/307/PPF

    To extend the existing workshop and office.

    Nodri Ltd Staney Hill Industrial Estate Lerwick Shetland ZE1 0NA

    Received 12 Dec 2025
  14. Decided2025/308/PPF

    Install 25 Temporary accommodation cabins, new septic tank system and temporary Electricity Supply Unit comprising 2 Generators, Battery pack and Slave tank.

    Land West Of The Puffin Building Fair Isle Shetland

    Received 16 Dec 2025
  15. Pending Consideration2025/309/PPF

    Replacement of the existing 2-storey training cabin and installation of an additional welfare unit and airing cage and external waiting shelter.

    Scottish Fire And Rescue Service Training Centre Sumburgh Airport Virkie Shetland Islands ZE3 9JP

    Received 16 Dec 2025
  16. Decided2025/311/PPF

    Installation of replacement sludge holding tank.

    Eela Water Treatment Works, Ollaberry, Shetland

    Received 16 Dec 2025
  17. Decided2024/264/DCON1

    Application for consent, agreement or approval required by planning Condition: 5 - Construction details for the throttle and overflow arrangements of planning application 2024/264/PPF

    Land At Garth Farm Mossbank Shetland ZE2 9QR

    Received 16 Dec 2025
  18. Decided2025/312/PPF

    Demolish Existing 4 Bedroom House and garage. Construct new storey and half, 4-Bedroom house with separate garage and ASHP.

    Sand House/Cottage Lower Hillside Gulberwick Shetland

    Received 17 Dec 2025
  19. Decided2025/314/PPF

    Proposed external alterations and PV installation.

    Malakoff Limited North Ness Lerwick Shetland ZE1 0LZ

    Received 18 Dec 2025
  20. Decided2025/315/PPF

    Replace failing septic tank with new treatment plant and partial soakaway.

    Voxter Outdoor Centre Voxter Brae Shetland ZE2 9QP

    Received 18 Dec 2025
  21. Decided2025/316/PPF

    To erect Pier Amenity Building with 14 solar panels on roof

    Mid Yell Pier Mid Yell Shetland

    Received 19 Dec 2025
  22. Decided2024/264/DCON2

    Application for consent, agreement or approval required by planning Condition: 6 - (Biodiversity Implementation Scheme) of planning application 2024/264/PPF

    Land At Garth Farm Mossbank Shetland ZE2 9QR

    Received 19 Dec 2025
  23. Decided2023/249/NMV

    Non-Material Variation to vary planning permission 2024/130/PPF to process site-won excavated rock for reuse within the permanent works by using mobile rock crushing plant.

    Shetland Islands Council Old Anderson High School TWAGEOS ROAD Lerwick Shetland

    Received 17 Dec 2025
  24. Decided2025/317/PPF

    The erection of 2 no. wind turbines (each with a generating capacity of up to 4.8 MW), with a maximum hub height of 85 metres and a maximum blade tip height of 149.9 metres, and associated infrastructure.

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 19 Dec 2025

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage