Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,121 approved · 137 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Kiandra Symbister Whalsay Shetland ZE2 9AG
Received 30 Oct 2025Section 3 - A2 - New Access Track Frakkafield
Received 6 Nov 2025Railsbrough Catfirth
Received 6 Nov 2025Laxfirth Tingwall
Received 6 Nov 2025North Hoo Fields Gremista Lerwick
Received 4 Nov 2025Gremista Lerwick
Received 10 Nov 2025Stromfirth Whiteness Shetland
Received 10 Nov 2025Bressay Radio Station Bressay Shetland
Received 10 Nov 2025Kirkabister Shore End Yell
Received 10 Nov 2025Kirk Knowe Shore End Fetlar
Received 10 Nov 20252 Camp Brae Shetland ZE2 9BY
Received 11 Nov 2025Hjogaberg 3 Quoys Road Lerwick Shetland ZE1 0WH
Received 13 Nov 2025Fair Isle Telecommunications Site Ward Hill Fair Isle
Received 13 Nov 2025Bonhoga Veensgarth Tingwall Shetland ZE2 9SE
Received 14 Nov 2025West Of Burwick Scalloway Shetland
Received 14 Nov 2025Papil BURRA
Received 17 Nov 2025The B9082 Cullivoe Road Between Gutcher And Stonganess In Cullivoe.
Received 19 Nov 2025Bruray Skerries
Received 21 Nov 202530 Stura Gott Tingwall Shetland ZE2 9FJ
Received 24 Nov 2025Fogrigarth West Burrafirth Shetland ZE2 9NT
Received 24 Nov 2025Site Off A968 Baltasound UNST
Received 24 Nov 2025Roadside Heglabister Weisdale Shetland ZE2 9LN
Received 26 Nov 2025Setter House Weisdale Shetland ZE2 9LW
Received 27 Nov 2025Site North Of 'Kalna', Nesbister, Shetland.
Received 1 Dec 2025Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage