Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,342Searchable applications
137Recorded as pending
99%Approval rate · 8,178 approved or refused records
122Refused applications

8,056 approved · 122 refused · 270 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Unknown2023/158/PN

    Prior Notification for Farm-related Building Works (Non-residential) Agricultural shed 14 x 11 M

    Schiehallion Dale Walls Shetland ZE2 9PE

    Received 16 Jun 2023
  2. Decided2022/331/DCON

    Application for consent, agreement or approval required by planning condition 5 (Written scheme of Investigation)

    Cooke Aquacultures Factory Mid Yell Yell Shetland ZE2 9BN

    Received 16 Jun 2023
  3. Decided2023/159/ADV

    1 illuminated, advertising sign measuring 1060mm x 5273mm.

    Heima 74 Commerical Road LERWICK Shetland ZE1 0NL

    Received 19 Jun 2023
  4. Unknown2023/160/PN

    Peatland Restoration

    Lumbister Reserve Yell Shetland

    Received 20 Jun 2023
  5. Decided2023/011/MAR

    To extend the existing Slyde mussel farm (Planning Permission Refs: SFA/ZET/096 & 2019/009/MAR) by siting a new group of 5 x 330m twin-headline longlines at the southern end of the existing farm and to relinquish the adjacent East Burrafirth mussel farm (Planning Permission Ref: SFA/ZET/087)

    Slyde/ East Burrafirth, Aith Voe

    Received 28 May 2023
  6. Decided2022/260/DCON8

    Application for consent, agreement or approval required by planning Condition 5 (Roads Agreement)

    Land By Lower Blackhill Industrial Estate, Gremista, Lerwick ZE1 0PX

    Received 21 Jun 2023
  7. Unknown2023/161/PN

    Prior Notification for Farm-related Building Works - Multi Purpose Shed 19M x 22M (Non-residential).

    Vassa Skellister South Nesting Shetland ZE2 9PP

    Received 21 Jun 2023
  8. Decided2023/162/PA

    Prior Approval for Demolition of buildings.

    Baltasound Junior High Baltasound Unst Shetland ZE2 9DY

    Received 21 Jun 2023
  9. Decided2023/163/PPF

    Erect 4-bedroom, 8 apartment 1 & 3/4 storey family dwellinghouse with integral garage, ASHP & future external store/workshop.

    Plot Newpark Brough Whalsay Shetland

    Received 21 Jun 2023
  10. Decided2023/164/LBC

    Access Gate to the rear of the property - Retrospective

    The Old Church Hall Mid Yell Yell Shetland ZE2 9BT

    Received 28 Jun 2023
  11. Decided2023/165/PPF

    Construction of a freestanding shed/garage and formation of an access and turning/parking area

    The Old Church Hall Mid Yell Yell Shetland ZE2 9BT

    Received 28 Jun 2023
  12. Decided2023/166/PPP

    6nr new-build detached dwellings (Planning Permission in Principle)

    Swinister Sandwick

    Received 28 Jun 2023
  13. Decided2023/167/PPF

    Construction of an extension to existing premises to create additional retail and sorting space

    Cope Ltd Port Business Park Lerwick Shetland ZE1 0TW

    Received 28 Jun 2023
  14. Decided2022/123/DCON11

    Application for consent, agreement or approval required by planning Condition 20 (Roads Condition Surveys) of planning application 2022/123/ECUCON

    Kergord To Gremista

    Received 28 Jun 2023
  15. Decided2023/168/PPF

    To extend existing dwelling house

    Kirkhoull Cullivoe Yell Shetland ZE2 9DD

    Received 29 Jun 2023
  16. Decided2022/226/DCON

    Application for consent, agreement or approval required by planning condition 4 (Colour Finishes)

    Northlea Swinister Sandwick Shetland ZE2 9HH

    Received 29 Jun 2023
  17. Decided2023/170/ADV

    Advertisement of the following types : Fascia Sign

    109 Commercial Street Lerwick Shetland ZE1 0DL

    Received 5 Jul 2023
  18. Decided2023/171/PPF

    Proposed two storey dwellinghouse with associated driveway and drainage arrangements (resubmission of Planning Application Ref. 2021/339/PPF)

    Plot Skellister South Nesting Shetland

    Received 5 Jul 2023
  19. Decided2023/012/MAR

    To regularize the siting of 12 x 100m-circumference cages and a 10m-diameter c-cap feed barge used for salmon production in a modified location at an existing consented fish farm (retrospective).

    Winna Ness, Uyeasound, Unst, Shetland

    Received 6 Jul 2023
  20. Decided2023/173/SCR

    EIA screening opinion in respect of the proposed development of a new 33 kV switching compound and associated infrastructure

    Sullom Voe Terminal Power Station Callbackness Mossbank Shetland ZE2 9TU

    Received 7 Jul 2023
  21. Decided2023/174/PPF

    Construction of a ground floor extension (retrospective)

    Melby House Melby Sandness Shetland ZE2 9PL

    Received 10 Jul 2023
  22. Decided2023/175/LBC

    Construction of a ground floor extension forming a utility area and Internal alterations to form en-suite facilities to all bedrooms and rearrangement to form additional en-suite bedroom on 1st floor

    Melby House Melby Sandness Shetland ZE2 9PL

    Received 10 Jul 2023
  23. Decided2023/176/PPF

    To construct a ground floor single storey extension and a new link corridor to an existing hospital to provide a weather proof enclosure housing a new MRI Scanner facility; to divert existing footpaths and alter car park

    Gilbert Bain Hospital South Road Lerwick Shetland ZE1 0TB

    Received 10 Jul 2023
  24. Decided2022/147/DCON1

    Application for consent, agreement or approval required by planning Condition 4 (surface water drainage) Condition 5 (WSI) Condition 6 (hours of working) and Condition 7 (CEMP) of application ref 2022/147/PPF

    Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY

    Received 5 Jul 2023

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage