Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,057 approved · 122 refused · 270 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 5 Jul 2023Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 5 Jul 2023Old School Skellister South Nesting Shetland ZE2 9PP
Received 10 Jul 2023Land At Lamba Ness, Unst, Shetland
Received 11 Jul 2023Plot 2 Bridge End Burra Shetland
Received 10 Jul 2023Braelea Highmount Road Hamnavoe Burra Shetland ZE2 9JY
Received 17 Jul 2023Mail Ayre South Voxter Cunningsburgh Shetland ZE2 9HF
Received 18 Jul 2023East of Rocklea, South Whiteness, Shetland, ZE2 9LL
Received 21 Jul 2023Mossy Hill Land To The West Of A970 Between Lerwick & Scalloway Shetland
Received 21 Jul 2023Hill Of Dale (Mossy Hill) Northing 1141819 Easting 443452
Received 21 Jul 202341 Norstane Lerwick Shetland ZE1 0QG
Received 25 Jul 2023House Of Hope 9 Mounthooly Street Lerwick Shetland ZE1 0BJ
Received 25 Jul 2023Billy Baa, North Scalloway, Shetland (between Sandsound Voe And Weisdale Voe)
Received 24 Jul 2023Plot East Of 'Lotrans' Gott Tingwall Shetland
Received 25 Jul 2023Plot Twatt Bixter Shetland
Received 25 Jul 2023Plot 3 South Whiteness Whiteness Shetland
Received 25 Jul 2023100 - 104 Commercial Street Lerwick Shetland ZE1 0EX
Received 25 Jul 2023T & N Joinery Ltd Market Street Lerwick Shetland ZE1 0JP
Received 26 Jul 2023Gremista Lerwick Shetland
Received 27 Jul 2023Kowloon Norbister Burra Shetland ZE2 9LE
Received 31 Jul 202356 Commercial Street Lerwick Shetland ZE1 0BD
Received 2 Aug 2023Cross Geo Haroldswick Unst Shetland ZE2 9EF
Received 7 Aug 2023Church Of Scotland Tagon Voe Shetland ZE2 9PT
Received 4 Aug 2023Church Of Scotland Tagon Voe Shetland ZE2 9PT
Received 4 Aug 2023Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage