Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,240Searchable applications
136Recorded as pending
99%Approval rate · 8,110 approved or refused records
119Refused applications

7,991 approved · 119 refused · 267 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2022/262/PPF

    To install a 44kVA electric vehicle charge point in the car park at Burn Beach which will serve two parking spaces

    Car Park, Burn Beach, Scalloway, ZE1 0US

    Received 5 Oct 2022
  2. Decided2022/263/PPF

    Proposal to extend the runway at the north end by 86m

    Foula Landing Strip Foula Shetland ZE2 9PN

    Received 6 Oct 2022
  3. Decided2022/264/PPF

    Site a 6m x 2.4m portable steel building for storage

    Aald SKULE Old School Aith Shetland ZE2 9NB

    Received 11 Oct 2022
  4. Decided2022/022/MAR

    Modification of an existing finfish farm by changing production equipment to eight 120m-circumference cages, increasing grid size, increase moorings area, reposition existing feedbarge and deploying a pole mounted top net system to be used for the on-growing of salmon

    Setterness South Yell Sound Shetland

    Received 11 Oct 2022
  5. Decided2022/023/MAR

    Modification of an existing finfish farm by increase moorings area and deploying a pole mounted top net system.

    Setterness North Yell Sound Shetland

    Received 10 Oct 2022
  6. Unknown2022/265/PN

    General purpose agricultural shed

    Westhouse Croft Westtown Skaw Whalsay Shetland

    Received 7 Oct 2022
  7. Decided2022/024/MAR

    To deploy two 90 metre circumference cages for the purpose of freshwater storage and associated piping (retrospective)

    Girlsta Wadbister Voe Shetland

    Received 13 Oct 2022
  8. Decided2022/109/DCON1

    Discharge condition 8 (surface water calculations) of planning application ref 2022/109/DCON1

    Plot 7 East Voe Scalloway Shetland

    Received 12 Oct 2022
  9. Decided2022/266/PPF

    The creation of two wader scrapes; one smaller and a second larger scrape in agricultural land, water control pipe will be installed on each scrape to allow for water to be held or released from the sites.

    North West Of The Loch Of Spiggie

    Received 14 Oct 2022
  10. Decided2022/267/PPF

    To demolish existing garage and out buildings to make way for extension to dwelling house; Renew existing house roof and windows; To form new parking area, landscape existing curtilage into terraces; install new Air Source Heat Pump, septic tank and filter bed.

    Grind Sandwick Shetland ZE2 9HY

    Received 14 Oct 2022
  11. Decided2022/268/PPF

    Extension to existing living room which is to be constructed over a section of existing balcony which is to be removed.

    Evergreen Fogralea Lerwick Shetland ZE1 0SE

    Received 17 Oct 2022
  12. Decided2022/270/SCR

    Request for a Screening Opinion for Proposed Lerwick Greener Grid Park Stabilisation and Battery Energy Storage Facility

    Land At Lower Blackhill Industrial Estate Gremista Lerwick Shetland ZE1 0TW

    Received 17 Oct 2022
  13. Decided2022/272/VCON

    Application to Vary Condition 03 Traffic Management Plan 2022/179/PPF

    135 - 143 Sandveien Lerwick Shetland ZE1 0RX

    Received 25 Oct 2022
  14. Decided2022/273/PPF

    Alterations to front entrance, new ramp, replacement flues, infill of clerestory, infill and adjustment to external louvres.

    Scalloway Swimming Pool New Road Scalloway Shetland ZE1 0TN

    Received 25 Oct 2022
  15. Decided2022/274/PPF

    Erect dwelling house with air source heat pump

    House Plot Swinister Sandwick Shetland

    Received 26 Oct 2022
  16. Decided2022/276/PPF

    Proposed Installation of Photovoltaic (PV) Panels and reharl exterior

    Church Of Scotland Papa Stour Shetland ZE2 9PW

    Received 31 Oct 2022
  17. Unknown2022/025/MAR

    To temporarily store 12 no. 7m x 7m cages at an existing fallow salmon farm (retrospective)

    Punds Voe Scalloway Shetland

    Received 28 Oct 2022
  18. Decided2022/277/PPF

    Undertake internal refurbishment and erect 2 small extensions

    71 Sandveien Lerwick Shetland ZE1 0RT

    Received 31 Oct 2022
  19. Decided2021/353/DCON5

    Application for consent, agreement or approval required by planning Conditions 5 (Road Network Mitigation), 7 (Construction Traffic Management Plan), 10 (hours of working), 11 (details of any contractors working area and set down areas) and 16 (waste materials) of application ref 2021/353/PPF

    Plot Port Business Park Lerwick Shetland

    Received 31 Oct 2022
  20. Decided2022/278/PPF

    Erect single storey dwelling house with air source heat pump, septic tank and soakaways

    Pund Fair Isle Shetland ZE2 9JU

    Received 31 Oct 2022
  21. Decided2021/014/DCON1

    Application for consent agreement or approval required by planning Condition 3 (proposed drainage details)

    Plot 2 Norbister Burra Shetland

    Received 27 Oct 2022
  22. Decided2022/280/PPF

    Erect dwelling house with attached garage and air source heat pump

    Plot 6 Sundibanks East Voe Scalloway Shetland

    Received 2 Nov 2022
  23. Unknown2022/282/PN

    General purpose agricultural shed.

    Islesburgh Sullom Shetland ZE2 9RE

    Received 3 Nov 2022
  24. Decided2022/284/PPF

    To install stainless steel flue, install roof light and replace 2no. windows.

    Colroy New Road Scalloway Shetland ZE1 0TS

    Received 3 Nov 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage