Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,206Searchable applications
135Recorded as pending
99%Approval rate · 8,092 approved or refused records
119Refused applications

7,973 approved · 119 refused · 266 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2022/002/MAR

    To develop a new mussel farm comprising of 6 x 260m twin-headline longlines

    SE Of Roesound Skerry Seli Voe Shetland

    Received 2 Feb 2022
  2. Decided2022/003/MAR

    To develop a new mussel farm comprising of 4 x 330m twin-headline longlines

    Tur Ness Urafirth Shetland

    Received 3 Feb 2022
  3. Decided2022/004/MAR

    To extend an existing 4 x 200m twin-headline longline shellfish farm by increasing longline length to 330m in a northerly direction to be used for the production of mussels

    Stromness Voe (Site 1) Shetland

    Received 2 Feb 2022
  4. Decided2022/005/MAR

    Vary Condition 7 of planning permission 2011/014//NS by deleting the first two bullet points of the condition relating to the requirement for sequential deployment of longlines at the site and restrictions relative to operation of Site 2, Stromness Voe respectively

    Stromness Voe (Site 1) Shetland

    Received 2 Feb 2022
  5. Decided2022/006/MAR

    To extend an existing 4 x 100m twin-headline longline shellfish farm by increasing longline length to 220m in a northerly direction to be used for production of mussels

    Stromness Voe (Site 2) Shetland

    Received 2 Feb 2022
  6. Decided2022/007/MAR

    Vary condition no. 7 of planning permission 2011/013/VS by deleting the second sentence of the condition relating to the requirement for sequential deployment of longlines at the site

    Stromness Voe (Site 2) Shetland

    Received 2 Feb 2022
  7. Decided2022/021/PPF

    Erect dwellinghouse with garage and air source heat pump

    Plot 2 Grunivoe Walls Shetland ZE2 9PF

    Received 3 Feb 2022
  8. Decided2022/008/WL

    Install a septic tank sea outfall pipe

    South Edge Aithsvoe Piers Breakwater Aithsvoe Cunningsburgh

    Received 7 Feb 2022
  9. Decided2022/022/PPF

    Undertake internal and external alterations - Demolish existing garage and rear porch, erect new single storey rear extension

    Stienna Roadside Hamnavoe Burra Shetland ZE2 9LA

    Received 7 Feb 2022
  10. Decided2022/023/PPP

    Change of use from Agricultural land to house site and access road (Planning Permission in Principle)

    Site A Ayres Of Selivoe Bridge Of Walls Shetland

    Received 7 Feb 2022
  11. Decided2022/024/PPP

    Change of use from Agricultural land to access road and house site (Planning Permission in Principle)

    Site B Ayres Of Selivoe Bridge Of Walls Shetland

    Received 7 Feb 2022
  12. Decided2022/025/PPP

    Change of use from agricultural land to access road and house site (Planning Permission in Principle)

    Site C Ayres Of Selivoe Bridge Of Walls Shetland

    Received 7 Feb 2022
  13. Decided2022/026/PPP

    Change of use from agricultural land to access road and house site (Planning Permission in Principle)

    Site D Ayres Of Selivoe Bridge Of Walls Shetland

    Received 7 Feb 2022
  14. Unknown2022/027/PN

    Create access track to croft park

    Field entrance, Banks, Cunnister, Yell.

    Received 8 Feb 2022
  15. Decided2022/029/PPF

    Erect front and side extension to dwellinghouse

    Blairwood 3 Sands Of Sound Lerwick Shetland ZE1 0SZ

    Received 11 Feb 2022
  16. Decided2022/030/PPF

    Erect dwellinghouse with associated access, drainage arrangements and air source heat pump

    Plot Near Kergord Hatchery Weisdale Shetland

    Received 14 Feb 2022
  17. Decided2022/031/PPF

    To change use of part of a dwellinghouse to studio/ workshop with display area and retail space

    Highlands East Voe Scalloway Shetland ZE1 0UR

    Received 14 Feb 2022
  18. Decided2020/239/DCON1

    Application to discharge condition 10 (waste storage/collection facillity) of Planning Application 2020/239/PPF

    4 Plots Swinister Sandwick Shetland

    Received 14 Feb 2022
  19. Decided2020/239/DCON2

    Application to discharge condition 12 (soil, spoil or waste materials) of Planning Application 2020/239/PPF

    4 Plots Swinister Sandwick Shetland

    Received 14 Feb 2022
  20. Decided2022/032/PPF

    Erect storage shed and installation of ASHP for existing Amenity Building

    Asta Camp Site Asta Scalloway

    Received 15 Feb 2022
  21. Decided2022/033/PPF

    Retrospective change of use of land to create a garden for use in association with the Maryfield Hotel

    Maryfield Hotel Bressay Shetland ZE2 9EL

    Received 15 Feb 2022
  22. Decided2022/034/PPF

    To extend dwelling house by erecting a porch and decking on front elevation

    16 King Harald Street Lerwick Shetland ZE1 0DJ

    Received 16 Feb 2022
  23. Decided2021/279/DCON1

    Request to Discharge Condition 3 (CEMP) of planning Application 2020/279/PPF

    North Haven Fair Isle Shetland ZE2 9JU

    Received 16 Feb 2022
  24. Decided2022/035/PPF

    Proposed facilities (Jet Car Wash, Car Charging Points & Car Parking Lighting) in conjunction with Sandwick Shop

    Sandwick Bakery Stove Sandwick Shetland ZE2 9HH

    Received 16 Feb 2022

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage