Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,971 approved · 119 refused · 266 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
21 Dalsetter Wynd Dunrossness Shetland ZE2 9JJ
Received 6 Dec 2021Vatnabrek East Collister Sandness Shetland ZE2 9PL
Received 6 Dec 202112A Commercial Street Lerwick Shetland ZE1 0AN
Received 7 Dec 2021Funzie Reserve Fetlar Shetland
Received 8 Dec 2021Site Adjacent To 'Ocean View' Breiwick Gott Shetland ZE2 9SF
Received 9 Dec 2021Bjorg Brunt Hammarsland Girlsta Shetland ZE2 9SQ
Received 10 Dec 2021Land Adjacent To The Cake Fridge Tearoom Roadside East Burrafirth Shetland ZE2 9NE
Received 10 Dec 2021Slett's Coastal Path Lerwick Shetland
Received 10 Dec 2021Gardens Of Skeld Skeld Shetland ZE2 9NL
Received 14 Dec 20212 Swarthoull Lerwick Shetland ZE1 0SN
Received 14 Dec 2021Catfirth, South Nesting, Shetland ZE2 9PP
Received 14 Dec 2021Catfirth, South Nesting, Shetland ZE2 9PP
Received 14 Dec 2021Grutness Pier Virkie Shetland ZE3 9JN
Received 15 Dec 2021Met Office Observatory Lerwick Shetland ZE1 0RR
Received 15 Dec 2021Fairview Levaneap Vidlin Shetland ZE2 9QB
Received 16 Dec 2021Shetland Times Bookshop 71 - 79 Commercial Street Lerwick Shetland ZE1 0AJ
Received 16 Dec 2021Shetland Times Bookshop 71 - 79 Commercial Street Lerwick Shetland ZE1 0AJ
Received 16 Dec 2021Site Adjacent Bankfield Lower Sound Lerwick Shetland ZE1 0RN
Received 16 Dec 2021Plot North Califf Gott Tingwall Shetland
Received 17 Dec 2021Kergord Brig Weisdale Shetland
Received 17 Dec 202117 Arheim Lerwick Shetland ZE1 0WY
Received 17 Dec 2021New House Roesound Reawick Shetland ZE2 9NJ
Received 20 Dec 2021Plot Adjacent Ronan Cottage Bigton Shetland
Received 20 Dec 202132 Commercial Street Lerwick Shetland ZE1 0AB
Received 20 Dec 2021Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage