Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,888 approved · 117 refused · 266 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 14 Dec 2020Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 14 Dec 2020Cullivoe Pier Cullivoe Yell Shetland ZE2 9DD
Received 14 Dec 2020Northing 1160349, Easting 441505
Received 15 Dec 2020Adjacent Backafield Muckle Roe Shetland
Received 11 Dec 20201 Montfield Lerwick Shetland ZE1 0QB
Received 16 Dec 2020Hilltop Bar Mid Yell Yell Shetland ZE2 9BJ
Received 16 Dec 2020Fair Isle Shetland
Received 15 Dec 2020Jubilee Flower Park Lerwick Shetland
Received 16 Dec 2020Scatsta Airport Scatsta Brae Shetland ZE2 9QP
Received 17 Dec 2020American Exchange Hillside Road Scalloway Shetland ZE1 0XB
Received 17 Dec 2020The Grid Reference Is The Approximate Centre Of The Site For Mossy Hill Wind Farm. The Centre Of The Site Is Located Approximately 2.4km From Outskirts Of Lerwick And Approximately 4.2km From Lerwick Harbour.
Received 17 Dec 2020The Rock Whiteness Shetland ZE2 9GJ
Received 18 Dec 2020Mousa, Shetland
Received 18 Dec 2020Funzie Fetlar Shetland
Received 18 Dec 202029 Market Street Lerwick Shetland ZE1 0JP
Received 18 Dec 2020Ronas Voe Northmavine Heylor Shetland ZE2 9RL
Received 18 Dec 2020Islesburgh Sullom Shetland Scotland ZE2 9RE
Received 21 Dec 20205 Commercial Road Lerwick Shetland ZE1 0LX
Received 22 Dec 2020Adjacent 171 Commercial Street Lerwick Shetland ZE1 0HX
Received 22 Dec 202081 Commercial Street Lerwick Shetland ZE1 0AD
Received 22 Dec 202013 Hill Lane Lerwick Shetland ZE1 0HA
Received 22 Dec 2020Unit 2 92 St Olaf Street Lerwick Shetland
Received 23 Dec 2020Outer Grunna Voe Dury Voe
Received 22 Dec 2020Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage