Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,822 approved · 116 refused · 263 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Central Mainland Shetland
Received 3 Oct 2019Leeskol 4 Scalloway Road Lerwick Shetland ZE1 0BT
Received 7 Oct 20193 Swarthoull Lerwick Shetland ZE1 0SN
Received 7 Oct 2019Norbister Burra Shetland ZE2 9LE
Received 8 Oct 20192 Greenfield Place Lerwick Shetland ZE1 0AQ
Received 8 Oct 2019Central Mainland Shetland
Received 9 Oct 2019Innersand Sand Garderhouse Shetland ZE2 9NQ
Received 9 Oct 2019Land (E:442570,N:1134920) Hillhead Quarff Shetland
Received 9 Oct 2019Plot 1 Norbister Burra Shetland
Received 10 Oct 201972 Commercial Street Lerwick Shetland ZE1 0DL
Received 10 Oct 2019Plot Ocraquoy Cunningsburgh Shetland
Received 14 Oct 2019Quendale Lane Lerwick Shetland ZE1 0RG
Received 14 Oct 2019Land Adjacent To Hildisvik Muness Unst ZE2 9DL
Received 14 Oct 201911 Veensgarth Gott Tingwall Shetland ZE2 9SB
Received 15 Oct 2019Lippie Geo Clift Sound
Received 15 Oct 2019Kergord Hatchery Brig Weisdale Shetland ZE2 9LW
Received 17 Oct 2019Ashville Hamnavoe Burra Shetland ZE2 9LA
Received 17 Oct 201910 Sletts Road Lerwick Shetland ZE1 0LJ
Received 17 Oct 2019Shetland Fisheries Hatchery Port Arthur Scalloway Shetland ZE1 0UN
Received 17 Oct 2019Cullivoe Pier Cullivoe Shetland ZE2 9DD
Received 18 Oct 2019Dales Voe Gremista Lerwick Shetland
Received 18 Oct 2019Whalsay Primary School Nursery Gardentown Symbister Whalsay Shetland ZE2 9AB
Received 18 Oct 2019Da Cro Duke Street Hamnavoe Burra Shetland ZE2 9LA
Received 18 Oct 2019Busts Croft Aith Bixter Shetland ZE2 9ND
Received 21 Oct 2019Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage