Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,826 approved · 116 refused · 263 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Captain Flints Esplanade Lerwick Shetland ZE1 0LL
Received 22 Oct 2019Baillister Tingwall Shetland ZE2 9SB
Received 24 Oct 201998 Commercial Street Lerwick Shetland ZE1 0EX
Received 24 Oct 2019Adjacent To Slipway Ronas Voe Northmavine
Received 25 Oct 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 10 Oct 2019Utnabrake Upper Scalloway Scalloway Shetland ZE1 0LR
Received 29 Oct 2019Utnabrake Upper Scalloway Scalloway Shetland ZE1 0LR
Received 30 Oct 2019Utnabrake Upper Scalloway Scalloway Shetland ZE1 0LR
Received 31 Oct 2019Phase 2 - Plot Wista Lerwick Shetland
Received 31 Oct 2019Lerwick Police Station Hillhead Lerwick Shetland ZE1 0HD
Received 1 Nov 2019Avensgarth Symbister Whalsay Shetland ZE2 9AQ
Received 4 Nov 2019Town's-end Garage Gremista Industrial Estate Gremista Lerwick Shetland ZE1 0PX
Received 4 Nov 201924 Stura Gott Tingwall Shetland ZE2 9FJ
Received 5 Nov 20193A Hangcliff Lane Lerwick Shetland ZE1 0EB
Received 5 Nov 2019Burradale Tingwall Gott Shetland
Received 5 Nov 2019Heylor Layby Northmavine Heylor Shetland Scotland ZE2 9RL
Received 5 Nov 2019Breckon Grazing B9082 Gloup Yell Shetland Islands ZE2 9DD
Received 5 Nov 2019Ennisfirth Houll Loch Gunnister Brae Shetland ZE2 9TT
Received 5 Nov 2019Land (E:428558,N:1145030) Hestinsetter Shetland ZE2 9NH
Received 7 Nov 2019Captain Flints Esplanade Lerwick Shetland ZE1 0LL
Received 11 Nov 2019North Of Kaynon Aithsetter Cunningsburgh Shetland ZE2 9HG
Received 12 Nov 2019Lower Site - Te Aroha Soundside Weisdale Shetland ZE2 9LR
Received 12 Nov 201940 Gardentown Symbister Whalsay Shetland ZE2 9AB
Received 13 Nov 201933 Commercial Road Lerwick Shetland ZE1 0NJ
Received 11 Nov 2019Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage