Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,819 approved · 116 refused · 263 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Plot Gulberwick Shetland
Received 13 Sept 2019Busts Croft Aith Shetland ZE2 9ND
Received 10 Sept 2019Hillview Brough Whalsay Shetland ZE2 9AL
Received 17 Sept 2019Fair Isle Water Treatment Works (WTW) Fair Isle
Received 13 Sept 2019East Lynne Hillside Road Sandwick Shetland ZE2 9HW
Received 13 Sept 2019Baillister Gott Tingwall
Received 17 Sept 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 17 Sept 20191 Hardbrakes Place Dunrossness Shetland ZE2 9GB
Received 19 Sept 201920 Burgh Road Lerwick Shetland ZE1 0LB
Received 20 Sept 2019Aithsvoe Pier Cunningsburgh Shetland
Received 20 Sept 2019Asta Golf Club
Received 23 Sept 2019Aithsvoe Pier Cunningsburgh Shetland
Received 19 Sept 2019Sundibanks East Voe Scalloway Shetland ZE1 0US
Received 20 Sept 2019Shoreside Bridge Of Walls Shetland ZE2 9NP
Received 24 Sept 2019Copland Lodberry Commercial Street Lerwick Shetland
Received 25 Sept 2019Hillswick Wildlife Sanctuary Hillswick Shetland ZE2 9RW
Received 26 Sept 2019Mid Yell Public Hall Mid Yell Yell Shetland ZE2 9BJ
Received 24 Sept 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 24 Sept 2019Plot Cunningsburgh Industrial Estate Cunningsburgh Shetland
Received 30 Sept 2019Central Mainland Shetland
Received 1 Oct 2019Baillister Gott Tingwall
Received 17 Sept 2019Lerwick Health Centre 19 South Road Lerwick Shetland ZE1 0RB
Received 3 Oct 2019Town Hall Hillhead Lerwick Shetland ZE1 0HB
Received 3 Oct 2019Utnabrake Upper Scalloway Scalloway Shetland ZE1 0LR
Received 4 Oct 2019Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage