Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,813 approved · 116 refused · 263 withdrawn. Received dates in our records: 2 Apr 2003 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
53 King Harald Street Lerwick Shetland ZE1 0EQ
Received 26 Aug 2019Utnabrake Upper Scalloway Scalloway Shetland ZE1 0LR
Received 26 Aug 2019Sound Service Station South Road Lerwick Shetland ZE1 0RD
Received 27 Aug 2019155 Commercial Street Lerwick Shetland ZE1 0EX
Received 27 Aug 2019Plot 1 Sand Garderhouse Shetland
Received 28 Aug 2019Marimas Vidlin Shetland ZE2 9QB
Received 28 Aug 2019Aith Lifeboat Station Aith
Received 29 Aug 2019Adjacent To 'Marimas' Vidlin Loch Vidlin
Received 30 Aug 2019Interpretive Centre Shore Station Burrafirth Unst SHETLAND
Received 30 Aug 2019West Of Balta Isle Balta Sound Unst
Received 29 Aug 20192 Sands Of Sound Lerwick Shetland ZE1 0SZ
Received 2 Sept 2019East Yell Public Hall Mid Yell Yell Shetland ZE2 9AX
Received 27 Aug 2019Sundibanks East Voe Scalloway Shetland ZE1 0US
Received 2 Sept 20191 Greenhoulls Park Brae Shetland ZE2 9QG
Received 4 Sept 201963 Gilbertson Road Lerwick Shetland ZE1 0HN
Received 9 Sept 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 6 Sept 2019Swarthoull Hestigarth Wester Skeld Shetland ZE2 9NJ
Received 6 Sept 2019Westown Bardister Ollaberry Shetland ZE2 9RU
Received 9 Sept 2019Central Mainland Shetland
Received 10 Sept 2019Central Mainland Shetland
Received 11 Sept 2019Central Mainland Shetland
Received 11 Sept 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 11 Sept 2019Unclassified Road To Upper Kergord Runs Approximately 1.5km, From A Junction With The B9075, Approximately 70M East Of B9075 Of Weisdale Crossing.
Received 11 Sept 2019The Checkout Main Street Scalloway Shetland ZE1 0TR
Received 12 Sept 2019Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage