Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,466Searchable applications
136Recorded as pending
98%Approval rate · 8,249 approved or refused records
133Refused applications

8,116 approved · 133 refused · 286 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2023/211/DCON7

    Application for consent, agreement or approval required by planning condition 7 (Commencement of Development)

    Lower Black Hill Industrial Estate Gremista Lerwick Shetland

    Received 28 May 2025
  2. Decided2025/142/PPF

    To carry out an agricultural access track upgrade and alteration works (retrospective application).

    Fladdabister Cunningsburgh Shetland ZE2 9EY

    Received 29 May 2025
  3. Decided2025/143/PPF

    To erect single storey 12m x 6m agricultural shed; surface water to free flowing ditch via French drain.

    Pund Fair Isle Shetland ZE2 9JU

    Received 30 May 2025
  4. Decided2025/145/VCON

    Continuation of consent 2018/109/VCON - To vary existing hazardous substances consent to increase the presence of gas condensate on site.

    Gas Plant Sullom Voe Mossbank Shetland ZE2 9TU

    Received 30 May 2025
  5. Decided2025/146/PPF

    To reinstate former bothy building to create self-contained living accommodation and create garage; install new sewage treatment plant.

    The Haa Bardister Ollaberry Shetland ZE2 9RU

    Received 30 May 2025
  6. Decided2025/147/LBC

    To reinstate former bothy building to create self-contained living accommodation and create garage; install new sewage treatment plant.

    The Haa Bardister Ollaberry Shetland ZE2 9RU

    Received 30 May 2025
  7. Decided2010/308/NMV

    Non-material variation to vary planning permission 2010/308/PCD (To erect a detached dwellinghouse with attached garage and separate shed) front/north elevation lounge protrusion omitted; house and garage width reduced; overall height and garage reduced.

    Brake Burra ZE2 9LB

    Received 2 Jun 2025
  8. Decided2025/148/PPF

    To site 2no. glamping pods; create new access from existing access track, parking and turning area; install new surface water attenuation device; install connection to public drainage network.

    Site Adjacent To 'Lotrans' Gott Shetland ZE2 9SB

    Received 3 Jun 2025
  9. Decided2024/212/DCON1

    Application for consent, agreement or approval required by planning condition 9 (External material colours pre siting) of planning permission 2024/212/PPF.

    Grindins Wester Skeld Shetland ZE2 9NL

    Received 3 Jun 2025
  10. Decided2025/149/PPF

    To erect a 1.5 storey dwellinghouse; install air source heat pump; extend existing access to create parking/turning area; install SUDS and associated drainage connections.

    Reidunn Mail Cunningsburgh Shetland ZE2 9HF

    Received 4 Jun 2025
  11. Decided2022/149/NMV

    Non-Material Variation to vary planning permission 2022/249/PPF to change approved layout of SIRGE AGI compound; installation of additional pedestrian walkway along with associated lighting and changes to approved fencing arrangements.

    Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY

    Received 4 Jun 2025
  12. Decided2025/150/PPF

    To install new Corrosion Protection Cable Tie-in (Hook up).

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 4 Jun 2025
  13. Decided2025/151/PPF

    To create new pathway; install lighting; install new drainage pipe.

    Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU

    Received 4 Jun 2025
  14. Unknown2025/152/HRA

    Mossbank to Yell 33kv faulted submarine cable replacement project habitat regulations appraisal to inform appropriate assessment and request for a regulation 62 written approval.

    Mossbank To Yell

    Received 5 Jun 2025
  15. Decided2025/154/PPF

    Change of use from storage/industrial to residential; dismantle and remove existing steel portal frame shed; install 2No. 2 bedroom prefabricated pods and associated access/parking; proposed foul drainage connecting into existing sewer.

    Millagord (Kirkloch) Uyeasound Unst

    Received 10 Jun 2025
  16. Decided2025/155/PA

    Prior approval for proposed peatland restoration.

    Herra Yell Shetland ZE2 9BL

    Received 10 Jun 2025
  17. Decided2025/156/PPF

    Change of use from Class 3 (food and drink) to Class 9 (residential) to create single dwellinghouse; install new windows and relocate front entrance door; remove existing porch link; remove existing chimney.

    9 Charlotte Street Lerwick Shetland ZE1 0JL

    Received 13 Jun 2025
  18. Decided2022/149/DCON4

    Application for consent, agreement or approval required by planning Condition 4 (CEMP), of application ref 2022/149/PPF.

    Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY

    Received 13 Jun 2025
  19. Unknown2025/160/PN

    Prior notification to erect a 26m x 9m agricultural building.

    Hooses Gossabrough Yell Shetland ZE2 9AU

    Received 16 Jun 2025
  20. Decided2025/161/PPF

    Change of use of land from domestic garden ground to croft land.

    Hevda Brettabister North Nesting Shetland ZE2 9PR

    Received 17 Jun 2025
  21. Decided2025/162/PPF

    Install 2 ground mounted air source heat pumps to north elevation.

    Stakkadale Cafe Bigton Shetland ZE2 9JA

    Received 17 Jun 2025
  22. Decided2023/249/DCON9

    Application for consent, agreement or approval required by planning condition 4 (Breeding Birds).

    Shetland Islands Council Old Anderson High School Twageos Road Lerwick Shetland

    Received 17 Jun 2025
  23. Decided2023/249/DCON10

    Application for consent, agreement or approval required by planning condition 5 (Otter Survey).

    Shetland Islands Council Old Anderson High School Twageos Road Lerwick Shetland

    Received 17 Jun 2025
  24. Unknown2025/164/PN

    Prior Notification for Farm-related Building 14 x 12

    Cro Bigton Shetland ZE2 9JF

    Received 20 Jun 2025

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage