Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,076 approved · 133 refused · 280 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
2 Annsbrae Gardens Lerwick Shetland ZE1 0BU
Received 18 Jun 202475 KING HARALD STREET LERWICK SHETLAND ZE1 0ER
Received 19 Jun 202415 St Sunniva Street Lerwick Shetland ZE1 0HL
Received 20 Jun 2024Symbister Harbour Symbister Whalsay
Received 21 Jun 2024Central Mainland Shetland
Received 21 Jun 20248 Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Received 21 Jun 2024The Old Church Hall Mid Yell Yell Shetland ZE2 9BT
Received 25 Jun 2024Huws Grays Freefield Road Lerwick Shetland ZE1 0NH
Received 26 Jun 2024Plot Lower Hillside Gulberwick Shetland
Received 26 Jun 202415 Ackrigarth Lerwick Shetland ZE1 0RQ
Received 26 Jun 2024Site West Of Craigmor Upper Baila Lerwick Shetland
Received 27 Jun 20243-5-7 Bank Lane Shetland ZE1 0DT
Received 28 Jun 2024Baelarie Aithsetter Cunningsburgh Shetland ZE2 9FQ
Received 28 Jun 2024North House Papa Stour Shetland ZE2 9PW
Received 28 Jun 2024Clickimin North Playing Fields Clickimin North Lochside Lerwick
Received 1 Jul 2024South Haven Fair Isle
Received 3 Jul 2024Plot A Stove Sandwick Shetland
Received 3 Jul 2024Vassa Skellister South Nesting Shetland ZE2 9PP
Received 4 Jul 2024Old Meeting Hall Hillside Road Scalloway Shetland ZE1 0XB
Received 9 Jul 2024New Bothy Geosetter Bigton Shetland
Received 9 Jul 2024Sullom Voe Terminal, Mossbank, Shetland, ZE2 9TY
Received 4 Jul 2024West Of Guddataing Atlaness Hamnavoe Burra Shetland ZE2 9XW
Received 11 Jul 2024North Of Highmount Hamnavoe Burra Shetland ZE2 9JY
Received 11 Jul 2024Ludi Burra Shetland ZE2 9LD
Received 11 Jul 2024Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage