Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,392Searchable applications
136Recorded as pending
98%Approval rate · 8,203 approved or refused records
129Refused applications

8,074 approved · 129 refused · 276 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 14 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2024/109/PPF

    Access road, laydown area, (retrospective) demolition of derelict cottage - Retention of existing communications apparatus

    Northmavine Heylor Shetland Islands ZE2 9RL

    Received 19 Apr 2024
  2. Unknown2024/110/PN

    Prior Notification for Borehole Kiosk in accordance with Class 40, part 3 (c and d)

    Location N:440237 E: 1156980 Upper Kergord

    Received 22 Feb 2024
  3. Decided2024/111/PPF

    17 new self-storage containers with parking (part retrospective)

    Hatals Self-storage Ltd Gott Tingwall Shetland

    Received 22 Apr 2024
  4. Decided2024/006/MAR

    To temporarily store a concrete feed barge at an existing fallow salmon farm (retrospective).

    Pobie Sukka, Ronas Voe, Shetland Islands

    Received 23 Apr 2024
  5. Decided2024/112/PPF

    Erect noise monitoring equipment (temporary) (retrospective)

    Houllscarpa E:440619 N:1152840

    Received 23 Apr 2024
  6. Decided2024/113/PPF

    To create area of hard-standing and to site steel storage containers (retrospective application).

    Old Scatsta Power Station Scatsta Brae Shetland ZE2 9UR

    Received 29 Apr 2024
  7. Unknown2024/114/PN

    Prior Notification for Farm-related Building Works (Non-residential).

    Newhouse Unfirth West Burrafirth Shetland ZE2 9NT

    Received 29 Apr 2024
  8. Decided2024/115/PPF

    New dwellinghouse, upgrade existing access track, install air source heat pump.

    Virda Papil Burra Shetland ZE2 9UY

    Received 29 Apr 2024
  9. Decided2024/116/PPF

    Create 4 new camping lodges, drainage, and parking for serviced pods, includes change of use of land

    Vacant Land Gord Houbie Fetlar Shetland ZE2 9DJ

    Received 29 Apr 2024
  10. Decided2024/117/PPF

    To install air source heat pump

    Bonhoga Gallery Brig Weisdale Shetland ZE2 9LW

    Received 30 Apr 2024
  11. Decided2024/118/PPF

    Change of use from derelict building to form 3 no. flats with associated landscaping, parking and drainage

    Park Hall Bixter Shetland ZE2 9LY

    Received 30 Apr 2024
  12. Unknown2024/119/PN

    Prior Notification for Farm-related Building Works (Non-residential).

    West Of Wasthamar South Whiteness Whiteness Shetland ZE2 9LL

    Received 30 Apr 2024
  13. Unknown2024/120/PN

    To form access track.

    Banks Croft Cunnister Yell Shetland ZE2 9DG

    Received 1 May 2024
  14. Unknown2024/121/PN

    Prior Notification for extension and renovation to existing nissan hut

    Gott Farm Gott Tingwall Shetland ZE2 9SE

    Received 2 May 2024
  15. Decided2024/056/DCON1

    Discharge of condition 4 (Biodiversity)

    Plot Isbister Whalsay Shetland

    Received 2 May 2024
  16. Decided2024/056/DCON2

    Discharge of condition 5 (Filter drain)

    Plot Isbister Whalsay Shetland

    Received 2 May 2024
  17. Unknown2024/123/PN

    Prior Notification for agricultural building

    Gossabrough Yell Shetland ZE2 9AU

    Received 2 May 2024
  18. Decided2023/298/DCON1

    Discharge of condition 4 - Biodiversity

    RS Henderson Warehouse Cullivoe Pier YELL Shetland Isles

    Received 29 Apr 2024
  19. Decided2024/125/PPF

    Install 5no. air source heat pumps.

    Tingwall Public Hall Gott Tingwall Shetland ZE2 9SE

    Received 3 May 2024
  20. Decided2024/126/PPF

    To erect extension.

    Midaal Gott Tingwall Shetland ZE2 9SF

    Received 6 May 2024
  21. Unknown2024/127/PN

    Extend existing an existing agricultural building

    Upper Flugarth Vidlin Shetland ZE2 9QD

    Received 6 May 2024
  22. Decided2024/128/PPF

    Erect new dwellinghouse, install air source heat pump, install associated foul water and surface water connections.

    East Of Bellburn Stove Sandwick Shetland ZE2 9HH

    Received 6 May 2024
  23. Pending Consideration2024/129/PPF

    Proposed satellite ground station incorporating six radomes and associated infrastructure.

    Land To The South East Of Baltasound Airfield Baltasound Unst Shetland ZE2 9DT

    Received 7 May 2024
  24. Decided2023/280/DCON1

    Discharge of condition 4 - archaeology method statement

    Voehaugr Dunrossness Shetland ZE2 9JG

    Received 6 May 2024

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage