Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
8,074 approved · 129 refused · 280 withdrawn. Received dates in our records: 29 Nov 2002 to 12 Oct 2026. Most recent record check: 15 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
West Of Burwick, Scalloway, Shetland
Received 3 May 2024Easter Score Holm, Scalloway, Shetland
Received 6 May 2024North Compound Off A970
Received 7 May 2024Land At Mossy Hill Wind Farm Circa 2.5km NW Of Lerwick E: 444549 N:1142610
Received 3 May 2024Reawick House Reawick Shetland ZE2 9NJ
Received 8 May 2024Reawick House Reawick Shetland ZE2 9NJ
Received 8 May 2024Dale Walls Shetland ZE2 9PE
Received 9 May 2024Voehaugr Dunrossness Shetland ZE2 9JG
Received 9 May 2024South Of Wild Airs Veensgarth Gott Tingwall Shetland ZE2 9SB
Received 10 May 2024Site North Of Roselea Cunningsburgh Shetland ZE2 9HG
Received 13 May 2024Plot 9 Culsetter Park Brae Shetland
Received 14 May 2024Easthouse Croft Duncansclate Burra Shetland ZE2 9LD
Received 14 May 2024Baillister Gott Tingwall
Received 16 May 2024Former G B Building Centre Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Received 17 May 2024Gott Farm Gott Tingwall Shetland ZE2 9SE
Received 17 May 2024Former G B Building Centre Lower Blackhill Industrial Estate Lerwick Shetland ZE1 0DG
Received 17 May 2024South Of Robinas Papa Stour Shetland ZE2 9PW
Received 17 May 202419 Culsetter Park Brae Shetland
Received 20 May 2024The B9082 Cullivoe Road between Gutcher and Stonganess in Cullivoe.
Received 20 May 2024GARTHBURN ASTA SCALLOWAY SHETLAND ZE1 0UQ
Received 22 May 2024Plot South Of Bay Cottage Cumliewick Sandwick Shetland
Received 23 May 2024Skellister Stores Catfirth South Nesting Shetland ZE2 9PP
Received 27 May 2024Voe Old Cemetery Voe Shetland
Received 27 May 2024Glendale Glen Hamnavoe Burra Shetland ZE2 9JY
Received 24 May 2024Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage