Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
9,623Searchable applications
135Recorded as pending
99%Approval rate · 7,730 approved or refused records
115Refused applications

7,615 approved · 115 refused · 259 withdrawn. Received dates in our records: 10 Sept 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2015/366/PPF

    Erect 6kw wind turbine on 15m tower

    Ellishadder Setter Sandwick Shetland ZE2 9HP

    Received 13 Oct 2015
  2. Decided2015/367/PPF

    Erect 6kw wind turbine on 15m tower

    Hillhead Ollaberry Shetland ZE2 9RT

    Received 13 Oct 2015
  3. Decided2015/369/PNT

    To install telecommunications cabinet

    Opp Holmslea Vidlin Shetland ZE2 9QB

    Received 12 Oct 2015
  4. Decided2015/370/PNT

    To install telecommunications cabinet

    N/O 43 Leaside Firth Mossbank Shetland ZE2 9TF

    Received 12 Oct 2015
  5. Decided2015/371/LBC

    External painting of building (Retrospective Application)

    The Shearing Shed Main Street Scalloway Shetland ZE1 0TR

    Received 12 Oct 2015
  6. Decided2015/372/PPF

    Erect 6kw wind turbine on a 15m tower

    Land To The East Of Stoneybrake Levenwick Shetland ZE2 9HX

    Received 15 Oct 2015
  7. Decided2015/373/PPF

    Demolish side porch to Knysna, existing garage and shed; extend existing parking area; erect new dwellinghouse

    Knysna 6 Burgh Road Lerwick Shetland Shetland ZE1 0LB

    Received 15 Oct 2015
  8. Decided2015/374/PPF

    Installation of a 6kW wind turbine on a 15m tower and excavation of associated trench for electricity cable

    Ernsmoor Brae Shetland ZE2 9QJ

    Received 15 Oct 2015
  9. Decided2015/375/PPF

    Installation of 2 No. 15kW wind turbines on 15m towers and excavation of associated trench for electricity cables

    Waste Management Facility Gremista Lerwick Shetland ZE1 0PU

    Received 15 Oct 2015
  10. Decided2015/376/PPF

    To erect garden shed

    2 Parkview Houlland Sandwick Shetland ZE2 9HP

    Received 15 Oct 2015
  11. Decided2015/377/PPF

    To install 2 no. windows

    The Sycamores 7 Hill Lane Lerwick Shetland ZE1 0HA

    Received 15 Oct 2015
  12. Decided2015/378/PPF

    To erect extension to existing dwellinghouse

    Hill Dykes Lubba Walls Shetland ZE2 9PD

    Received 15 Oct 2015
  13. Decided2015/380/PPP

    Demolition of an existing unused office building and the construction of a new 91 bedroom hotel with associated parking.

    Brevik House 27 South Road Lerwick Shetland ZE1 0TG

    Received 21 Oct 2015
  14. Decided2015/381/FORMB

    11kv high voltage overhead line

    Pund South Whiteness Whiteness Shetland ZE2 9LL

    Received 19 Oct 2015
  15. Decided2015/382/APN

    To erect agricultural storage shed

    Foraness Braewick Gott Tingwall Shetland ZE2 9SF

    Received 20 Oct 2015
  16. Decided2015/383/PPF

    To erect dwellinghouse

    Challister Whalsay Shetland ZE2 9AN

    Received 22 Oct 2015
  17. Decided2015/384/PPF

    To erect 2no. dwellinghouses

    Adjacent To Da Moorings South Whiteness Whiteness Shetland ZE2 9LL

    Received 22 Oct 2015
  18. Unknown2015/038/MAR

    To deploy a 160m x 40m sub-surface cage grid mooring system (retrospective). Also to deploy four 70m-circumference cages in said grid to be used for on-growing of salmon (proposed)

    West Of Skeo Taing, Baltasound Harbour, Unst

    Received 14 Oct 2015
  19. Decided2015/385/PNT

    Install telecommunications cabinet

    S/O Lesmar Bixter Shetland ZE2 9NA

    Received 20 Oct 2015
  20. Decided2015/386/PNT

    Proposed telecommunications

    Graven Mossbank Shetland ZE2 9QR

    Received 21 Oct 2015
  21. Unknown2015/387/PPF

    To erect wind turbine

    Roeness Reawick Shetland ZE2 9NJ

    Received 23 Oct 2015
  22. Decided2015/039/MAR

    To deploy three 440m twin-headline longlines (retrospective) and one 80m twin-headline longline (proposed) for production of mussels at the location of an existing consented mussel farm

    Noonsbrough, South Vementry

    Received 28 Oct 2015
  23. Decided2015/388/PPF

    To erect garden shed

    4 Parkview Houlland Sandwick Shetland ZE2 9WJ

    Received 23 Oct 2015
  24. Decided2015/389/ADV

    To erect signage (Retrospective Application)

    10 Lower Blackhill Industrial Estate Gremista Lerwick Shetland ZE1 0PX

    Received 23 Oct 2015

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage