Scotland · Local authority

Shetland Islands
Planning applications.

Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
9,628Searchable applications
135Recorded as pending
99%Approval rate · 7,732 approved or refused records
115Refused applications

7,617 approved · 115 refused · 259 withdrawn. Received dates in our records: 8 Sept 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areas3 mapped area records
Article 4 direction areasBoundary dataset not connected

Interactive planning map loads with JavaScript. Dataset sources are linked below.

Download Article 4 coverage for all authorities (CSV)

Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.

Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.

More application records

  1. Decided2015/390/PPF

    To install external access ramp

    17 Murrayston Lerwick Shetland ZE1 0RE

    Received 26 Oct 2015
  2. Decided2015/391/PPF

    To erect 2no. storage and net repair units with external storage areas

    Arlandra Industrial Area Gremista Lerwick Shetland ZE1 0PX

    Received 26 Oct 2015
  3. Decided2015/392/PPF

    To erect shed/workshop

    Vega Clumliewick Sandwick Shetland ZE2 9HH

    Received 28 Oct 2015
  4. Decided2015/393/LBC

    Replace slates and repair pointing on south gable chimney

    87 St Olaf Street Lerwick Shetland ZE1 0ES

    Received 27 Oct 2015
  5. Decided2015/394/PNT

    Prior notification for proposed telecommunications network

    Weisdale Shetland ZE2 9LN

    Received 28 Oct 2015
  6. Unknown2015/040/MPN

    Application for prior notification under classes 21A and 21B of the Town and Country Planning (General Permitted Development) (Scotland) Order 1992 (as amended): Revision of approved scheme from twelve 80m-circumference cages to eight 100m-circumference cages within a larger mooring grid and relocation of feed barge within the existing site area

    Flotta, Weisdale Voe

    Received 4 Nov 2015
  7. Decided2015/400/PPF

    To erect 11kw wind turbine on 15m mast (Retrospective Application)

    Norgaet Voe Shetland ZE2 9PT

    Received 3 Nov 2015
  8. Decided2015/401/PPF

    Change of use to class 6 storage & distribution from class 4 business use

    10 Lower Blackhill Industrial Estate Gremista Lerwick Shetland ZE1 0PX

    Received 4 Nov 2015
  9. Decided2015/041/MAR

    To deploy ten 220m twin-headline longlines (6+4 group layout with 12m longline spacing) for production of mussels at the location of an existing consented mussel farm (retrospective) and to enable future amended 5+5 group layout with 15m longline spacing (proposed)

    Seli Voe, Gruting

    Received 5 Nov 2015
  10. Decided2015/402/PPF

    To erect new repair and maintenance workshop at rear of existing premises; create lay down area for additional storage (in retrospect)

    Lower Scord East Voe Scalloway Shetland ZE1 0UR

    Received 6 Nov 2015
  11. Decided2015/403/PPF

    To erect dwelling house with integral garage, install air source heat pump, septic tank and infiltration system

    South Of Roadside Houlls Bridge-End Burra Shetland ZE2 9LE

    Received 6 Nov 2015
  12. Decided2015/404/PPF

    To erect two storey extension to existing dwellinghouse

    9 Tarland Lerwick Shetland ZE1 0SJ

    Received 9 Nov 2015
  13. Decided2015/405/AMSC

    To erect dwellinghouse and create new access

    Opposite Leagarth Hoswick Sandwick Shetland ZE2 9HL

    Received 9 Nov 2015
  14. Decided2015/406/PPF

    To erect dwelling house and alter existing communal car park

    Adjacent To 43 Fogralea Lerwick Shetland ZE1 0SE

    Received 12 Nov 2015
  15. Decided2015/407/PPF

    To erect external timber decking with low balustrade walls and pergola, timber shed, and temporary storage building to be removed on completion of works; to demolish existing dilapidated extension on south elevation and replace with larger extension

    Melby House Melby Sandness Shetland ZE2 9PL

    Received 12 Nov 2015
  16. Decided2015/408/LBC

    Remove and reinstate part of boundary wall using saved materials, temporary storage building, replace roof slates, install 2 dormer windows, replace existing sash & case windows with double-glazed sash & case windows, demolish lean-to, repair and paint external walls, erect entrance porch, demolish existing dilapidated extension and replace with larger extension, erect external timber decking with low balustrade walls and pergola, erect small timber shed - part retrospective

    Melby House Melby Sandness Shetland ZE2 9PL

    Received 12 Nov 2015
  17. Decided2015/409/PNT

    Prior notification to install additional or replacement telecommunications apparatus

    Lea Of Confirth Voe Shetland ZE2 9PY

    Received 11 Nov 2015
  18. Decided2015/410/PPF

    To change the existing laydown facility used for the construction of the TOTAL Shetland Gas Plant from a construction laydown area to an agricultural laydown area for the purpose of storing baled silage, equipment, etc. Part of the laydown area shall be restored to its existing condition.

    Mossbank Shetland ZE2 9QR

    Received 13 Nov 2015
  19. Decided2015/411/PPF

    To improve an area of land currently used for the rough grazing of sheep, land to be levelled, drainage improved and top soil spread with grass seed to improve the grazing quality, inert surplus excavated material from local constructions site shall be imported to level the site and create the industrial site areas

    Staney Hill Industrial Estate Lerwick Shetland ZE1 0QW

    Received 14 Nov 2015
  20. Decided2015/412/PPF

    To erect 3 no. 5kW wind turbines, 18 m to hub 21.5 m to tip

    Eela Water Treatment Works Ollaberry ZE2 9RT

    Received 16 Nov 2015
  21. Decided2015/413/PPF

    To continue siting 4 containers (Retrospective Application)

    Central Sandwick Shetland ZE2 9HN

    Received 16 Nov 2015
  22. Decided2015/414/PPF

    To construct dwelling house and access

    Hillock Dunrossness Shetland ZE2 9JR

    Received 18 Nov 2015
  23. Decided2015/415/PPF

    To construct dwelling house and access

    New House Swinster Sandwick Shetland ZE2 9HH

    Received 18 Nov 2015
  24. Decided2015/416/PPF

    Installation of gas export pipeline, 1.4km in length to be buried, the erection of associated above ground tie-in facility

    BP Exploration Operating Company Ltd Sullom Voe Terminal Mossbank Shetland ZE2 9TU

    Received 19 Nov 2015

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Shetland Islands

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage