Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,090 approved · 113 refused · 248 withdrawn. Received dates in our records: 24 Apr 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Rova Head Lerwick Shetland ZE1 0PY
Received 2 Apr 20142 Carlton Place Lerwick Shetland ZE1 0ED
Received 3 Apr 20142 Carlton Place Lerwick Shetland ZE1 0ED
Received 3 Apr 2014Wasterhus Upper Sound Lerwick Shetland ZE1 0SW
Received 3 Apr 2014Gateside Hillswick Shetland ZE2 9RW
Received 3 Apr 2014West Of Widembrekk Cunningsburgh Shetland ZE2 9HG
Received 4 Apr 2014Sumburgh Hotel Sumburgh Virkie Shetland ZE3 9JN
Received 7 Apr 2014Garth Yell Shetland ZE2 9DF
Received 9 Apr 2014Jawbones 23 Mounthooly Street Lerwick Shetland ZE1 0BN
Received 8 Apr 2014Grutness Sumburgh Virkie Shetland ZE3 9JN
Received 11 Apr 2014Sullom Voe Terminal Callbackness Mossbank Shetland ZE2 9TU
Received 11 Apr 2014Arlanda Yard Gremista Lerwick Shetland ZE1 0PX
Received 14 Apr 2014Accommodation Facility Sella Ness Industrial Estate Mossbank Shetland ZE2 9UR
Received 14 Apr 2014Vardasta Gletness South Nesting Shetland ZE2 9PS
Received 14 Apr 2014L Williamson Fish Sales Unit 2 Blydoit Industrial Estate East Voe Scalloway Shetland ZE1 0UG
Received 15 Apr 2014Plot 7 Flugalee Cunningsburgh Shetland ZE2 9HB
Received 15 Apr 2014Catfirth South Nesting Shetland ZE2 9PP
Received 16 Apr 2014Houster Aith Shetland ZE2 9NB
Received 17 Apr 2014Plot 2 Catfirth South Nesting Shetland ZE2 9PP
Received 17 Apr 2014Noss Farm Scousburgh Dunrossness Shetland ZE2 9JE
Received 17 Apr 2014Wick Of Belmont, Uyeasound, Unst
Received 16 Apr 2014South Of Head Of Mula, Uyeasound, Unst
Received 16 Apr 2014Clickimin Lerwick Shetland ZE1 0PJ
Received 24 Apr 2014Hillside Gulberwick Shetland ZE2 9JX
Received 25 Apr 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage