Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,095 approved · 113 refused · 248 withdrawn. Received dates in our records: 24 Apr 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
69A Commercial Street Lerwick Shetland ZE1 0AB
Received 25 Apr 2014Hamar Baltasound Unst Shetland ZE2 9DS
Received 28 Apr 2014Busta Brae Shetland ZE2 9QN
Received 28 Apr 2014Setter Farm House Setter Voe Shetland ZE2 9PX
Received 1 May 2014Pund Voe Shetland ZE2 9PX
Received 2 May 201457 Commercial Road Lerwick Shetland ZE1 0NL
Received 2 May 2014South Punds Levenwick Shetland ZE2 9HX
Received 2 May 2014Cloudin, Vaila Sound
Received 2 May 2014Gunnister Voe, Northmavine
Received 14 Mar 2014Burrastow, Vaila Sound
Received 2 May 2014South Gable Of 72 Commercial Street Lerwick Shetland ZE1 0DL
Received 5 May 2014Stead Of Aithness, Vementry
Received 6 May 2014Plot 4 North Heights Easter Quarff Quarff Shetland ZE2 9EY
Received 7 May 2014Adjacent To Leagarth Hoswick Sandwick Shetland ZE2 9HL
Received 8 May 2014Papa North, Swarbacks Minn
Received 8 May 2014Sumburgh Lighthouse Sumburgh Virkie Shetland Shetland ZE3 9JN
Received 8 May 2014Longwell House North Voxter Cunningsburgh Shetland ZE2 9HG
Received 8 May 2014Lerwick Health Centre South Road Lerwick Shetland ZE1 0RB
Received 8 May 2014Shetland Islands Council Office Headquarters 8 North Ness Business Park Lerwick Shetland ZE1 0LZ
Received 8 May 2014Grantfield Offices Grantfield Lerwick Shetland ZE1 0NT
Received 8 May 2014Clickimin Centre North Lochside Lerwick Shetland ZE1 0PJ
Received 8 May 2014North House South Whiteness Whiteness Shetland ZE2 9LL
Received 9 May 2014Ramnageo Uyeasound Unst Shetland ZE2 9DL
Received 9 May 2014Girlsta Hatchery Wadbister Girlsta Shetland ZE2 9SQ
Received 12 May 2014Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage