Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,011 approved · 113 refused · 248 withdrawn. Received dates in our records: 4 Jul 2006 to 7 Oct 2026. Most recent record check: 11 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
Tait Electronics (Shetland) Ltd Staney Hill Industrial Estate Lerwick Shetland Shetland ZE1 0NA
Received 4 Jun 2013Kalandseid Cauldhame Trondra Shetland ZE1 0XL
Received 4 Jun 2013Heathery Park Gulberwick Shetland ZE2 9GD
Received 4 Jun 2013Ark Aywick Yell Shetland ZE2 9AX
Received 7 Jun 2013Lower Staney Hill & North Lochside Lerwick Shetland ZE1 0PJ
Received 6 Jun 2013Cloddyknowe Meeting Hall Scousburgh Dunrossness Shetland ZE2 9JE
Received 10 Jun 2013Sand Haa Sand Garderhouse Shetland ZE2 9NQ
Received 10 Jun 2013Freester Skellister South Nesting Shetland ZE2 9PP
Received 10 Jun 2013Reafirth Mid Yell Yell Shetland ZE2 9BN
Received 10 Jun 2013Rockvilla 88 St Olaf Street Lerwick Shetland ZE1 0ES
Received 11 Jun 201311 Meadowfield Road Scalloway Shetland ZE1 0UB
Received 13 Jun 2013Fairview Levaneap Vidlin Shetland ZE2 9QB
Received 13 Jun 2013Garths Of Ham South Ham Bressay Shetland Shetland ZE2 9ER
Received 13 Jun 2013Easthouse Croft South Whiteness Whiteness Shetland ZE2 9LL
Received 13 Jun 2013Sellaness Industrial Estate Graven Mossbank Shetland ZE2 9QR
Received 15 Jun 2013Yaafield Bigton Shetland ZE2 9JA
Received 17 Jun 2013Kaila Ollaberry Shetland ZE2 9RT
Received 19 Jun 2013Building A Sumburgh Lighthouse Sumburgh Virkie Shetland Shetland ZE3 9JN
Received 20 Jun 2013Giggleswick Neapaback Burravoe Yell Shetland ZE2 9AY
Received 24 Jun 2013Veensgarth House Gott Tingwall Shetland ZE2 9SB
Received 24 Jun 2013Quarry Ladies Drive Lerwick Shetland ZE1 0QW
Received 25 Jun 20133B Sellaness Industrial Estate Graven Mossbank Shetland ZE2 9QR
Received 25 Jun 2013Westhouse East Burrafirth Shetland ZE2 9NE
Received 25 Jun 2013East Of Basta Ness Sound Of Hascosay Yell
Received 19 Jun 2013Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage