Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Scotland · Local authority
Explore collected planning applications and decisions for Shetland Islands. Search an address, application reference or proposal to find a record.
7,699 approved · 116 refused · 262 withdrawn. Received dates in our records: 20 May 2004 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Source: Historic Environment Scotland. Contains Historic Environment Scotland and Ordnance Survey data © Historic Environment Scotland – Scottish Charity No. SC045925 © Crown copyright and database right 2026. Open Government Licence v3.0. Data is indicative and may not contain the latest designations.
7,8,9,10 Herrislea Court Veensgarth Tingwall Shetland ZE2 9US
Received 27 Mar 2017Upper Hillend Voe Shetland ZE2 9PT
Received 27 Mar 2017Ward Of Bressay Bressay Shetland ZE2 9ER
Received 27 Mar 2017Quarry Ladies Drive Lerwick Shetland ZE1 0QW
Received 27 Mar 2017Twatt Bixter Shetland
Received 30 Mar 2017Lower Blackhill Industrial Estate Gremista Lerwick Shetland
Received 31 Mar 2017Glendale Trondra Shetland ZE1 0XL
Received 28 Mar 2017Access Track To Houll Loch Symbister Whalsay Shetland ZE2 9AL
Received 29 Mar 2017Kirkabister Basta Voe Yell
Received 31 Mar 201741 Norstane Lerwick Shetland ZE1 0QG
Received 3 Apr 2017Swinister Hill Swinister Delting Shetland
Received 30 Mar 2017Land Adjacent SGP Access Road Shetland ZE2 9UN
Received 4 Apr 2017Gate Hus Mitchells Walk North Ness Lerwick Shetland ZE1 0LX
Received 6 Apr 2017Tesco South Road Lerwick Shetland ZE1 0RD
Received 6 Apr 2017Relay Station Berry Farm Scalloway Shetland
Received 5 Apr 2017Collafirth Shetland ZE2 9RX
Received 5 Apr 20173 Gladstone Terrace Lerwick Shetland ZE1 0EG
Received 4 Apr 2017Weisdale Radio Station Shetland
Received 5 Apr 2017Girlsta Hatchery, Wadbister Voe
Received 6 Apr 2017Eshaness Lighthouse Eshaness Shetland ZE2 9RS
Received 7 Apr 2017Mossy Hill Hill Of Dale Hill Of Tagdale Mainland Shetland
Received 7 Apr 2017House Site Swinster Sandwick Shetland ZE2 9HH
Received 11 Apr 2017Adjacent Meadowvale Hotel Exnaboe Virkie Shetland ZE3 9JS
Received 12 Apr 201711 Bakland Lerwick Shetland ZE1 0SX
Received 12 Apr 2017Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
Planning procedures in Scotland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for Shetland Islands, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage