Northern Ireland · Local authority

Mid Ulster District Council
Planning applications.

Explore collected planning applications and decisions for Mid Ulster District Council. Search an address, application reference or proposal to find a record.

Collected application statistics

Collected records · All available dates
10,105Searchable applications
989Recorded as pending
98%Approval rate · 8,290 approved or refused records
175Refused applications

8,115 approved · 175 refused · 435 withdrawn. Received dates in our records: 9 May 2017 to 15 Oct 2026. Most recent record check: 17 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Council contacts

Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasBoundary dataset not connected
Article 4 direction areasBoundary dataset not connected

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Department for Infrastructure conservation area guides. Contact the council for current designations.

More application records

  1. Awaiting decisionLA09/2026/0548/O

    Proposed Dwelling on a Farm

    85 m South West of 40 Gortnagola Rd Donaghmore

    Received 27 May 2026
  2. DecidedLA09/2026/0549/A

    Removal of existing signage and the display of 3 no. illuminated fascia signs, 1 no. welcome sign and 1 no. illuminated pylon

    126 Tamnamore Road Dungannon

    Received 27 May 2026
  3. Permission GrantedLA09/2026/0550/LDP

    Infill development for 2 no houses with associates site works and landscaping

    Lands South of 44 The Major's Lane, Moy

    Received 27 May 2026
  4. UnknownLA09/2026/0551/NMC

    Reduction in number of openings to South-Western facade to reduce cost.

    16 Derganagh Road Knockloughrim Magherafelt BT45 8PS

    Received 27 May 2026
  5. Permission GrantedLA09/2026/0552/F

    Application ref LA09/2018/1384/F . We wish to vary condition 4 to allow the development to commence before completion of the new accesses. The school is to open in Sept 2027. To allow sufficient time to construct the new buildings to meet this date work will need to commence on the new structures in the first week of July 2026, however it has become apparent that the works to from the new access will not be complete at this time . This is due to factors outside the control of the applicant and the appointed contractor. NIE are required to relocate existing cabling in the roadway and their programme for this will delay the developers works in forming the new access. If the school is to open in the new academic year works to form the access and new buildings will need to initial run in parallel. It is our understanding that the condition is to partly to mitigate against the risk developers completing development and then failing to provide the access. We feel that there is no risk in this instance as the developer is a Statutory Body (EA) and contracts for all works are in place. The contractor will neccessarily be providing traffiic control around the works areas to facilitate the operations on site and formation of the new roadways . The intensification of use to the site will not occcur until completion. We therefore do not belive that varying the condition will present a greater road safety risk. A programme showing the critical dates which demonstrates the need for the works to both the newaccess and school to be carried out simultaniously is attached. The attached drawing shows the oriiginal phasing plan . By varying the condition we would hope to carry out phases 2+3 and possibly the initial stages of phase 4 in parallel time with phase 1. The exact timings being dependant on the progress of the works by NIE . The intent is to have phase 1 completed as expeditiously and as early in the contract as possible.

    Site On Gortgonis Road Coalisland adjacent to Sports Field and Occupied By existing Community Center

    Received 27 May 2026
  6. Awaiting decisionLA09/2026/0553/F

    Retention of access for 197A Drumagarner Road

    197A Drumagarner Road Kilrea BT51 5TP

    Received 27 May 2026
  7. Awaiting decisionLA09/2026/0554/F

    Proposed dwelling in substitution for previously approved application LA09/2016/0615/F

    25 Meters South West of 31 Slaghtneil Road Maghera

    Received 27 May 2026
  8. Awaiting decisionLA09/2026/0556/F

    2 No. replacement dwellings, with the retention of the existing dwellings for domestic storage

    209-211 Killyman Road Dungannon BT71 6RR

    Received 28 May 2026
  9. Permission GrantedLA09/2026/0557/O

    Proposed Site for Farm Dwelling and Detached Garage

    Lands Approx. 50M South-East of 123 Legamaghery Road Fivemiletown

    Received 28 May 2026
  10. Permission GrantedLA09/2026/0558/F

    Proposed replacement of existing flat roof with a pitched roof at front portion of existing hall

    127 Lough Fea Road, Cookstown

    Received 28 May 2026
  11. Permission GrantedLA09/2026/0559/LDP

    Single storey extension to rear of the dwelling to provide and extended bathroom and new en-suite room. Existing facing brick finsih to front return changed to natural stonework finish. New windows and external doors throughout. Internal alterations to existing layout

    11 Knockanroe Road Cookstown BT80 8SR

    Received 28 May 2026
  12. Awaiting decisionLA09/2026/0560/F

    Proposed demolition of outbuildings and structures to the rear of Nos. 135-137 Moore Street, and erection of 2 detached residential blocks (Total 4 no. apartment units) with associated parking, landscaping and site works.

    135-137 Moore Street Aughnacloy BT69 6AR

    Received 28 May 2026
  13. Permission GrantedLA09/2026/0561/F

    Storage area for metal materials

    Approx. 190M South-West of 27 Lurgylea Road Galbally

    Received 29 May 2026
  14. Awaiting decisionLA09/2026/0562/F

    Proposed Social Housing Development Consisting of 28No. Dwellings (19No. Semi-detached, 8No. Flats and 1No. detached) Including Associated Site Works

    Land opposite 6 Derryvale Park Dungannon

    Received 29 May 2026
  15. Awaiting decisionLA09/2026/0563/F

    Retention of access for 197B Drumagarner Road

    197B Drumagarner Road Kilrea BT51 5TP

    Received 29 May 2026
  16. Permission GrantedLA09/2026/0564/O

    Dwelling and garage

    Adjacent to 83 Moor Road Dernagh Coalisland

    Received 29 May 2026
  17. Awaiting decisionLA09/2026/0565/F

    Retention of access for 197C Drumagarner Road

    197C Drumagarner Road Kilrea

    Received 29 May 2026
  18. Awaiting decisionLA09/2026/0566/F

    Change of house type and increase of curtilage

    Adjacent to 86 Innisrush Road Portglenone

    Received 29 May 2026
  19. Awaiting decisionLA09/2026/0567/F

    Continued use of land for storage of trailers and car parking

    23 Ballymacombs Road Portglenone BT44 8NQ

    Received 29 May 2026
  20. Awaiting decisionLA09/2026/0568/F

    Proposed replacement dwelling & garage

    130M SW of 9 Farriter Rd Killeeshil

    Received 29 May 2026
  21. DecidedLA09/2026/0569/A

    New fascia sign

    Unit 2 21 Coleraine Road Maghera BT46 5BN

    Received 29 May 2026
  22. Permission GrantedLA09/2026/0570/RM

    Dwelling and garage

    Approximately 50M North East of 16 Scribe Road Bellaghy

    Received 1 Jun 2026
  23. Permission GrantedLA09/2026/0571/LDP

    The installation and commissioning of a 6.05 kWp roof-mounted solar PV. The works include mounting 10 No. solar panels onto an existing agricultural shed roof, installing a 3.68kW hybrid inverter, and an Eddi power diverter (allows excess PV to be used for hot water heating), complete with all associated electrical connections as per the current IET Wiring Regulations, metering, and scaffolding

    8 Rectory Road Tobermore Magherafelt BT455QW

    Received 1 Jun 2026
  24. Permission GrantedLA09/2026/0572/F

    Demolition and replacement basement garage and sunroom and associated minor alterations to fenestration of dwelling. Installation of roof mounted solar pv array to rear of dwelling. Erection of detached games room/gym building. Minor reconfiguration of driveway and associated landscaping.

    40 Aghagaskin Road Magherafelt

    Received 1 Jun 2026

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Mid Ulster District Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

Planning procedures in Northern Ireland differ from those in England. Use the authority’s own guidance for application requirements, comments and decision timescales.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Mid Ulster District Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage