Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
4,098 approved · 717 refused · 160 withdrawn. Received dates in our records: 18 Jan 2019 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
Freedom Worship Centre Western Road Southall UB2 5EA
Received 13 Apr 20263C The Broadway Southall UB1 1JR
Received 10 Apr 2026301 Greenford Avenue Hanwell W7 1AD
Received 13 Apr 2026Pitshanger Family Practice 209 Pitshanger Lane Ealing W5 1RQ
Received 13 Apr 202626 Acton Lane Chiswick W4 5ED
Received 7 Apr 2026Ealing Hospital Uxbridge Road Southall UB1 3HW
Received 13 Apr 2026104 Woodstock Road Chiswick W4 1EG
Received 7 Apr 2026River Brent Business Park, Unit 8 Trumpers Way Hanwell W7 2QA
Received 13 Apr 2026Unit 1, Victoria Industrial Estate Victoria Road Acton W3 6UU
Received 13 Apr 202618 Jessamine Road Hanwell W7 3SQ
Received 13 Apr 202679 Monks Drive Acton W3 0ED
Received 13 Apr 20261 Vale Lane Acton W3 0DY
Received 13 Apr 2026142 Churchfield Road Acton W3 6BS
Received 9 Apr 2026142 Churchfield Road Acton W3 6BS
Received 9 Apr 202633 Kent Road Chiswick W4 5EY
Received 14 Apr 202633 Kent Road Chiswick W4 5EY
Received 14 Apr 202655 Ramillies Road Chiswick W4 1JW
Received 14 Apr 20268 Rayners Crescent Northolt UB5 6PB
Received 14 Apr 20261 Gemini Grove Northolt UB5 6ER
Received 14 Apr 20265 Brentwater Terrace Westminster Road Hanwell W7 3FH
Received 14 Apr 202635 Stuart Road Acton W3 6DG
Received 10 Apr 202641 Gordon Road Southall UB2 5QE
Received 14 Apr 20261 Madge Hill Church Road Hanwell W7 3BW
Received 14 Apr 202610 Amherst Road West Ealing W13 8ND
Received 14 Apr 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage