Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
England · Local authority
Explore collected planning applications and decisions for London Borough of Ealing. Search an address, application reference or proposal to find a record.
4,098 approved · 717 refused · 160 withdrawn. Received dates in our records: 18 Jan 2019 to 12 Oct 2026. Most recent record check: 13 Oct 2026. Counts reflect the last collected status; some records may be out of date.
Contact details were found on council pages. Check the source for opening hours and which enquiries the service handles.
Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.
Interactive planning map loads with JavaScript. Dataset sources are linked below.
Download Article 4 coverage for all authorities (CSV)
Data downloaded 14 Sept 2026. Display boundaries are simplified and indicative. Map record counts are not a complete count of designations or directions.
Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.
1 Woodville Road Ealing W5 2SE
Received 14 Apr 2026Fleming Road / Whitecote Road Golf Links Estate Southall UB1 3NR
Received 14 Apr 2026113B The Avenue West Ealing W13 8JT
Received 14 Apr 202652 Court Way Acton W3 0PZ
Received 14 Apr 2026Apex Court 22 Sutherland Road West Ealing W13 0DU
Received 14 Apr 2026149 Framfield Road Hanwell W7 1NQ
Received 14 Apr 2026120 Salisbury Road West Ealing W13 9TT
Received 14 Apr 202676 Eccleston Road West Ealing W13 0RL
Received 14 Apr 202613 Julien Road Ealing W5 4XA
Received 15 Apr 2026Flat 1 100 Orchard Gate Greenford UB6 0QP
Received 15 Apr 2026174 Carlyle Road Ealing W5 4BJ
Received 15 Apr 2026100 Flat 2 Orchard Gate Greenford UB6 0QP
Received 15 Apr 202611 Costons Avenue Greenford UB6 8RJ
Received 15 Apr 2026Kings Hall Methodist Church South Road Southall UB1 1RB
Received 15 Apr 2026324 Uxbridge Road Acton W3 9QP
Received 14 Apr 2026Gunnersbury Court Bollo Lane Acton W3 8JN
Received 10 Apr 2026Unit 1 And 4A Silicon Business Centre, 26 Wadsworth Road Perivale UB6 7JZ
Received 15 Apr 2026122 St Dunstans Avenue Acton W3 6QL
Received 15 Apr 202647 Ranelagh Road Southall UB1 1DJ
Received 15 Apr 2026Visram House 250 Acton Lane London NW10 7GF
Received 15 Apr 202617 Manaton Crescent Southall UB1 2SY
Received 15 Apr 202633 Grange Park Ealing W5 3PP
Received 15 Apr 2026The Duke Of Sussex 75 South Parade Chiswick W4 5LF
Received 15 Apr 2026The Duke Of Sussex 75 South Parade Chiswick W4 5LF
Received 15 Apr 2026Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.
View all applicationsStart with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.
How to search planning applications
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

Property research · 13 min read
Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.
These figures describe applications collected by PlanningTrack for London Borough of Ealing, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.
The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.
Check collection coverage