Collected records · All available dates
8,274Searchable applications
15Recorded as pending
97%Approval rate · 7,044 approved or refused records
214Refused applications

6,830 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 15 Oct 2026. Most recent record check: 19 Oct 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Application WithdrawnESS/02/22/BTE

    Continuation of development of Integrated Waste Management Facility without compliance with condition 68 (Refurbishment of Woodhouse Farm Complex) of ESS/39/23/BTE to allow additional time to complete refurbishment works. ESS/39/23/BTE is an amended planning permission for “The Integrated Waste Management Facility comprising: Anaerobic Digestion Plant treating mixed organic waste, producing biogas converted to electricity through biogas generators; Materials Recovery Facility for mixed dry recyclable waste to recover materials e.g. paper, plastic, metals; Mechanical Biological Treatment facility for the treatment of residual municipal and residual commercial and industrial wastes to produce a solid recovered fuel; De-inking and Pulping Paper Recycling Facility to reclaim paper; Combined Heat and Power Plant (CHP) utilising solid recovered fuel to produce electricity, heat and steam; extraction of minerals to enable buildings to be partially sunken below ground level within the resulting void; visitor/education centre; extension to existing access road; provision of offices and vehicle parking; and associated engineering works and storage tanks.”

    Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF

    Received 5 Jan 2022
  2. Decision MadeESS/69/19/BTE/6/1

    Noise monitoring pursuant to Condition 6 of planning application ref: ESS/69/19/BTE (Continued operation of anaerobic digestion plant)

    Halstead Anaerobic Digestion Facility, Land north of Bluebridge Industrial Estate, Halstead, Essex

    Received 9 Oct 2020
  3. Decision MadeCC/BRW/58/02

    Single storey extension expanding offices & admin facilities

    Hogarth County Primary School,Riseway,Ingrave Road,Brentwood,CM15 8BG

    Received 18 Apr 2002
  4. Decision MadeESS/57/04/TEN/15/2

    Noise levels shall be monitored by the operator at six monthly intervals from the date of the commencement of development at 5 noise sensitive locations to be approved in writing with the Mineral Planning Authority. The monitoring survey shall be for a minimum of two separate 15 minute periods at each location during all permitted operations and should avoid meal breaks and periods of plant breakdown. The frequency and duration of such monitoring may be modified at the discretion of the Mineral Planning Authority. The monitoring may be required more frequently where it becomes necessary to demonstrate continuing compliance with the limiting noise levels specified above, or less frequently where the need does not arise. Monitoring should only be undertaken in calm weather conditions or at receptors with a component of wind blowing from the site. Monitoring should generally be avoided in conditions of wind speeds greater than 5m/sec average; rain; low temperatures (<3 degrees C). All noise measurements taken shall be made no closer than 3.5 metres from the façade of properties or other reflective surface and have regard to the effects of extraneous noise and shall be corrected for any such effects. The monitoring shall include the LAeq,1 hour dB noise levels both with and without the permitted operations, the prevailing weather conditions, details of the measurement equipment used and its calibration and comments on the sources of noise which control the noise climate. The results shall be kept by the operating company during the life of the permitted operations and a copy shall be supplied to the Mineral Planning Authority

    Crown Quarry (Ardleigh Reservoir Extension)

    Received 7 Nov 2011
  5. Decision MadeCC/CHL/55/26/SO

    Demolition of the former Chetwood Primary School and the construction of a two-storey SEND School including PV panels, MUGA and sports pitch with associated community facilities, outdoor play areas, car parking area, landscaping and associated works.

    Former Chetwood Primary School site, Shirebourn Vale, South Woodham Ferrers, Chelmsford, CM3 5ZX

    Received 28 Jul 2026
  6. Decision MadeESS/46/08/UTT/31/1

    Continuation of mineral extraction and development of waste recycling and composting facility, including demolition of existing mineral processing plant, construction of waste reception and sorting building enclosing sorting of domestic and commercial and industrial waste to recover recyclables, construction of in-vessel composting units for composting of sorted waste, reprofiling of levels of restored landfill site utilising on site materials, with restoration to parkland,

    Crumps Farm,Stortford Rd,Little Canfield,Great Dunmow,CM6 1SR

    Received 12 Oct 2012
  7. Decision MadeESS/02/11/EPF

    The continuation of development permitted by planning permission Ref. IDO/EPF/4/92 for Working of sand and gravel and infilling without compliance with Condition 23 (Restoration and Landscaping) to allow a revised restoration scheme to be implemented

    Nazeing Quarry,Green Lane,Nazeing,Waltham Abbey,EN10 6TD

    Received 24 Dec 2010
  8. Decision MadeESS/22/17/MAL

    Continuation of the construction of an agricultural reservoir by the extraction and removal from the site of sand, gravel and surplus soils without compliance with condition 3 (Cessation of development by 20th May 2017), 4 (Removal of infrastructure by 20th May 2017) and 39 (Restoration of Wash Lane crossing by 20th May 2017) attached to permission ref ESS/05/16/MAL to allow an extension of time for completion of extraction of sand and gravel and site restoration by 20th May 2019

    Cobbs Farm, Maldon Road, Goldhanger, Maldon, CM9 8BQ

    Received 2 Feb 2017
  9. Decision MadeESS/89/97/BRW

    Remove #5 of ESS/13/97/BRW to allow shredding green waste on Site

    Stondon Hall Farm,Heatherland Composting,Stondon Hall Farm,Stondon Massey,Ongar,CM15 0LD

    Received 23 Dec 1997
  10. Decision MadeCC/BAS/04/91

    Hovefields Site, Courtauld Road, Basildon

    Received 1 Sept 1991
  11. Decision MadeESS/29/26/CHL/SO

    Continuation of development of “Winning and working of sand and gravel, the erection of a processing plant and ready mix concrete and mortar plants, workshop and weighbridge and office.” permitted by ESS/147/20/BTE without compliance with conditions: Condition 2 (Application details) and Condition 4 (timescales for completion of mineral extraction and restoration) made under Section 73.

    Bulls Lodge Quarry (Park Farm & Brick Farm), Generals Lane, Boreham, Chelmsford, CM3 3HR

    Received 20 Apr 2026
  12. Decision MadeESS/32/18/TEN/16/1

    Details pursuant to Condition 16 (Noise Monitoring) of planning permission ESS/32/18/TEN that was for the "Installation and use of a washing plant for the recycling of non-hazardous and inert wastes, the use of a crusher, the installation of a weighbridge office and relocation of a weighbridge together with associated access onto the highway

    Martells Quarry, Slough Lane, Ardleigh, Essex, CO7 7RU

    Received 28 Oct 2019
  13. Decision MadeESS/18/12/UTT/17/1

    Change of Use of land to a Waste Transfer Station to include the erection of a building for transfer/bulking of municipal and trade waste, together with ancillary development including dual weighbridge, office, staff welfare building, firewater holding tanks and pump-house, underground surface water drainage tanks and pipework, package sewage treatment plant and pipework, vehicle wash system, staff car and cycle parking, vehicle hardstanding, fencing, improvements to the access road off Chelmsford Road and associated works

    Ambulance Station, Chelmsford Road, Dunmow, CM6 1LW

    Received 12 Mar 2013
  14. Decision MadeESS/34/15/BTE/54/02

    Details pursuant to condition 54 (Habitat Management Plan Monitoring Report 2015 to 2023) of ESS/34/15/BTE. ESS/34/15/BTE is a variation planning permission for the Integrated Waste Management Facility

    Rivenhall Airfield, Coggeshall Road (A120), Braintree, CO5 9DF

    Received 17 Oct 2023
  15. Decision MadeESS/46/04/COL/SO

    Screening Opinion: Proposed relocation of existing inert recycling facility

    Colchester Quarry (Stanway Hall),Warren Lane,Stanway,Colchester,CO3 0NN

    Received 25 Aug 2004
  16. Decision MadeESS/45/18/COL/55/1

    Details pursuant to Conditions 6 (Ecology); 21 (Noise); 51 (Restoration); 52 (Landscaping); 54 (Landscaping) and 55 (Amenity Aftercare) of Planning permission ESS/45/18/COL that was for the Continuation of use of land for mineral extraction and ancillary use without compliance with Conditions. Land at Birch Pit, Maldon Road, Birch

    Birch Pit, Roundbush Corner, Maldon Road, Colchester, Layer Marney, CO5 9XE

    Received 9 Feb 2024
  17. Decision MadeESS/46/19/CHL/SPO

    EIA Scoping Opinion for a new sand and gravel quarry

    Land south of A1060 (Salt’s Green), Chalk End, Chelmsford (northern part of MLP Allocation A40: Shellow Cross Farm)

    Received 4 Jul 2019
  18. Decision MadeCC/TEN/27/14

    Demolition of the existing school buildings and the construction of a new replacement school building, 2-storeys in height, suitable for up to 200 pupils/children with varying degrees of special educational needs. The proposal includes new external landscaped areas for staff and visitor car parking, controlled pupil drop-off zone, multi-use games area (MUGA) and hard and soft landscaping, adapting and utilising the existing school entrance on School Road

    Market Field School, School Road, Elmstead, Colchester, CO7 7ET

    Received 1 May 2014
  19. Decision MadeCC/CHL/85/21/01/01

    Details pursuant to condition 1 (Notification of Commencement) of CC/CHL/85/21. CC/CHL/85/21 was for “Chelmsford North East Bypass (CNEB): A single carriageway road between Roundabout 4 of the Beaulieu Park Radial Distributor Road (RDR1) and a new roundabout on the A131 at Chatham Green plus dualling of the existing A131 between Chatham Green and Deres Bridge roundabout. With one intermediate roundabout, 3 road overbridges and 1 pedestrian/cycle/horse overbridge. Together with other associated works and landscaping.”

    Land between Beaulieu Park (north of Generals Lane), Boreham Parish, and Deres Bridge Roundabout on A131, Great & Little Leighs Parish, to the north east of Chelmsford.

    Received 12 Sept 2022
  20. Decision MadeCC/HLW/01/16

    Construction of a single storey extension to provide a new classroom, nursery, library and group room. The provision of an additional 8 car parking spaces within the school site and the provision of an additional 12 cycle spaces and 12 scooter spaces

    Longwood Primary School & Nursery, Paringdon Road, Harlow, CM187RQ

    Received 23 Dec 2015
  21. Decision MadeCC/CPT/149/07

    3 solar shading canopies attached to classbases to reduce solar gain

    Leigh Beck County Junior and Infant Schools & Nursery,Point Road,Canvey,SS8 7TD

    Received 18 Oct 2007
  22. Decision MadeESS/18/12/UTT/1/1

    Change of use of land to a Waste Transfer Station to include the erection of a building for transfer/bulking of municipal and trade waste, together with ancillary development including dual weighbridge, office, staff welfare building, firewater holding tanks and pumphouse, underground surface water drainage tanks and pipework, package sewage treatment plant and pipework, vehicle wash system, staff car and cycle parking, vehicle hardstanding, fencing, improvements to the access road off Chelmsford Road and associated works.

    Ambulance Station, Chelmsford Road, Dunmow, CM6 1LW

    Received 1 Dec 2014
  23. Decision MadeESS/34/15/BTE/NMA7

    Non Material Amendment to planning permission ESS/34/15/BTE (Integrated Waste Management Facility) to allow amended layout drawings for the car park and associated lighting and landscaping.

    Land at Rivenhall Airfield, Coggeshall Road, Braintree, CO5 9DF

    Received 18 Sept 2023
  24. Decision MadeCC/COL/24/07

    Infill of existing internal courtyard to provide standalone IT and Library facilities, and circulation corridor

    Montgomery CIS,Baronswood Way,Colchester,CO2 9QG

    Received 12 Feb 2007

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage