England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 29 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeCC/BTE/36/19

    The continued use of a classbase for a temporary period until 31 August 2024 without compliance with condition 2 (time limit) attached to planning permission CC/BTE/05/14.

    St Peter's Church Of England Primary School, Myneer Park, Coggeshall, CO6 1YU

    Received 3 Jun 2019
  2. Decision MadeESS/28/02/COL

    I) Laboratory Facility. ii) Replacement Office & Training Room. iii) Replacement & Relocation of Storage Rooms.

    Bellhouse & Abbotstone Landfill Site,Warren Lane,Stanway,Colchester,CO3 0NN

    Received 14 May 2002
  3. Decision MadeESS/18/17/COL

    Continuation of use of waste recycling facility (as amended by planning permission ESS/29/16/COL) without compliance with Condition 3 (Operating hours) to allow dust carts to operate from the site on Good Friday April 14th 2017 between the hours of 06;00 – 16:30 and Condition 4 (HGV movement times) to allow 24 movements on Good Friday 14th April 2017.

    Land at Greenacres, Packards Lane, Wormingford

    Received 27 Feb 2017
  4. Decision MadeESS/45/08/UTT

    Continuation of restoration works without compliance with conditions 2 and 3 (time limits) of ESS/45/07/UTT to allow completion of restoration works of the landfill site by 31 Oct 2009

    Crumps Farm,Stortford Rd,Little Canfield,Great Dunmow,CM6 1SR

    Received 3 Oct 2008
  5. Decision MadeCC/BAS/28/19/9/1

    Details pursuant to Condition 9 – Biodiversity Enhancement Strategy for planning application ref: CC/BAS/28/19 (Upgrade works to the A127/A130 Fairglen Interchange including the creation of a new link road between A130 and A127)

    A127/A130 Fairglen Interchange

    Received 20 Dec 2020
  6. Decision MadeCC/BTE/167/06

    Erection of canopies to covered play areas

    White Court County Primary School,Ennerdale Avenue,London Road,Braintree,CM777UE

    Received 11 Dec 2006
  7. Decision MadeCC/CHL/52/24

    The creation of a flood attenuation basin, associated minor works with temporary construction access via Homeholly House car park on land to the north of Church End Lane, Runwell

    Area of Open Space north of Church End Lane, Runwell, SS11 7DS

    Received 4 Sept 2024
  8. Decision MadeESS/35/00/CHL

    Replacement of existing sand screening plant with proposed mortar plant

    Land at St Cleres Hall Farm,St Clere’s Hall Pit,Main Road,Danbury,Chelmsford,CM3 4AR

    Received 24 Jul 2000
  9. Decision MadeESS/45/18/COL/21/2

    Details pursuant to Condition 21 (Noise) of Planning permission ESS/45/18/COL that was for the Continuation of use of land for mineral extraction and ancillary use without compliance with Conditions. Land at Birch Pit, Maldon Road, Birch

    Birch Pit, Roundbush Corner, Maldon Road, Colchester, Layer Marney, CO5 9XE

    Received 7 Apr 2025
  10. Decision MadeESS/101/21/TEN/15/1

    Details pursuant to condition 15 (arboricultural impact assessment) of planning permission ref: ESS/101/21/TEN (Construction of an agricultural reservoir involving the extraction and exportation of sand and gravel; and the erection and use of an on-site processing plant with ancillary facilities. Together with the use of the access, on Great Bentley Road, currently only permitted for a temporary period as part of planning application ref: ESS/40/15/TEN and changes to the timescale of the proposed phasing and restoration of the existing reservoir as permitted as part of planning application ref: ESS/99/21/TEN)

    Lufkins Farm, Great Bentley Road, Frating, CO7 7HN

    Received 8 Apr 2024
  11. Decision MadeESS/47/10/ROC/39/1

    Revise the pre-settlement contours of the existing landfill operation through the importation of non-hazardous waste, with associated extension in time requiring all operations to have ceased and the site to be restored by 31 December 2016 The application also provides for open windrow composting of green waste to take place at the site, with the product used for soil improvement at the siteand revision of localised post settlement contours, including the infilling of a pond

    Barling Marsh Quarry and Landfill Site,Mucking Hall Road,Barling Magna,Rochford,SS3 0NR

    Received 9 Jun 2017
  12. Decision MadeEPR/115/53

    Extraction Sand & Gravel from land at Nazeing

    New Broxbourne Road,Nazeing,Waltham Abbey,EN10 6RW

    Received 10 Jul 1953
  13. Decision MadeCC/HLW/60/15

    Single storey extension of school building to provide 4 classrooms and associated facilities, library, staff room, group room and store

    Pear Tree Mead Primary School, Trotters Road, Harlow, CM18 7BY

    Received 16 Oct 2015
  14. Decision MadeCC/BAS/66/15

    Construction of a single storey flat roof extension and internal alterations to form a nursery facility. The provision of an additional 5 car parking spaces, including 1 disabled car parking space

    Merrylands Primary School, Cumberland Drive, Laindon, Essex, SS15 6QS

    Received 10 Nov 2015
  15. Decision MadeESS/52/17/COL/28/15

    Details pursuant to Condition 14 (Noise Monitoring Survey) of ESS/03/22/COL that was for "Review of Mineral Planning Permissions” and Condition 28 (Noise Monitoring Survey) of ESS/52/17/COL that was for "Continuation of use of land for mineral extraction and ancillary use without compliance with Condition 6 (Dry Silo Mortar Plant Operating hours) of planning permission ESS/23/14/COL granted for "Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel etc" to extend the weekday DSM plant operational hours from 20:00 hours to 22:00 hours.

    Land at Colchester Quarry, Warren Lane, Stanway, Colchester, Essex, CO3 0NN

    Received 2 Apr 2025
  16. Decision MadeCC/EPF/75/09

    The demolition of the existing infant school and its replacement with a 420 place primary school approved under planning permission CC/EPF/55/07 without compliance with Condition 2 (details approved for car parking, bin stores, cycle stores, boundary fencing and other elevational details) and Condition 12 (deletion of separate pedestrian access along south west boundary)

    Epping Primary School,Coronation Hill,Epping,CM16 5DU

    Received 6 Aug 2009
  17. Decision MadeESX/21/92/CHL

    Ext S&G,Restore to Ag. Rem #23 CHL/14/84

    Sandon Quarry,Sandon Quarry,Southend Road,Chelmsford,CM2 7TE

    Received 5 May 1992
  18. Application WithdrawnCC/CPT/122/07

    The continued use of 1 triple relocatable classroom & 1 single relocatable classroom until 31 Aug 2009 without complying with Cond1 (time limit) attached to CC/CPT/87/02

    Canvey Junior & Infants School,Hawkesbury Road,Canvey,SS8 0DG

    Received 28 Aug 2007
  19. Decision MadeCC/CPT/125/06

    To increase the width of the hard play area at the front of the site, and to create an area for overflow car parking by laying a reinforced grass surface

    Canvey Junior & Infants School,Hawkesbury Road,Canvey,SS8 0DG

    Received 15 Aug 2006
  20. Decision MadeESS/52/17/COL/28/17

    Details pursuant to Condition 28 (Noise Monitoring Survey) of ESS/52/17/COL that was for "Continuation of use of land for mineral extraction and ancillary use without compliance with Condition 6 (Dry Silo Mortar Plant Operating hours) of planning permission ESS/23/14/COL granted for "Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel etc" to extend the weekday DSM plant operational hours from 20:00 hours to 22:00 hours

    Land at Colchester Quarry, Warren Lane, Stanway, Colchester, Essex, CO3 0NN

    Received 18 Mar 2026
  21. Decision MadeESS/49/07/UTT/6/3

    Noise Monitoring

    Widdington Pit, Hollow Road, Widdington, Saffon Walden, CM11 3SL

    Received 3 Jul 2013
  22. Decision MadeCC/CHL/134/05

    Replacement of temporary accommodation with a 2 storey building

    Moulsham High, Junior & Infant School,Brian Close,Chelmsford,CM2 9ES

    Received 3 Oct 2005
  23. Decision MadeCC/BTE/26/03

    Installation of single temporary classbase with service connections, access ramp, steps and access path

    Notley Green County Primary School,Blickling Road,Great Notley,Braintree,CM7 7LJ

    Received 1 Apr 2003
  24. Decision MadeESS/60/01/EPF

    Variation of Condition 16 (ESS/34/96/EPF) to allow a time extension to the landfilling operations until 31December 2003

    Former Leca Works,Ongar Landfill Site,Mill Lane,Ongar,CM5 9RG

    Received 3 Dec 2001

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage