England · County council

Essex planning applications

PlanningTrack collects planning applications and decisions from the public planning register of Essex County Council. Search an address, application reference or proposal. Official Essex website

Collected application statistics

Collected records · All available dates
8,298Searchable applications
17Recorded as pending
97%Approval rate · 7,064 approved or refused records
214Refused applications

6,850 approved · 214 refused · 438 withdrawn. Received dates in our records: 12 Dec 1938 to 25 Nov 2026. Most recent record check: 28 Nov 2026. Counts reflect the last collected status; some records may be out of date.

Local planning information

Council sources checked 14 Sept 2026

Conservation areas and Article 4 directions

Explore published planning boundaries and follow their source records for designation details. Coverage varies: an empty map does not mean there are no restrictions. Check the council’s current maps and documents before relying on a boundary.

Conservation areasNo boundary records available in this collection
Article 4 direction areasNo boundary records available in this collection

A boundary map is not available for this authority yet. Use council conservation-area and Article 4 guidance above where linked.

Download Article 4 coverage for all authorities (CSV)

Sources: Planning Data conservation areas and Article 4 direction areas. Contains public sector information licensed under the Open Government Licence v3.0.

More application records

  1. Decision MadeESS/80/20/TEN/SO1

    UPDATED SCREENING OPINION TO INCLUDE PERMANENT RETENTION OF ACCESS ONTO ALRESFORD ROAD: Screening Opinion for continuation of quarry restoration to part agriculture, part nature conservation and part open water, without compliance with conditions 1 (approved plans), 44 (landscape scheme), 49 (completion by 30th June 2020), 50 (restoration by 30th June 2020) and 53 (Construction Environment Management Plan) attached to planning permission ref ESS/43/19/TEN to allow for an extension of time to complete restoration and for the permanent retention of the access onto Alresford Road.

    Wivenhoe Quarry, Alresford Road, Wivenhoe, Essex, CO7 9JU

    Received 30 Nov 2020
  2. Decision MadeESS/13/96/BRW

    Green waste Compost Site, Bagging Barn.

    Heatherland Ltd, Stondon Hall Farm,Heatherland Composting,Stondon Hall Farm,Stondon Massey,Ongar,CM15 0LD

    Received 6 Mar 1996
  3. Decision MadeCC/HLW/139/02

    Proposed variation of condition 1 (time limit) attached to approved application CC/HLW/12/97 to allow the retention of one double relocatable classbase until 11 September 2005

    Mark Hall School,First Avenue,Harlow,CM17 9LR

    Received 21 Aug 2002
  4. Decision MadeESS/03/22/COL/14/4

    Details pursuant to Condition 14 (Noise Monitoring Survey) of ESS/03/22/COL that was for "Review of Mineral Planning Permissions” and Condition 28 (Noise Monitoring Survey) of ESS/52/17/COL that was for "Continuation of use of land for mineral extraction and ancillary use without compliance with Condition 6 (Dry Silo Mortar Plant Operating hours) of planning permission ESS/23/14/COL granted for "Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel etc" to extend the weekday DSM plant operational hours from 20:00 hours to 22:00 hours.

    Land at Colchester Quarry, Warren Lane, Stanway, Colchester, Essex, CO3 0NN

    Received 3 Sept 2025
  5. Decision MadeESS/23/14/COL/11/1

    Extension of Stanway Quarry on land at Five Ways Fruit Farm (FWFF) via the extraction of 2.95m tonnes of sand and gravel; extraction of remaining 0.5m tonnes of sand and gravel from Stanway Quarry; processing of remaining 1.5m tonnes of sand and gravel from Bellhouse Quarry to be imported via the existing conveyor link to Stanway Quarry by 31 October 2026 (amended via condition to tie in with the timescales permitted under ref ESS/07/01/COL/REV); retention of the existing sand and gravel processing plant, Dry Silo Mortar Plant, concrete plant, access roads, weighbridge and related infrastructure until 31 October 2026; retention of the existing inert recycling operation and associated mobile plant parking area until 31 December 2037; restoration of FWFF area using existing indigenous soils, clay and soil forming material from within the application site within 7 years of commencement of operations at FWFF; importation of approximately 2.35m cubic metres of inert waste material for the restoration of the central / eastern Stanway Quarry void by 31 December 2037; and implementation of a comprehensive restoration scheme for the application site comprising agricultural land, orchard, woodland, grassland, lakes, habitat creation and informal public access via permissive routes

    Stanway Quarry and Five Ways Fruit Farm, Warren Lane, Colchester, Stanway, CO3 0NN

    Received 20 May 2015
  6. Decision MadeESS/03/26/BRW/SO

    Screening Opinion: Retrospective change of use of land and buildings to an inert waste recycling facility including the importation, processing and storage of inert waste

    Place Farm, Place Farm Lane, Doddinghurst, Essex, CM15 0JA

    Received 28 Jan 2026
  7. Decision MadeCC/BTE/10/98

    Provision of Portakabin for office use

    Halstead Highways Depot,Fenn Road,Halstead,CO9 2HG

    Received 16 Feb 1998
  8. Decision MadeCC/CPT/72/10

    Continuation of redevelopment of the existing Cornelius Vermuyden School site without compliance with Condition 6 (flood proofing levels) and Condition 7 (minimum flood proofing levels) attached to outline approval reference CC/CPT/75/08 to allow the retained school building and new dining hall to be 1.87 metres AOD

    The Cornelius Vermuyden School,Dinant Avenue,Canvey,SS8 9SQ

    Received 15 Jun 2010
  9. Decision MadeESS/04/16/UTT/23/1

    Details pursuant to Condition 23 – Fixed lighting for planning application ref: ESS/04/16/UTT (Continuation of use of land for skip hire, waste recycling, waste transfer and green waste composting)

    Widdington Pit, Hollow Road, Widdington, CB11 3SL

    Received 20 Nov 2018
  10. Decision MadeESS/48/06/ROC/SO

    Screening Opinion: land remediation by importation of approximately 100,000 cubic metres of clay/overburden from adjacent quarry

    Barling Marsh Quarry and Landfill Site,Mucking Hall Road,Barling Magna,Rochford,SS3 0NR

    Received 27 Sept 2006
  11. Decision MadeESS/15/17/UTT/SO

    Installation of a NEREDA treatment facility, including new inlet works, tertiary treatment and additional storm storage capacity

    Great Dunmow Water Recycling Centre, Chelmsford Road, CM6 1LL

    Received 10 Feb 2017
  12. Decision MadeCC/UTT/01/98

    Continued use of 1 x RL4T Relocatable Classroom Unit

    Stebbing County Primary School,High Street,Stebbing,Dunmow,CM6 3SH

    Received 16 Jan 1998
  13. Decision MadeCC/BTE/35/24/11/01

    Details pursuant to Condition 11 (Lighting) - CC/BTE/35/24: Single storey classroom block and single storey kitchen extension together with PV panels, additional car and cycle parking, new pedestrian entrance on the southern boundary and a change of use of land to educational use to develop a new playing field to the west, with associated ancillary works.

    Cressing Primary School Braintree Road Cressing Essex CM77 8JE

    Received 19 Jun 2026
  14. Considering Consultation Responses/Report being PreparedESS/16/24/UTT

    Hybrid planning application comprising: (i) full planning permission for the remediation and restoration of the former Crumps Farm landfill, the regularisation and re-profiling of previously deposited materials/waste on the southern part of the site and the installation of additional landfill infrastructure; and (ii) outline planning permission, with all matters reserved except access, for the development of the eastern part of the site as a data centre (sui generis) or for general industrial (B2) purposes and for a ground-mounted solar array on the southern part of the site - REVISED DESCRIPTION, ENVIRONMENTAL STATEMENT AND APPLICATION PARTICULARS

    Crumps Farm, Stortford Road, Little Canfield, Essex, CM6 1SR

    Received 4 Mar 2024
  15. Decision MadeESS/01/18/CHL/NMA3

    Non material amendment to planning application ref: ESS/01/18/CHL (Construction of an agricultural reservoir) seeking revised weighbridge details

    Land at Sheepcotes Farm, Sheepcotes Lane, Little Waltham, CM3 3LU

    Received 5 Aug 2025
  16. Decision MadeCC/EPF/45/10

    The construction of a single storey extension measuring 3.35m in height, 7.5m in length and 7.75m in width to the south west of Alderton Infant School to provide new toilet facilities and improved accessibility to and use of the school dining rooms

    Alderton Junior and Infant School,Alderton Hall Lane,Loughton,IG10 3HE

    Received 11 Mar 2010
  17. Decision MadeESS/36/94/TEN

    Infilling with surplus material from Lt Clacton by-pass & Construction of screen bund

    Bovills Farm, Lt Clacton,Bovills Hall Farm,St.Osyth Road,Lt Clacton,Clacton-on-Sea,CO16 9DJ

    Received 15 Jun 1994
  18. Decision MadeCC/CPT/21/24/01/01

    Details pursuant to Condition 1 (Notification of Commencement) – CC/CPT/21/24: Erection of a new freestanding single-storey sixth form building, together with associated access, parking and landscaping works and new security fencing.

    Glenwood School, Rushbottom Lane, Thundersley, Benfleet, Essex, SS7 4LW

    Received 21 May 2025
  19. Decision MadeESS/17/11/BTE/SPO

    Extraction of an estimated reserve of 1 Million tonnes of sand and gravel (750,000 tonnes of which is allocated as a windfall within ECC’s mineral landbank) within area known as Site A2 (south Rivenhall Airfield and east of Sheepcotes Lane), including retention of existing access onto the A120, private haul road, sand and gravel processing plant, ready mixed concrete plant, bagging plant, dry silo mortarplant and water management system, internal haul roads, recontouring of existing

    Coggeshall Road, Bradwell, Near Braintree,Bradwell Quarry,Coggeshall Road,Bradwell,Braintree,CM77 8EP

    Received 21 Mar 2011
  20. Decision MadeCC/TEN/171/02

    Proposed variation of condition 2 attached to approved application CC/TEN/75/01 to provide screening to air handling plant on kitchen roof

    Bradfield County Primary School,Heath Rd,Bradfield,Manningtree,CO11 2UZ

    Received 24 Oct 2002
  21. Decision MadeESS/82/19/BTE

    Certificate of Lawfulness for the use of the land edged red on drawing Site Location Plan K153.1~20~002 as an non-hazardous and inert waste recycling facility to include the importation of inert waste, the sorting and treatment of inert waste materials to recover aggerates, hardcore, soils, through manual sorting and separation and the use of crushers and a screeners. The export of recovered materials, including aggregates, hardcore, soils and the export of residual waste. The said use shall not take place outside the hours of Monday to Friday 7am to 6pm. In addition, maintenance and repairs associated with the said use shall not take place outside the hours of Monday to Friday 7 am to 6 pm and only maintenance will occur on a Saturday 7am to 12:30pm.

    Ferriers Farm Pit, Ferriers Lane, Bures Hamlet, CO8 5DL

    Received 27 Sept 2019
  22. Decision MadeESS/10/16/UTT

    Construction of a new welfare building (17.2m x 10.4m x 5.35m LxWxH)

    Sewage Works, Jenkins Lane, Great Hallingbury, CM22 7QL

    Received 16 Feb 2016
  23. ValidatedCC/COL/17/99

    Demolition to fire damaged former toilet block

    Wilson Marriage Centre.,Barrack Street,Colchester,CO1 2LR

    Received 12 Mar 1999
  24. Decision MadeESS/38/02/BTE

    Construction of GRP Kiosks to house Electrical Control Equipment for the Treatment Plant

    Rayne WwTW,Rayne Hall Lane,Rayne,Braintree

    Received 24 Jul 2002

Records are ordered by application ID, not submission date. Use search to find a particular address or proposal.

View all applications

Get emailed about new planning applications in Essex

Area alerts send a daily or weekly email with new applications and decisions near a postcode, filtered by project type. £29 a month, up to 3 areas. Records are limited to the councils we collect.

Set up an area alert

Researching a proposal in Essex County Council

Start with the address or application reference. Open a record to read the proposal, dates and available documents, then check the official register for the latest plans and consultation details. If nothing appears, check coverage before treating the result as a complete planning history.

How to search planning applications

Guides to planning records

All planning guides
  • Understanding planning · 13 min read

    Planning application documents: what to read first

    Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.

  • Understanding planning · 13 min read

    Planning permission drawings: how to read plans

    Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.

  • Property research · 13 min read

    Planning approval rates: how to read council statistics

    Understand planning approval rates with an interactive calculator, worked examples and comparison table. Check sample sizes, outcomes and coverage before comparing.

What these statistics cover

These figures describe applications collected by PlanningTrack for Essex County Council, across all dates currently available. They are a partial dataset, rather than an authority-wide performance measure. The date range does not establish continuous historical coverage.

The approval percentage is approved records divided by approved plus refused records. Pending, withdrawn and unknown outcomes are excluded. No percentage is shown until there is an approved or refused record.

Check collection coverage