Understanding planning · 13 min read
Planning application documents: what to read first
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Council planning record
Crumps Farm, Stortford Road, Little Canfield, Essex, CM6 1SR
Last published check: 12 Oct 2026, 23:12. Check the council record for more recent changes.
Council milestones and published deadlines. A deadline passing does not confirm a decision.
A published target or deadline. It does not confirm an outcome.
Council sourceHybrid planning application comprising: (i) full planning permission for the remediation and restoration of the former Crumps Farm landfill, the regularisation and re-profiling of previously deposited materials/waste on the southern part of the site and the installation of additional landfill infrastructure; and (ii) outline planning permission, with all matters reserved except access, for the development of the eastern part of the site as a data centre (sui generis) or for general industrial (B2) purposes and for a ground-mounted solar array on the southern part of the site - REVISED DESCRIPTION, ENVIRONMENTAL STATEMENT AND APPLICATION PARTICULARS
Sign in to view all collected council fields and recorded changes.
Sign in to view collected detailsCrumps Farm, Stortford Road, Little Canfield, Essex, CM6 1SR
This record has no verified map location.
| Document | Published | Action |
|---|---|---|
| Application FormApplication Form | 11 Jun 2025 | View |
| Application Form amendmentsApplication Form amendments | 14 Aug 2026 | View |
| Covering letter to amended applicationCovering letter to amended application | 14 Aug 2026 | View |
| Planning StatementPlanning Statement | 14 Aug 2026 | View |
| Design & Access StatementDesign & Access Statement | 14 Aug 2026 | View |
| Noise Impact AssessmentNoise Impact Assessment | 14 Aug 2026 | View |
| Air Quality AssessmentAir Quality Assessment | 14 Aug 2026 | View |
| Dust and Odour Management PlanDust and Odour Management Plan | 14 Aug 2026 | View |
| Energy and Utilities StatementEnergy and Utilities Statement | 14 Aug 2026 | View |
| Grid Connection Strategy and Phasing NoteGrid Connection Strategy and Phasing Note | 14 Aug 2026 | View |
| Viability AppraisalViability Appraisal | 14 Aug 2026 | View |
| Viability ModelViability Model | 14 Aug 2026 | View |
| Preliminary Ecological AppraisalPreliminary Ecological Appraisal | 14 Aug 2026 | View |
| BNG Metric - Update ScheduleBNG Metric - Update Schedule | 14 Aug 2026 | View |
| BNG Feasibility AssessmentBNG Feasibility Assessment | 14 Aug 2026 | View |
| Flood Risk AssessmentFlood Risk Assessment | 14 Aug 2026 | View |
| Foul Drainage StrategyFoul Drainage Strategy | 14 Aug 2026 | View |
| Surface Water Discharge Rates and Attenuation - Technical NoteSurface Water Discharge Rates and Attenuation - Technical Note | 14 Aug 2026 | View |
| Transport AssessmentTransport Assessment | 14 Aug 2026 | View |
| Trip Generation Technical NoteTrip Generation Technical Note | 14 Aug 2026 | View |
| Vehicle Access and Swept Path AnalysisVehicle Access and Swept Path Analysis | 14 Aug 2026 | View |
| Framework Travel PlanFramework Travel Plan | 14 Aug 2026 | View |
| Framework Construction Traffic Management PlanFramework Construction Traffic Management Plan | 14 Aug 2026 | View |
| Covering Letter and Agent Preface to Phase 1 Land Quality Risk AssessmentCovering Letter and Agent Preface to Phase 1 Land Quality Risk Assessment | 14 Aug 2026 | View |
| Remediation and Restoration StrategyRemediation and Restoration Strategy | 14 Aug 2026 | View |
| Site Investigation Report (February 2022)Site Investigation Report (February 2022) | 14 Aug 2026 | View |
| Phase 1 Preliminary Land Quality Risk AssessmentPhase 1 Preliminary Land Quality Risk Assessment | 14 Aug 2026 | View |
| Landscape and Visual Impact AssessmentLandscape and Visual Impact Assessment | 14 Aug 2026 | View |
| Heritage StatementHeritage Statement | 14 Aug 2026 | View |
| Solar Glint and Glare Screening AssessmentSolar Glint and Glare Screening Assessment | 14 Aug 2026 | View |
| Health Impact Assessment ScreeningHealth Impact Assessment Screening | 14 Aug 2026 | View |
| Grid Assessment for Crumps FarmGrid Assessment for Crumps Farm | 14 Aug 2026 | View |
| UKPN Budget Estimate 8500084503 (2 MVA)UKPN Budget Estimate 8500084503 (2 MVA) | 14 Aug 2026 | View |
| UKPN Budget Estimate 8500084503 (20 MVA)UKPN Budget Estimate 8500084503 (20 MVA) | 14 Aug 2026 | View |
| Applicant Response to Environment Agency ConsultationApplicant Response to Environment Agency Consultation | 14 Aug 2026 | View |
| Applicant Response to County Planning AuthorityApplicant Response to County Planning Authority | 14 Aug 2026 | View |
| Technical Worst-Case MatrixTechnical Worst-Case Matrix | 14 Aug 2026 | View |
| Proposed Draft ConditionsProposed Draft Conditions | 14 Aug 2026 | View |
| Proposed Draft Section 106 Heads of TermsProposed Draft Section 106 Heads of Terms | 14 Aug 2026 | View |
| Location PlanLocation Plan | 14 Aug 2026 | View |
| Existing Site PlanExisting Site Plan | 14 Aug 2026 | View |
| Existing Site Plan w/ DesignationsExisting Site Plan w/ Designations | 14 Aug 2026 | View |
| Existing Site Plan w/ Parameter PlanExisting Site Plan w/ Parameter Plan | 14 Aug 2026 | View |
| Proposed Development AreaProposed Development Area | 14 Aug 2026 | View |
| Proposed Site PlanProposed Site Plan | 14 Aug 2026 | View |
| Proposed Site Access RoadProposed Site Access Road | 14 Aug 2026 | View |
| Proposed Site Plan - Access RoadProposed Site Plan - Access Road | 14 Aug 2026 | View |
| Proposed Site Plan - Acoustic BundsProposed Site Plan - Acoustic Bunds | 14 Aug 2026 | View |
| Proposed Bat CorridorProposed Bat Corridor | 14 Aug 2026 | View |
| Proposed Site Section AA Sheet 1/2Proposed Site Section AA Sheet 1/2 | 14 Aug 2026 | View |
| Proposed Site Section AA Sheet 2/2Proposed Site Section AA Sheet 2/2 | 14 Aug 2026 | View |
| Proposed Site Section BB Sheet 1/2Proposed Site Section BB Sheet 1/2 | 14 Aug 2026 | View |
| Proposed Site Section BB Sheet 2/2Proposed Site Section BB Sheet 2/2 | 14 Aug 2026 | View |
| Proposed Site Section CC Sheet 1/2Proposed Site Section CC Sheet 1/2 | 14 Aug 2026 | View |
| Proposed Site Section CC Sheet 2/2Proposed Site Section CC Sheet 2/2 | 14 Aug 2026 | View |
| Proposed Site Section DD Sheet 1/2Proposed Site Section DD Sheet 1/2 | 14 Aug 2026 | View |
| Proposed Site Section DD Sheet 2/2Proposed Site Section DD Sheet 2/2 | 14 Aug 2026 | View |
| Proposed FootpathsProposed Footpaths | 14 Aug 2026 | View |
| Environmental Statement - Non-Technical Summary (Environmental Report)Environmental Statement - Non-Technical Summary (Environmental Report) | 14 Aug 2026 | View |
| Environmental StatementEnvironmental Statement | 14 Aug 2026 | View |
| Environmental Statement - Appendix A (Site Layout Plan)Environmental Statement - Appendix A (Site Layout Plan) | 14 Aug 2026 | View |
| Environmental Statement - Appendix B (Factual Report on Ground Investigation)Environmental Statement - Appendix B (Factual Report on Ground Investigation) | 14 Aug 2026 | View |
| Environmental Statement - Appendix C (Health and Safety Risk Assessment)Environmental Statement - Appendix C (Health and Safety Risk Assessment) | 14 Aug 2026 | View |
| Environmental Statement - Appendix D (Landfill Gas Risk Assessment)Environmental Statement - Appendix D (Landfill Gas Risk Assessment) | 14 Aug 2026 | View |
| Environmental Statement - Appendix E (Gas Management Plan)Environmental Statement - Appendix E (Gas Management Plan) | 14 Aug 2026 | View |
| Environmental Statement - Appendix F (Gas Extraction System Plan - Manifold)Environmental Statement - Appendix F (Gas Extraction System Plan - Manifold) | 14 Aug 2026 | View |
| Environmental Statement - Appendix G (Gas Extraction System Plan - Non-Manifold)Environmental Statement - Appendix G (Gas Extraction System Plan - Non-Manifold) | 14 Aug 2026 | View |
| Environmental Statement - Appendix H (Leachate Collection System Plan)Environmental Statement - Appendix H (Leachate Collection System Plan) | 14 Aug 2026 | View |
| Consultant Check ListConsultant Check List | 24 Mar 2025 | View |
| Planning StatementPlanning Statement | 24 Mar 2025 | View |
| Supplementary Planning StatementSupplementary Planning Statement | 8 Jul 2025 | View |
| Transport AssessmentTransport Assessment | 20 Nov 2024 | View |
| Flood Risk AssessmentFlood Risk Assessment | 20 Nov 2024 | View |
| Air Quality AssessmentAir Quality Assessment | 20 Nov 2024 | View |
| Noise Impact AssesmentNoise Impact Assesment | 31 Jul 2025 | View |
| Dust Management PlanDust Management Plan | 2 Jun 2025 | View |
| Heritage StatementHeritage Statement | 20 Nov 2024 | View |
| Landscape and Visual Impact AssessmentLandscape and Visual Impact Assessment | 20 Nov 2024 | View |
| Preliminary Ecological AppraisalPreliminary Ecological Appraisal | 20 Nov 2024 | View |
| Biodiversity Net Gain Feasibility AssessmentBiodiversity Net Gain Feasibility Assessment | 20 Nov 2024 | View |
| Biodiversity Net Gain MetricBiodiversity Net Gain Metric | 20 Nov 2024 | View |
| Foul Drainage Strategy - Technical NoteFoul Drainage Strategy - Technical Note | 20 Nov 2024 | View |
| Foul Drainage Strategy - PlanFoul Drainage Strategy - Plan | 20 Nov 2024 | View |
| Thames Water Asset SearchThames Water Asset Search | 20 Nov 2024 | View |
| Location PlanLocation Plan | 4 Mar 2024 | View |
| Existing Site Plan (showing areas)Existing Site Plan (showing areas) | 2 Jun 2025 | View |
| Existing Site Plan SectionsExisting Site Plan Sections | 4 Mar 2024 | View |
| Existing Site Plan Section AAExisting Site Plan Section AA | 4 Mar 2024 | View |
| Existing Site Plan Section BBExisting Site Plan Section BB | 4 Mar 2024 | View |
| Existing Site Plan Section CCExisting Site Plan Section CC | 4 Mar 2024 | View |
| Existing Site Plan Section DDExisting Site Plan Section DD | 4 Mar 2024 | View |
| Proposed Block PlanProposed Block Plan | 4 Mar 2024 | View |
| Proposed FootpathsProposed Footpaths | 4 Mar 2024 | View |
| Proposed Site Plan Acoustic BundsProposed Site Plan Acoustic Bunds | 4 Mar 2024 | View |
| Proposed Site Section AA Sheet 1 of 2Proposed Site Section AA Sheet 1 of 2 | 4 Mar 2024 | View |
| Proposed Site Section AA Sheet 2 of 2Proposed Site Section AA Sheet 2 of 2 | 4 Mar 2024 | View |
| Proposed Site Section BB Sheet 1 of 2Proposed Site Section BB Sheet 1 of 2 | 4 Mar 2024 | View |
| Proposed Site Section BB Sheet 2 of 2Proposed Site Section BB Sheet 2 of 2 | 4 Mar 2024 | View |
| Proposed Site Section CC Sheet 1 of 2Proposed Site Section CC Sheet 1 of 2 | 4 Mar 2024 | View |
| Proposed Site Section CC Sheet 2 of 2Proposed Site Section CC Sheet 2 of 2 | 4 Mar 2024 | View |
| Proposed Site Section DD Sheet 1 of 2Proposed Site Section DD Sheet 1 of 2 | 4 Mar 2024 | View |
| Proposed Site Section DD Sheet 2 of 2Proposed Site Section DD Sheet 2 of 2 | 4 Mar 2024 | View |
| Type 1 Proposed Ground Floor PlansType 1 Proposed Ground Floor Plans | 2 Jun 2025 | View |
| Type 1 Proposed Mezzanine PlansType 1 Proposed Mezzanine Plans | 2 Jun 2025 | View |
| Type 1 Proposed Roof PlansType 1 Proposed Roof Plans | 2 Jun 2025 | View |
| Type 1 Proposed ElevationsType 1 Proposed Elevations | 2 Jun 2025 | View |
| Type 2 Proposed Ground Floor PlansType 2 Proposed Ground Floor Plans | 2 Jun 2025 | View |
| Type 2 Proposed Mezzanine PlansType 2 Proposed Mezzanine Plans | 2 Jun 2025 | View |
| Type 2 Proposed Roof PlansType 2 Proposed Roof Plans | 2 Jun 2025 | View |
| Type 2 Proposed ElevationsType 2 Proposed Elevations | 2 Jun 2025 | View |
| Type 3 Proposed Ground Floor PlansType 3 Proposed Ground Floor Plans | 2 Jun 2025 | View |
| Type 3 Proposed Mezzanine PlansType 3 Proposed Mezzanine Plans | 2 Jun 2025 | View |
| Type 3 Proposed Roof PlansType 3 Proposed Roof Plans | 2 Jun 2025 | View |
| Type 3 Proposed ElevationsType 3 Proposed Elevations | 2 Jun 2025 | View |
| Type 4 Proposed Ground Floor PlansType 4 Proposed Ground Floor Plans | 2 Jun 2025 | View |
| Type 4 Proposed Mezzanine PlansType 4 Proposed Mezzanine Plans | 2 Jun 2025 | View |
| Type 4 Proposed Roof PlansType 4 Proposed Roof Plans | 2 Jun 2025 | View |
| Type 4 Proposed ElevationsType 4 Proposed Elevations | 2 Jun 2025 | View |
| Type 5 Proposed Ground Floor PlansType 5 Proposed Ground Floor Plans | 2 Jun 2025 | View |
| Type 5 Proposed Mezzanine PlansType 5 Proposed Mezzanine Plans | 2 Jun 2025 | View |
| Type 5 Proposed Roof PlansType 5 Proposed Roof Plans | 2 Jun 2025 | View |
| Type 5 Proposed ElevationsType 5 Proposed Elevations | 2 Jun 2025 | View |
| Environmental StatementEnvironmental Statement | 24 Mar 2025 | View |
| Environmental Statement (Appendix A) - Site Layout PlanEnvironmental Statement (Appendix A) - Site Layout Plan | 24 Mar 2025 | View |
| Environmental Statement (Appendix B) - Ground Investigation ReportEnvironmental Statement (Appendix B) - Ground Investigation Report | 24 Mar 2025 | View |
| Environmental Statement (Appendix C) - Health & Safety Risk AssessmentEnvironmental Statement (Appendix C) - Health & Safety Risk Assessment | 24 Mar 2025 | View |
| Environmental Statement (Appendix D) - Landfill Gas Risk AssessmentEnvironmental Statement (Appendix D) - Landfill Gas Risk Assessment | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management PlanEnvironmental Statement (Appendix E) - Gas Management Plan | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management Plan Appendix AEnvironmental Statement (Appendix E) - Gas Management Plan Appendix A | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management Plan Appendix BEnvironmental Statement (Appendix E) - Gas Management Plan Appendix B | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management Plan Appendix CEnvironmental Statement (Appendix E) - Gas Management Plan Appendix C | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management Plan Appendix DEnvironmental Statement (Appendix E) - Gas Management Plan Appendix D | 24 Mar 2025 | View |
| Environmental Statement (Appendix E) - Gas Management Plan Appendix EEnvironmental Statement (Appendix E) - Gas Management Plan Appendix E | 24 Mar 2025 | View |
| Site NoticeSite Notice | 15 Jul 2025 | View |
| Cadent GasCadent Gas | 31 Jul 2025 | View |
| Cadent Gas - PlansCadent Gas - Plans | 31 Jul 2025 | View |
| National GasNational Gas | 31 Jul 2025 | View |
| UKPN - LetterUKPN - Letter | 31 Jul 2025 | View |
| UKPN - PlansUKPN - Plans | 31 Jul 2025 | View |
| UKPN - Symbol GuideUKPN - Symbol Guide | 31 Jul 2025 | View |
| UKPN - Stop Think Before You Dig LeafletUKPN - Stop Think Before You Dig Leaflet | 31 Jul 2025 | View |
| UKPN - Email CommentsUKPN - Email Comments | 1 Aug 2025 | View |
| National GasNational Gas | 11 Aug 2025 | View |
| Active Travel EnglandActive Travel England | 13 Aug 2025 | View |
| Essex Fire and RescueEssex Fire and Rescue | 14 Aug 2025 | View |
| Stansted AirportStansted Airport | 18 Aug 2025 | View |
| Natural EnglandNatural England | 21 Aug 2025 | View |
| Takeley Parish CouncilTakeley Parish Council | 21 Aug 2025 | View |
| Great Canfield Parish CouncilGreat Canfield Parish Council | 21 Aug 2025 | View |
| Great Dunmow Town Council - Comments on ESS/16/24/UTTGreat Dunmow Town Council - Comments on ESS/16/24/UTT | 22 Aug 2025 | View |
| Great Dunmow Town Council - Comments on /OUTGreat Dunmow Town Council - Comments on /OUT | 22 Aug 2025 | View |
| Little Canfield Parish CouncilLittle Canfield Parish Council | 28 Aug 2025 | View |
| Cadent GasCadent Gas | 9 Sept 2025 | View |
| National GasNational Gas | 12 Sept 2025 | View |
| Highway AuthorityHighway Authority | 12 Sept 2025 | View |
| Little Canfield Parish Council and Takeley Parish Council: Transport ObjectionLittle Canfield Parish Council and Takeley Parish Council: Transport Objection | 12 Sept 2025 | View |
| National HighwaysNational Highways | 23 Sept 2025 | View |
| Uttlesford District Council (Covering Letter)Uttlesford District Council (Covering Letter) | 13 Nov 2025 | View |
| Uttlesford District Council (Report)Uttlesford District Council (Report) | 13 Nov 2025 | View |
| LLFALLFA | 20 Nov 2025 | View |
| Place ServciesPlace Servcies | 24 Nov 2025 | View |
| Environment Agency - Comments on /OUTEnvironment Agency - Comments on /OUT | 1 Dec 2025 | View |
| Environment Agency - Comments on ESS/16/24/UTTEnvironment Agency - Comments on ESS/16/24/UTT | 5 Dec 2025 | View |
| National HighwaysNational Highways | 10 Dec 2025 | View |
| National HighwaysNational Highways | 23 Apr 2026 | View |
| Environment Agency - Further comments on ESS/16/24/UTTEnvironment Agency - Further comments on ESS/16/24/UTT | 20 Jul 2026 | View |
Documents open on the council website. Browse council documents if a link has changed.
Conditions aren’t listed here. Read the council decision notice for the full decision and conditions.
Related records could not be loaded.
Understanding planning · 13 min read
Understand planning application documents, officer reports and decision notices. Use a reading checklist, document table and worked example to inspect a case.
Understanding planning · 13 min read
Understand pending consideration, approved, refused and withdrawn planning applications. Compare status labels and find the documents explaining each outcome.
Understanding planning · 13 min read
Read planning drawings, floor plans, elevations and sections. Use labelled diagrams, a drawing comparison table and revision checks to understand a proposal.